SUBJECT: Farmway Crossing No. 1 | Final Plat Narrative
Dear Planning and Zoning Staff,
A. Site-Specific Requirements
At the time of building permit submittal, all residential structures within Farmway Crossing #1 will adhere
to the height requirements and standards outlined in the R-1 zoning district. Building plans will confirm
compliance prior to issuance of any permits.
B. General Requirements
All development activities associated with Farmway Crossing #1 will conform to the applicable municipal
codes, standards, and policies of the City of Caldwell. Any identified nuisances will be resolved prior to
construction drawing approval. Modifications to approved plans will be submitted for review as required.
Construction waste disposal will be coordinated through the City’s contracted provider, and all businesses
operating within the subdivision will obtain proper licensing. The applicant acknowledges that compliance
with all local, state, and federal regulations is required throughout the duration of the project.
C. Site Design and Development Standards
The final plat and construction drawings are designed to meet current city standards for height, setbacks,
and lot area, consistent with the approved preliminary plat. Any future revisions to the site plan,
elevations, or concept plan will be submitted for City review and approval. Stormwater design will strictly
adhere to the Caldwell Stormwater Management Manual to ensure on-site retention and compliance with
open space and landscape buffer requirements.
D. Fire Department Conditions
The applicant will comply with all requirements of the Caldwell Fire Department as outlined in their memo
dated September 10, 2024. Fire access, emergency turnarounds, and hydrant spacing will be coordinated
and reviewed at the construction drawing stage. Final hydrant placement will be approved by the Fire
Marshal prior to construction.
E. Engineering Department Conditions
All conditions provided by the City Engineering Department (memo dated December 4, 2024) and the
Mapping Department (memo dated December 5, 2024) will be satisfied prior to final plat signature.
F. Landscaping Requirements
The approved landscape plan for Farmway Crossing #1 will be implemented per the conditions of approval
and Caldwell City Code. The HOA will maintain all landscaped areas in a live and healthy condition,
consistent with city standards.
The applicant acknowledges the requirement to record the final plat within twenty-four (24) months of
the approving order of decision. Subsequent phases will follow the approved preliminary plat sequence
and adhere to the two-year interval rule for recording. Approved Subdivision names, Street names, lot
numbering and block numbering, and subdivision phasing configuration will remain as approved by the
City Mapping Division. Any changes will be submitted for review prior to final plat recording.