HomeMy WebLinkAbout250006-Mirandesa PI Report
PRESSURE IRRIGATION DESIGN
Project: Mirandesa Subdivision and Farmway Crossing Subdivision
Service Area:
The 86.9 acres of Farmway Crossing Subdivision and Mirandesa Subdivision are located within Lot 4
Section 4 and Lot 1 Section 5, Township 3 North, Range 3 West, Boise Meridian, Canyon County Idaho.
Summary:
The purpose of this report is to determine pump station capacity and mainline pipe sizing
through hydraulic analysis for the above service area. This report serves to summarize the design
of the full buildout of the above service area.
All pipes in this model are designed with a maximum pipe velocity of 5ft/s.
All nodes in this model are designed to be between 50 and 85 psi.
The parcels south of both Farmway Crossing Subdivision and Mirandesa Subdivision are not part
of the design of this pump station.
Pump Station Demand:
The Mirandesa Subdivision is a multiuse development. The northwest ±3.4 acres is proposed to be
commercial and ±19.9 acres is to be residential. Farmway Crossing Subdivision is to be single family
residential. The pump station is designed for a total demand of 1 miners inch per acre or 9gpm/acre.
Project Phase Irrigable Acres (AC) Area (AC) Water Right (GPM)
Assumed 1 in/AC
Farmway Crossing ±32.8 ±44.49 400
Mirandesa ±31.2 ±42.37 382
TOTAL ±64 ±86.86 783
Pump Station Design Components:
The following needs review and approval from CMID and their approved contractor prior to purchase or
construction. The pump station will consist of the following:
Design supply of +/- 898 GPM at 165 feet of head (approximately 9 GPM/AC of 87 AC + 40 GPM
for the CW screen, and 66 GPM for Amiad filter)
Clemons Clearwater self-cleaning screen Model CW-800, 12-mesh
AMIAD filter with 30% more capacity than the design demand. Therefore 1 AMIAD SAF-3000 IOM
filter is proposed. With a total capacity of 1170 gpm
A Siemens Sitrans mag flow meter to be installed on the discharge line. The pipe manifold needs
to be 8”. Pipe velocities for 898 GPM will be 4.35ft/s.
Gravity irrigation supply line of 12” pipe at a uniform slope of 0.5%. This provides a maximum
supply of 1634 GPM.
Overflow will discharge into 12” main running south to north through the center of the
subdivision which will then discharge to the existing irrigation standpipe at the northwest corner
into the Bardsley Gulch Drain.
City of Caldwell
APPROVED FOR CONSTRUCTION
These plans and/or specifications have been reviewed
for compliance with the City of Caldwell specifications.
This review does not relieve the owner, engineer, or
contractor of the responsibility to design and/or
construct these facilities in compliance with all current
applicable federal, state, and local laws, rules,
regulations, ordinances, orders of decisions,
development agreements, or specifications.
Inconsistencies not isolated by City staff shall not be
construed as approved unless specifically addressed
as a variance and granted by City Council as a
variance. The City retains the right to enforce
provisions of said document and policies even if
inconsistencies are not noted by the City. Any
revisions of these approved plans will require a
resubmittal for a full review and approval.
Name:Martin Gergen
Appendices:
A. Site Vicinity Map / Pressure Irrigation Layout
B. Pipe Calculations
C. Junction Calculations
Appendix A – Site Map
R/W
R/W
R/W
R/W
R/W
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
EPEP
IS
IS
ISISISISIS
IS ISISIS
ISISIS
IS IS IS IS
IS IS IS IS IS IS IS IS IS IS
IS
IS IS IS IS IS IS IS
IS IS IS IS IS IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
ISIS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
IS
ISISIS
PI
PI
PI PI PI
PI
PI
PI
PI
PI
PI P-1
PUMP PIPE
J-1
J-2J-3
J-4
J-5J-6
J-7
J-8 J-9
J-11
J-12
J-13 J-14
J-15
J-10
J-16J-17J-18
J-19 J-20
J-21
J-22
J-23
J-24
J-25J-26
J-27
J-28
J-29
J-30
J-31
J-32
J-33
J-34
J-35
J-36
J-37
J-38
J-39
J-40
J-41 J-42
J-43
J-44
J-45
J-46
J-47
J-48
J-49
P-2
P-3
P-4
P-5
P-6
P-7
P-8
P-9
P-11
P-12
P-10
P-13
P-14 P-15
P-16P-17
P-18
P-19
P-20
P-21
P-22
P-23
P-24
P-25
P-26
P-27
P-28
P-29
P-30
P-31
P-32
P-33
P-34
P-35
P-36
P-37P-38
P-39
P-40
P-41
P-42 P-43
P-44
P-50
P-46
P-47
P-48
P-49
P-45
P-51
P-52
P-53
P-54
P-55
Upland
Engineers
INFO@UPLANDENGINEERS.COM
DATE:PROJECT #:2025/10/31 250006
0 100 200 400
FARMWAY CROSSING SUBDIVISION / MIRANDESA SUBDIVISION
PRESSURE IRRIGATION REPORT EXHIBIT
USTICK ROAD
FA
R
M
W
A
Y
R
O
A
D
FARMWAY CROSSING SUBDIVISION
±44.49 ACRES
MIRANDESA SUBDIVISION
±42.37 ACRES
Appendix B – Pipe Calculations
FlexTable: Pipe Table
Label Length (Scaled)
(ft)
Start Node Stop Node Diameter
(in)
Material Flow
(gpm)
Velocity
(ft/s)
P-1 161 J-1 J-2 6.0 PVC 427 4.85
P-2 157 J-2 J-3 6.0 PVC 243 2.76
P-3 181 J-3 J-4 6.0 PVC 93 1.05
P-4 83 J-4 J-5 6.0 PVC 79 0.90
P-5 185 J-5 J-6 6.0 PVC 79 0.90
P-6 85 J-6 J-7 6.0 PVC 75 0.85
P-7 398 J-7 J-8 6.0 PVC 58 0.66
P-8 300 J-9 J-8 6.0 PVC 58 0.66
P-9 216 J-3 J-9 6.0 PVC 134 1.52
P-10 60 J-1 J-10 6.0 PVC 322 3.66
P-11 113 J-10 J-11 6.0 PVC 322 3.66
P-12 35 J-11 J-12 6.0 PVC 322 3.66
P-13 112 J-12 J-13 6.0 PVC 77 0.87
P-14 405 J-13 J-14 6.0 PVC 45 0.51
P-15 94 J-14 J-15 6.0 PVC 7 0.08
P-16 43 J-17 J-16 6.0 PVC 75 0.85
P-17 242 J-18 J-17 6.0 PVC 83 0.94
P-18 205 J-2 J-18 6.0 PVC 184 2.09
P-19 611 J-18 J-19 6.0 PVC 77 0.88
P-20 239 J-20 J-19 6.0 PVC 20 0.22
P-21 89 J-21 J-20 6.0 PVC 27 0.30
P-22 493 J-22 J-21 6.0 PVC 51 0.57
P-23 41 J-16 J-22 6.0 PVC 75 0.85
P-24 361 J-19 J-23 6.0 PVC 63 0.71
P-25 395 J-9 J-23 6.0 PVC 64 0.72
P-26 185 J-23 J-24 6.0 PVC 101 1.15
P-27 63 J-24 J-25 6.0 PVC 97 1.10
P-28 50 J-25 J-26 6.0 PVC 97 1.10
P-29 403 J-8 J-26 6.0 PVC 94 1.06
P-30 444 J-26 J-27 6.0 PVC 175 1.99
P-31 707 J-12 J-28 6.0 PVC 226 2.57
P-32 117 J-28 J-29 6.0 PVC 127 1.44
P-33 490 J-29 J-30 6.0 PVC 83 0.95
P-34 127 J-31 J-30 6.0 PVC 21 0.24
P-35 82 J-48 J-31 6.0 PVC 28 0.31
P-36 293 J-27 J-48 6.0 PVC 76 0.86
P-37 605 J-27 J-32 6.0 PVC 69 0.78
P-38 273 J-32 J-33 6.0 PVC 41 0.47
P-39 104 J-33 J-34 6.0 PVC 32 0.36
P-40 322 J-34 J-35 6.0 PVC 18 0.21
P-41 105 J-35 J-36 6.0 PVC 7 0.08
P-42 533 J-37 J-36 6.0 PVC 19 0.22
P-43 159 J-38 J-37 6.0 PVC 59 0.66
P-44 290 J-30 J-38 6.0 PVC 59 0.66
P-45 120 J-37 J-39 6.0 PVC 15 0.17
P-46 345 J-40 J-39 6.0 PVC 64 0.72
P-47 116 J-41 J-40 6.0 PVC 80 0.91
P-48 428 J-42 J-41 6.0 PVC 80 0.91
P-49 281 J-28 J-42 6.0 PVC 80 0.91
P-50 149 J-39 J-43 6.0 PVC 62 0.70
P-51 459 J-43 J-44 6.0 PVC 47 0.54
P-52 81 J-44 J-45 6.0 PVC 30 0.34
P-53 313 J-45 J-46 6.0 PVC 27 0.30
P-54 240 J-46 J-47 6.0 PVC 13 0.15
P-55 606 J-48 J-49 6.0 PVC 21 0.24
P-56 28 PMP-1 PS 8.0 PVC 577 3.68
P-57 28 T-1 PMP-1 8.0 PVC 577 3.68
P-58 25 PMP-2 PS 6.0 PVC 173 1.96
P-59 26 T-1 PMP-2 6.0 PVC 173 1.96
Pump Pipe 103 PS J-1 8.0 PVC 749 4.78
250006-PI MODEL 2026-1-22.wtg Bentley Systems, Inc. Haestad Methods Solution Center
WaterCAD
[24.00.02.20]
1/22/2026 76 Watertown Road, Suite 2D Thomaston, CT 06787 USA
+1-203-755-1666
Page 1 of 1
Appendix C – Junction Calculations
FlexTable: Junction Table
Label Elevation
(ft)
Demand
(gpm)
Hydraulic Grade
(ft)
Pressure
(psi)
J-1 2,457.66 0 2,605.97 64
J-2 2,459.10 0 2,604.07 63
J-3 2,460.49 16 2,603.42 62
J-4 2,461.47 13 2,603.29 61
J-5 2,461.91 0 2,603.25 61
J-6 2,462.97 4 2,603.12 61
J-7 2,463.37 17 2,603.07 60
J-8 2,465.50 22 2,602.92 59
J-9 2,461.20 12 2,603.03 61
J-10 2,457.31 0 2,605.42 64
J-11 2,457.68 0 2,604.39 63
J-12 2,457.85 19 2,604.08 63
J-13 2,458.98 31 2,604.00 63
J-14 2,461.00 38 2,603.91 62
J-15 2,463.36 7 2,603.91 61
J-16 2,461.63 0 2,603.21 61
J-17 2,461.44 8 2,603.23 61
J-18 2,460.00 24 2,603.41 62
J-19 2,462.68 34 2,603.02 61
J-20 2,463.87 7 2,603.03 60
J-21 2,464.24 24 2,603.04 60
J-22 2,461.89 24 2,603.18 61
J-23 2,461.86 25 2,602.85 61
J-24 2,462.48 5 2,602.66 61
J-25 2,463.43 0 2,602.60 60
J-26 2,464.45 15 2,602.55 60
J-27 2,464.61 31 2,601.23 59
J-28 2,457.26 19 2,601.51 62
J-29 2,455.86 43 2,601.36 63
J-30 2,459.27 46 2,601.08 61
J-31 2,461.58 6 2,601.09 60
J-32 2,464.95 27 2,600.99 59
J-33 2,466.18 9 2,600.95 58
J-34 2,465.79 14 2,600.94 58
J-35 2,464.19 12 2,600.93 59
J-36 2,463.73 26 2,600.93 59
J-37 2,460.60 24 2,600.95 61
J-38 2,457.23 0 2,601.00 62
J-39 2,461.79 17 2,600.95 60
J-40 2,465.85 17 2,601.07 59
J-41 2,467.51 0 2,601.13 58
J-42 2,457.33 0 2,601.36 62
J-43 2,463.26 15 2,600.90 60
J-44 2,468.73 18 2,600.80 57
J-45 2,470.00 3 2,600.80 57
J-46 2,473.18 13 2,600.78 55
J-47 2,475.65 13 2,600.77 54
J-48 2,462.65 27 2,601.09 60
J-49 2,466.79 21 2,601.07 58
PS 2,458.10 0 2,606.81 64
250006-PI MODEL 2026-1-22.wtg
Bentley Systems, Inc. Haestad Methods
Solution Center
WaterCAD
[24.00.02.20]
1/22/2026 76 Watertown Road, Suite 2D Thomaston,
CT 06787 USA +1-203-755-1666
Page 1 of 1
Appendix C – Junction Calculations
D - Dan's Pumps Quote
Dan's Pump and Filter, LLC.
P.O. Box 370
+12085856345
ADDRESS
Zane Cradic
upland engineers
Estimate 2117
DATE 01/30/2026
EXPIRATION DATE 07/30/2026
JOB NAME
Mirendesa
ACTIVITY QTY RATE AMOUNT
6' Vault Cover 2 Turbines 1 Well
Pump #1 10 HP Oil Lube 171 GPM @
160' Turbine
Pump #2 40 HP Water Lube 742 GPM
@ 160'
Amiad SAF 6000 10" With SLN
Amiad Level 2 Controller
ABB ACS 580 Series VFD On Each
Pump
2 Transducers
8" AG3000 Flow Meter With Pulse
Output
WF10LP VFD Enclosure/Back Panel
WF40LP VFD Enclosure /Back Panel
Float
Low Level Controls
SCADA Installed
8" Pump Manifold
8" X 10" Filter Manifold
8" Discharge Manifold
2" PSV
2 Nelson Air Release Valves
10 HP Harmonic Filter Wall Mount
40 HP Harmonic Filter Wall Mount
Banjo Filter On CW Line
2 6" Check valves
2 6" Spools
ACTIVITY QTY RATE AMOUNT
2 6" GO BFV
10" Check Valve (drilled)
10" GO BFV
Building Sign
Fire Extinguisher
Ball Valves
B/N/G
Rekey Locks
2 Panel kits
Freight
All Electrical To Include Meter Base
16' X 30' Custom Concrete Pad
16' X 30' Building
Building Permit
Architect
Excavation/Conduit From Transformer
To Meter Base If Less Then 50'
Installation
Programming
Material
As Per Bid
1 243,035.30 243,035.30T
WELL-Incomplete-distance well to
pump house for pipe/conduit/wire and
excavation-Best guess on pump sizing
can't confirm until test pumping
completed
60 HP Submersible Pump 770 GPM
@ 200'
60 HP 6" 460 VAC 3 Phase Motor
168' 8" Steel Pipe
2 8" DI Check Valves Flowmatic
Splice Kit
Baker Pitless unit
8" AG3000 Flow Meter
8" Manifold
B/N/G
Submersible Transducer
ABB ACS 580 Series VFD
WF75LP VFD Enclosure/Back Panel
Misc. Electrical
Panel Kit
8" GO BFV
60 HP DVDT Filter
ACTIVITY QTY RATE AMOUNT
60 HP Harmonic Filter
170' #2 Flat Jacket Well Cable
Welding
Installation
Programming
Material
As Per Bid
1 82,278.70 82,278.70T
Here's your Estimate. We appreciate the opportunity to do
business with you. Please let us know if you have any
questions.
Thank you,
Dan's Pump and Filter LLC.
SUBTOTAL 325,314.00
TAX 0.00
TOTAL $325,314.00
Accepted By Accepted Date
Appendix C – Junction Calculations
E - Boise Project e-mail
1
Melanie Hankerd
From:Tom Ritthaler <tritthaler@boiseproject.org>
Sent:Tuesday, March 3, 2026 10:07 AM
To:Melanie Hankerd
Subject:Re: Mirandesa and Farmway Crossing
Attachments:Outlook-eu0lraqm
Follow Up Flag:Follow up
Flag Status:Flagged
Melanie,
This is to serve as notification that the water has already been assigned to headgate number 6.19
(not the 6.20 as my secretary had that wrong in the previous communication) for Farmway crossing and
Mirandesa Subdivision for a total of 86.86 acres. No further notification will be needed or provided as
this is an internal move on our end only. No physical water rights are being moved only delivery point.
Tom
Thomas B Ritthaler
Assistant Project Manager
Boise Project Board of Control
2465 Overland Rd.
Boise, Idaho 83705
208-344-1141
From: Melanie Hankerd <mhankerd@uplandengineers.com>
Sent: Tuesday, March 3, 2026 9:36 AM
To: Tom Ritthaler <tritthaler@boiseproject.org>
Cc: Zane Cradic <zcradic@uplandengineers.com>
Subject: RE: Mirandesa and Farmway Crossing
Good morning Tom,
The City is requesting that we have correspondence from the Boise Project Board of Control that we can
move 44.49 acres for Farmway Crossing Subdivision and 42.37 acres for Mirandesa Subdivision water
rights to Pioneer Lateral 6.20 headgate. Can you please confirm all the water can be delivered to this
headgate?
Thank you,
2
Melanie Hankerd, PE
O: 208.918.4050
C:907.738.1222
From: Tom Ritthaler <tritthaler@boiseproject.org>
Sent: Thursday, February 26, 2026 12:39 PM
To: Melanie Hankerd <mhankerd@uplandengineers.com>
Subject: Re: Mirandesa and Farmway Crossing
Melanie,
It will be on the Pioneer Lateral 6.20 headgate. I will make the necessary changes on my end. No
further paperwork will be needed.
Thanks,
Tom
Thomas B Ritthaler
Assistant Project Manager
Boise Project Board of Control
2465 Overland Rd.
Boise, Idaho 83705
208-344-1141
From: Tom Ritthaler <tritthaler@boiseproject.org>
Sent: Thursday, February 26, 2026 12:28 PM
To: Melanie Hankerd <mhankerd@uplandengineers.com>
Subject: Re: Mirandesa and Farmway Crossing
I apologize, I also need the headgate number we are talking about being transferred to.
Tom
Thomas B Ritthaler
Assistant Project Manager
Boise Project Board of Control
2465 Overland Rd.
Boise, Idaho 83705
208-344-1141
3
From: Melanie Hankerd <mhankerd@uplandengineers.com>
Sent: Thursday, February 26, 2026 11:47 AM
To: Tom Ritthaler <tritthaler@boiseproject.org>
Cc: Zane Cradic <zcradic@uplandengineers.com>
Subject: RE: Mirandesa and Farmway Crossing
HI Tom,
Please see below for Wilder accounts:
W-180, 42.48 acres
W-162, 29.836 acres
W-162-2, 9.5 acres
Thank you,
Melanie Hankerd, PE
O: 208.918.4050
C:907.738.1222
From: Tom Ritthaler <tritthaler@boiseproject.org>
Sent: Wednesday, February 25, 2026 5:01 PM
To: Melanie Hankerd <mhankerd@uplandengineers.com>
Subject: Re: Mirandesa and Farmway Crossing
I need the Wilder Irrigation assessment account numbers for the exact properties in the name of the city
of Caldwell to move forward with this.
Thanks,
Tom Ritthaler
BPBC
On Feb 25, 2026, at 2:59 PM, Melanie Hankerd <mhankerd@uplandengineers.com> wrote:
Good afternoon Tom,
I wanted to reach out regarding a project Upland Engineers is working on located in
Caldwell, ID.
4
The project is Mirandesa Subdivision located at the southeast corner of Farmway Road and
Ustick Road intersection, please see link below of Mirandesa Subdivisions No.1
construction drawings/preplat:
Boise Project
The Pioneer Lateral runs adjacent to the eastern perimeter of the project and we are not
proposing any improvements or encumbrances into the existing easements. The City
would like to move 44.49 acres for Farmway Crossing Subdivision and 42.37 acres for
Mirandesa Subdivision water rights to the headgate location shown on the Mirandesa Sub
No. 1 plans, approximately 500 feet south of Ustick Road. This headgate currently serves
half of the Mirandesa Subdivision.
What is the process to formally submit this for review?
Thanks!
Melanie Hankerd, PE
O: 208.918.4050
C:907.738.1222