Loading...
HomeMy WebLinkAboutLandscapePlans_HuntingtonRidgeEast#3LINCOLN RDN. G E O R G I A A V E MA S O N R D AV I A T I O N W A Y PROJECT LOCATION PHASE 1 PHASE 2 FUTURE PHASES MARBLE FRONT RD SYMBOL COMMON NAME BOTANICAL NAME SIZE CONTAINER MATURE SIZE WATER DEMAND QTY REMARKS CLASS II TREES CHANTICLEER CALLERY PEAR PYRUS CALLERYANA 'CHANTICLEER'2" CAL.B&B 30`X25`2 9 PIN OAK QUERCUS PALUSTRIS 2" CAL.B&B 60`X35`4 4 GREENSPIRE LITTLELEAF LINDEN TILIA CORDATA 'GREENSPIRE'2" CAL.B&B 40`X35`3 8 MUSASHINO JAPANESE ZELKOVA ZELKOVA SERRATA `MUSASHINO`2" CAL.B&B 50`X35`4 11 EVERGREEN TREES AUSTRIAN PINE PINUS NIGRA 2" CAL.B&B 60`X35`2 1 DECIDUOUS SHRUBS BUD'S YELLOW DOGWOOD CORNUS ALBA 'BUD'S YELLOW'2 GAL.POT 6`X6`2 99 RED TWIG DOGWOOD CORNUS SERICEA 2 GAL.POT 8`X8`2 51 UPRIGHT ALDER BUCKTHORN RHAMNUS FRANGULA 'COLUMNARIS'2 GAL.POT 10`X6`2 31 GRO-LOW FRAGRANT SUMAC RHUS AROMATICA 'GRO-LOW'2 GAL.POT 2`X6`2 7 DOUBLE KNOCK OUT ROSE ROSA X 'RADTKO' TM 2 GAL.POT 3.5`X3.5`2 34 EVERGREEN SHRUBS BLUE ARROW JUNIPER JUNIPERUS SCOPULORUM 'BLUE ARROW'2 GAL.POT 15`X2`1 17 PERENNIALS STELLA DE ORO DAYLILY HEMEROCALLIS X 'STELLA DE ORO'2 GAL.POT 2`X3`3 98 SYMBOL COMMON NAME BOTANICAL NAME QTY REMARKS LANDSCAPE MATERIALS 1.5" CRUSHED BROWN & TAN ROCK MULCH 9,642 SF APPLY 3.0" MAX DEPTH IN AREAS INDICATED ON PLANS. ALL MULCH AREAS SHALL RECEIVE 4" TOPSOIL AND BE IRRIGATED WITH A PRESSURIZED, AUTOMATIC IRRIGATION SYSTEM. CRUSHED GRAVEL ROCK MULCH 5,125 SF 1/2"-3/4" SIZE CRUSHED STONE PATH ROCK MULCH 5,059 SF 3/8" 'CLEAN' HIGH TRAFFIC LAWN AREA - SOD 16,595 SF INSTALL SOD AS INDICATED ON PLANS WITH DROUGHT TOLERANT FESCUE BLEND. ALL LAWN AREAS SHALL BE IRRIGASTED WITH A PRESSURIZED, AUTOMATIC IRRIGATION SYSTEM. HORSESHOE SAND 44 SF MASON SAND / PLAY PIT SAND RIVER COBBLE ROCK MULCH 12,187 SF 102" COBBLE SIZE PLANT SCHEDULE PHASE 3 1.GENERAL NOTES A.ALL CONTRACTOR WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE MOST CURRENT VERSION OF IDAHO STANDARDS OF PUBLIC WORKS CONSTRUCTION, APPLICABLE STATE CODES AND STANDARDS, AND CITY OF CALDWELL CODES. B.THE CONTRACTOR SHALL OBTAIN AND PAY FOR ANY NECESSARY PERMITS RELATED TO THIS ASSOCIATED WORK UNLESS PREVIOUSLY EXECUTED. C.CONTRACTOR SHALL COORDINATE WITH CIVIL ENGINEERING DRAWINGS FOR OBTAINING PAVING, UTILITY, AND GRADING INFORMATION. D.THE CONTRACTOR SHALL COMPLY WITH ALL LAWS AND ORDINANCES BEARING ON THE OPERATION OR CONDUCT OF THE WORK AS DRAWN AND SPECIFIED. E.THE OWNER'S REPRESENTATIVE RETAIN THE RIGHT TO INSPECT THE WORK AT ANY TIME. F.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND LEGAL DISPOSAL OF ALL RUBBISH, AND DEBRIS MATERIAL FROM THE JOB, AS NECESSARY, TO KEEP A CLEAN PROJECT SITE. G.ALL SCALED DIMENSIONS IN THE DRAWINGS ARE APPROXIMATE. BEFORE PROCEEDING WITH ANY WORK, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING AND VERIFYING ALL DIMENSIONS AND SHALL IMMEDIATELY INFORM THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES. 2.EXISTING CONDITIONS A.ALL STRUCTURES, UTILITIES AND OTHER EXISTING SITE FEATURES IMPACTED BY THESE DRAWINGS SHALL BE LOCATED PRIOR TO CONSTRUCTION AND PROTECTED. CALL DIG-A-LINE AT 811 FOR LOCATION ASSISTANCE. ANY DAMAGE TO THE ABOVE MENTIONED SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. B.SEE CIVIL ENGINEERING DRAWINGS FOR ADDITIONAL INFORMATION ON EXISTING CONDITIONS. C.IF SITE CONDITIONS DIFFER FROM WHAT IS DEPICTED ON PLANS, THE CONTRACTOR SHALL CONTACT OWNER'S REPRESENTATIVE FOR FURTHER GUIDANCE. D.NO TREES SHALL BE REMOVED, PRUNED, OR OTHERWISE ALTERED UNLESS OUTLINED PER THESE PLANS OR APPROVED AMENDMENTS TO THESE DOCUMENTS. WRITTEN AMENDMENTS ARE REQUIRED. E.SHALL ANY TREES OUTSIDE THOSE INDICATED FOR REMOVAL BE DAMAGED BY CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT. REPLACEMENT SHALL BE OF A SIMILAR SIZE AND APPROPRIATE SPECIES. THE OWNER'S REPRESENTATIVE SHALL APPROVE OF ALL REPLACEMENTS PRIOR TO INSTALLATION. F.IF EXISTING PLANT MATERIAL IS TO REMAIN AND BE PROTECTED, SEE SPECIFIC NOTES. 3.GRADING AND SITE PREPARATION A.SEE ENGINEERING DRAWINGS FOR ALL GRADING / DRAINAGE FACILITY AND PIPING INFORMATION. B.PREPARE SITE BY GRUBBING AND REMOVING WEEDS. IF NECESSARY, APPLY ROUND-UP OR EQUIVALENT HERBICIDE USING A CERTIFIED APPLICATOR PER MANUFACTURER GUIDELINES. DO NOT APPLY HERBICIDE TO AREAS THAT WILL RECEIVE SOD / SEED/ OR BULBS. C.REMOVE ALL ROCKS AND MISCELLANEOUS DEBRIS OVER 2” IN DIAMETER. D.REMOVE ALL GRAVEL OVERPREP ADJACENT TO ROADWAYS AND WALKWAYS. E.ALL MISCELLANEOUS DEBRIS THAT IS DETRIMENTAL TO SUCCESSFUL PLANT GROWTH SHALL BE REMOVED SHALL BE LEGALLY DISPOSED OFF SITE. F.FINE GRADE TO ELEVATIONS SET BY ENGINEERING DRAWINGS WITH POSITIVE DRAINAGE AWAY FROM STRUCTURES AND WALKWAYS. G.FINE GRADING SHALL HAVE GRADUAL TRANSITIONS AND SHALL NOT CHANGE THE FLOW OR DIRECTION OF SURFACE WATER DEPICTED ON ENGINEERING DRAWINGS. 4.SOILS A.ALL LAWN AREAS SHALL RECEIVE A MINIMUM OF 6” TOPSOIL. ·SMOOTH, COMPACT AND FINE GRADE TOPSOIL IN LAWN AREAS TO UNIFORM GRADE 0.5” BELOW ADJACENT HARD SURFACES. B.TREE PITS SHALL BE FILLED WITH 100% TOPSOIL. C.ALL PLANTER AREAS SHALL RECEIVE A MINIMUM OF 8" TOPSOIL. D.IT IS ACCEPTABLE TO REUSE EXISTING TOPSOIL THAT HAS BEEN STOCKPILED ON SITE IF: ·TOPSOIL IS TESTED AND ANALYZED TO ENSURE A PROPER NUTRIENT CONTENT FOR SUCCESSFUL PLANT GROWTH. ·TOPSOIL HAS A pH OF 6.5-8.0. ·TOPSOIL IS LOOSE, FRIABLE SANDY LOAM THAT IS CLEAN OF ROCKS 2" IN DIAMETER AND LARGER, TOXIC MATERIALS, NOXIOUS WEEDS, WEED SEEDS, GRASS AND OTHER EXTRANEOUS MATERIAL SEEN AS HARMFUL TO PLAT HEALTH. ·CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL TESTING REQUIRED TO ENSURE A PROPER TOPSOIL ANALYSIS. D.IF TOPSOIL DOES NOT MEET THE MINIMUM STANDARDS LISTED ABOVE, CONTRACTOR IS RESPONSIBLE FOR PROVIDING APPROVED IMPORTED TOPSOIL OR AMENDING EXISTING TOPSOIL TO MEET ABOVE SPECIFICATION. E.IF IMPORTED TOPSOIL IS USED IT SHALL BE FROM A LOCAL SOURCE AND BE SCREENED TO MEET ALL ABOVE LISTED MINIMUM STANDARDS AND INCLUDE A TOPSOIL ANALYSIS FROM SELLER. 5.LAWN AREAS A.SOD SHALL BE LOCALLY OR REGIONALLY HARVESTED AND LAID WITHIN 24 HOURS OF CUTTING. B.SOD SHALL FORM A FITTED MASS WITH OFFSET, TIGHTLY FITTED JOINTS ON EVEN GRADE. C.ANY EXISTING LAWN THAT IS DAMAGED BY CONSTRUCTION ACTIVITIES SHALL BE REPLACED OF THE SAME TYPE OF LAWN. D.TREE RINGS SHALL BE PROVIDED AROUND ALL TREES LOCATED IN LAWN AREAS, PER PROVIDED DETAIL. E.LAWN ADJACENT TO BUILDINGS OR OTHER STRUCTURES SHALL BE PLACED 18" AWAY FROM FOUNDATIONS. LAWN ADJACENT TO FENCES OR OTHER VERTICAL ELEMENTS SHALL BE A MINIMUM OF 6" AWAY. ·INSTALL APPROVED MULCH TYPE IN MOW STRIP AT A DEPTH OF 3" OVER COMMERCIAL GRADE WEED BARRIER FABRIC INSTALLED PER MANUFACTURER RECOMMENDATIONS. 6.PLANTER BEDS A.ALL PLANTER BEDS SHALL RECEIVE THE SPECIFIED MULCH TYPE ON TOP OF COMMERCIAL GRADE WEED BARRIER FABRIC INSTALLED PER MANUFACTURER RECOMMENDATIONS. 7.PLANT MATERIAL A.ALL PLANT MATERIAL SHALL MEET OR EXCEED THE MINIMUM FEDERAL STANDARD AS REGULATED BY ANSI z60.1, AMERICAN STANDARD FOR NURSERY STOCK. PLANTS NOT MEETING THESE STANDARDS OR PLANTS DETERMINED TO BE OTHERWISE UNHEALTHY BY THE OWNER'S REPRESENTATIVE, SHALL BE REJECTED AND REPLACED AT THE CONTRACTOR'S COST. B.QUANTITIES SHOWN ARE FOR GENERAL REFERENCE ONLY. CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL QUANTITY ESTIMATES. C.INSTALL ONLY SPECIFIED PLANTS OR LISTED SUBSTITUTIONS. UNAPPROVED SUBSTITUTES SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. D.TREES SHALL NOT BE PLANTED WITHIN CLEAR VISION TRIANGLES, AS SHOWN ON PLAN. E.SHRUBS OVER 30" IN HEIGHT SHALL NOT BE PLANTED WITHIN CLEAR VISION TRIANGLES. F.TREE AND SHRUB PLANTING SHALL INCLUDE FERTILIZATION WITH 'AGRIFORM' OR OTHER APPROVED EQUAL PLANTING TABLET. APPLY PER MANUFACTURER RECOMMENDATIONS. G.TREES AND/OR LARGE SHRUBS SHALL NOT BE PLACED WITHIN 10' OF ANY STORM DRAIN PIPING, STRUCTURES, OR FACILITIES. H.ROOT BARRIERS MUST BE INSTALLED IN STREET PLANTERS WITH A WIDTH OF 6' OR LESS AND SHALL BE INSTALLED PER MANUFACTURER RECOMMENDATIONS. I.TREES SHALL NOT BE PLANTED WITHIN 50' OF A STOP SIGN. J.ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF 30 DAYS BEGINNING AT THE DATE OF ACCEPTANCE BY OWNER. ALL DEAD OR UNHEALTHY PLANT MATERIAL SHALL BE REPLACED WITH THE SAME TYPE AND SIZE AT NO COST TO THE OWNER. 8.IRRIGATION SYSTEM A.ALL LANDSCAPE AREAS SHALL BE IRRIGATED WITH AN UNDERGROUND, AUTOMATIC IRRIGATION SYSTEM OPERATED BY AN INDUSTRY STANDARD CONTROLLER. B.IRRIGATED AREAS SHALL BE DESIGNED BY HYDROZONE TO MEET THE WATER NEEDS OF PLANT MATERIAL TO DUE DIFFERING EXPOSURES / DROUGHT TOLERANCE. ·LAWNS AND PLANTER BEDS SHALL NOT BE IRRIGATED ON THE SAME HYDROZONE. C.PRESSURE IRRIGATION SERVICE SHALL BE UTILIZED, IF PROVIDED. D.IF PRESSURE IRRIGATION SERVICE IS NOT PROVIDED, ANY MUNICIPAL WATER SOURCE CONNECTION SHALL BE EQUIPPED WITH A BACKFLOW PREVENTION ASSEMBLY THAT MEETS THE FOLLOWING SPECIFICATIONS: ·MAKE AND MODEL IS LISTED ON U.S.C.'S LIST OF APPROVED DEVICES ·IS COMPLIANT WITH THE CURRENT IDAHO STATE PLUMBING CODE. ·PROTECTIVE ENCLOSURE SHALL BE PROVIDED IF REQUESTED BY OWNER AND INSTALLED PER MANUFACTURER RECOMMENDATIONS. E.IRRIGATION SYSTEM SHALL BE DESIGNED TO THE FOLLOWING SPECIFICATIONS: ·LAWNS: POP-UP ROTOR OR SPRINKLER BODIES WITH SPRAY OR ROTATOR NOZZLES 100% DOUBLE COVERAGE / HEAD TO HEAD ·LOW MAINTENANCE GRASS: 50% COVERAGE / RADIUS TO RADIUS ·PLANTING BEDS: MICRO (DRIP) IRRIGATION ·SPRINKLER HEADS SHALL HAVE MATCHED PRECIPITATION RATES WITHIN EACH CONTROL VALVE CIRCUIT. ·OVERSPRAY ONTO IMPERVIOUS SURFACES SHALL NOT BE ACCEPTED. F.CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR TO LOCATE AND INSTALL ALL CONDUIT NEEDS FOR EFFICIENT IRRIGATION PIPING G.PEDESTAL MOUNTED CONTROLLER(S) SHALL BE LOCATED WITHIN A PLANTING BED IN AN EASILY ACCESSIBLE, BUT VISIBLY DISCRETE LOCATION. H.WALL MOUNTED CONTROLLER LOCATION SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR. I.IF REQUESTED, CONTRACTOR SHALL SUPPLY OWNER WITH AS BUILT SHOP DRAWINGS OF THE INSTALLED IRRIGATION SYSTEM. AT MINIMUM: CONDUIT LOCATIONS, SUPPLY LINE LOCATION AND SIZING, AND MANUFACTURER PRODUCT INFORMATION. J.SEEPAGE BEDS MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THE CONSTRUCTION AND INSTALLATION OF THE LANDSCAPE IRRIGATION SYSTEM. CO V E R S H E E T L1.00 DEVELOPER JASON HORNE HAYDEN HOMES IDAHO, LLC 1406 N MAIN ST, SUITE 109 MERIDIAN, ID 83646 PH: 208-948-7012 JHORNE@HAYDEN-HOMES.COM LANDSCAPE ARCHITECT JAIME SNYDER, LA ARDURRA 1144 S SILVERSTONE WAY, STE320 MERIDIAN, ID 83642 PH: 208-323-2288 SITE DATA SHEET INDEX L1.00 COVER SHEET L2.00 OVERALL LANDSCAPE PLAN L2.01 LANDSCAPE PLAN - AREA ONE L2.02 LANDSCAPE PLAN - AREA TWO & THREE L3.00 LANDSCAPE DETAILS L3.01 LANDSCAPE DETAILS L3.02 LANDSCAPE NOTES/SPECIFICATIONS 22 " x 3 4 " C A R D U R R A G R O U P , I N C . T H I S I N S T R U M E N T I S T H E P R O P E R T Y O F A R D U R R A . A N Y R E P R O D U C T I O N , R E U S E O R M O D I F I C A T I O N O F T H I S I N S T R U M E N T O R I T S C O N T E N T S W I T H O U T S P E C I F I C W R I T T E N P E R M I S S I O N O F A R D U R R A I S S T R I C T L Y P R O H I B I T E D DE S I G N E D DR A W N CH E C K E D AP P R O V E D BO R D E R S I Z E PROJECT: DATE: L: \ 2 3 0 0 7 4 \ 0 3 _ C A D \ S H E E T S \ C O N S T R U C T I O N _ D R A W I N G S \ L A N D S C A P E \ 2 3 0 0 7 4 - L - C O V E R . D W G , 9/8 / 2 0 2 5 101/2 ATTENTION: IF THIS BAR DOES NOT MEASURE 1" ON 22x34 SHEET or 1/2" ON 11x17 SHEET, THEN DRAWING IS NOT TO SCALE SHEET:SHEET:20 2 5 33 2 N . B R O A D M O R E W A Y NA M P A , I D A H O 8 3 6 8 7 20 8 - 4 4 2 - 6 3 0 0 | W W W . A R D U R R A . C O M September 9, 2025 A. T A Y L O R A. T A Y L O R J. S N Y D E R J. S N Y D E R 230074 HU N T I N G T O N R I D G E E A S T S U B D I V I S I O N N O . 3 DA T E RE V I S I O N S NO . DE S C R I P T I O N LA N D S C A P E C O N S T R U C T I O N D R A W I N G S F O R LANDSCAPE CONSTRUCTION DRAWINGS FOR HUNTINGTON RIDGE EAST SUBDIVISION NO. 3 A PORTION OF THE SE 1/4 OF SECTION 14 TOWNSHIP 4 NORTH, RANGE 3 WEST, BOISE MERIDIAN CALDWELL, IDAHO 2024 CALL BEFORE YOU DIG! CALL DIGLINE INC. PRIOR TO COMMENCING UNDERGROUND WORK DIAL: 811 NOTE: THE LOCATION OF EXISTING UNDERGROUND UTILITIES ARE SHOWN APPROXIMATELY ONLY PRIOR TO CONSTRUCTION. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO INFORM ALL UTILITY COMPANIES OF THE CONSTRUCTION SCHEDULE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL DAMAGE WHICH MAY OCCUR BY FAILURE TO EXACTLY LOCATE AND PROTECT ALL UTILITIES. VICINITY MAP SCALE: 1" = 1000' 09/10/25 6'-7' City of Caldwell APPROVED FOR CONSTRUCTION These plans and/or specifications have been reviewed for compliance with the City of Caldwell specifications. This review does not relieve the owner, engineer, or contractor of the responsibility to design and/or construct these facilities in compliance with all current applicable federal, state, and local laws, rules, regulations, ordinances, orders of decisions, development agreements, or specifications. Inconsistencies not isolated by City staff shall not be construed as approved unless specifically addressed as a variance and granted by City Council as a variance. The City retains the right to enforce provisions of said document and policies even if inconsistencies are not noted by the City. Any revisions of these approved plans will require a resubmittal for a full review and approval. Name:Martin Gergen TOB TOB TOB TOB TOB TOB TOB TOB TO B TOB TO B TO B TO B TO B TO B TOB TOBTOBTOBTOBTOBTOBTOB TOB TOB TOE TOE TOETOETOE TOE TOB TOB TOB TOB TOB TOB TOB TOB TOBTOB TOBTOBTOBTOBTOBTOB TOBTOB TOB TOB TOB TOB TOB TOB TOB TOB TOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOB R/WR/WR/WR/W R/W R/ W R/W R/W R/W R/W R/W R/W R/W 6 20191817 24232221 25 16 5 4 12 7 8 10 15 11 22 9 3 LINE TABLE LINE L1 L2 L3 L4 L5 L6 L7 L8 BEARING S56°05'43"E S11°05'43"E S32°10'23"W S69°47'10"W S44°43'13"E S00°16'47"W S45°16'47"W N11°05'43"W DISTANCE 53.00' 21.21' 53.02' 9.84' 21.21' 53.00' 21.21' 21.21' CURVE TABLE CURVE C1 RADIUS 126.50' LENGTH 74.24' DELTA 33°37'30" BEARING S17°05'32"W CHORD 73.18' R/ W R/WR/W R/ W R/ W R/ W R/WR/W R/W R/W 131415 16 17 18 19 20 2121 EG IR I I ENHANCED WETLAND AREA OV E R A L L L A N D S C A P E P L A N L2.00 0 5025 150100 OVERALL LANDSCAPE PLAN 22 " x 3 4 " C A R D U R R A G R O U P , I N C . T H I S I N S T R U M E N T I S T H E P R O P E R T Y O F A R D U R R A . A N Y R E P R O D U C T I O N , R E U S E O R M O D I F I C A T I O N O F T H I S I N S T R U M E N T O R I T S C O N T E N T S W I T H O U T S P E C I F I C W R I T T E N P E R M I S S I O N O F A R D U R R A I S S T R I C T L Y P R O H I B I T E D DE S I G N E D DR A W N CH E C K E D AP P R O V E D BO R D E R S I Z E PROJECT: DATE: L: \ 2 3 0 0 7 4 \ 0 3 _ C A D \ S H E E T S \ C O N S T R U C T I O N _ D R A W I N G S \ L A N D S C A P E \ 2 3 0 0 7 4 - L - L S C P . D W G , 9/ 9 / 2 0 2 5 101/2 ATTENTION: IF THIS BAR DOES NOT MEASURE 1" ON 22x34 SHEET or 1/2" ON 11x17 SHEET, THEN DRAWING IS NOT TO SCALE SHEET:SHEET:20 2 5 33 2 N . B R O A D M O R E W A Y NA M P A , I D A H O 8 3 6 8 7 20 8 - 4 4 2 - 6 3 0 0 | W W W . A R D U R R A . C O M September 9, 2025 A. T A Y L O R A. T A Y L O R J. S N Y D E R J. S N Y D E R 230074 HU N T I N G T O N R I D G E E A S T S U B D I V I S I O N N O . 3 DA T E RE V I S I O N S NO . DE S C R I P T I O N LA N D S C A P E C O N S T R U C T I O N D R A W I N G S F O R AREA ONE SEE SHEET L2.01 AREA TWO SEE SHEET L2.02 CANDELARIA COURT CANDELARIA DRIVE MC C U T C H E N A V E PHA S E T W O MASON CREEKMASON CREEK LIR I A N O D R 09/10/25 City of Caldwell APPROVED FOR CONSTRUCTION These plans and/or specifications have been reviewed for compliance with the City of Caldwell specifications. This review does not relieve the owner, engineer, or contractor of the responsibility to design and/or construct these facilities in compliance with all current applicable federal, state, and local laws, rules, regulations, ordinances, orders of decisions, development agreements, or specifications. Inconsistencies not isolated by City staff shall not be construed as approved unless specifically addressed as a variance and granted by City Council as a variance. The City retains the right to enforce provisions of said document and policies even if inconsistencies are not noted by the City. Any revisions of these approved plans will require a resubmittal for a full review and approval. Name:Martin Gergen TOB TOB TOB TOB TOB TOBTOB TOB TOB TOBTOE TOE TOE TOETOE TOETOE TOBTOB PIPIPIPIPIPIPIPIPI W W W W W W W PI PI PI PI PI SEW SEW SEW SEW SEW SEW SEW SEW SEW W W W W W W W W W S S S W W W W IS IS IS IS IS IS IS IS IS IV IVIV YDH YDH AV W IS IS IS W IS IS ss P.O. IR IR IR I IS W W IS IS SD SD SDSD SD IRIRIRIR IR IR I I I I IR IR IR TOB I I B.O. R/WR/WR/W R/ W R/ W R/ W R/W R/W R/W R/W 19181716 12 15 11 R/ W R/ W R/ W R/WR/WR/W R/ W R/ W R/ W R/ W R/ W R/WR/WR/W R/W R/ W R/W 131415 16 17 18 19 20 121 15' LANDSCAPE BUFFER 15' LANDSCAPE BUFFER 15' LANDSCAPE BUFFER 15' LANDSCAPE BUFFER 2 3 2 3 4 4 2 2 5 6 8 9 10 11 11 CS1/16 4 7 4 13 ENHANCED WETLAND AREA 1 SYMBOL COMMON NAME BOTANICAL NAME CLASS II TREES CHANTICLEER CALLERY PEAR PYRUS CALLERYANA 'CHANTICLEER' PIN OAK QUERCUS PALUSTRIS GREENSPIRE LITTLELEAF LINDEN TILIA CORDATA 'GREENSPIRE' MUSASHINO JAPANESE ZELKOVA ZELKOVA SERRATA `MUSASHINO` EVERGREEN TREES AUSTRIAN PINE PINUS NIGRA DECIDUOUS SHRUBS BUD'S YELLOW DOGWOOD CORNUS ALBA 'BUD'S YELLOW' RED TWIG DOGWOOD CORNUS SERICEA UPRIGHT ALDER BUCKTHORN RHAMNUS FRANGULA 'COLUMNARIS' GRO-LOW FRAGRANT SUMAC RHUS AROMATICA 'GRO-LOW' DOUBLE KNOCK OUT ROSE ROSA X 'RADTKO' TM EVERGREEN SHRUBS BLUE ARROW JUNIPER JUNIPERUS SCOPULORUM 'BLUE ARROW' PERENNIALS STELLA DE ORO DAYLILY HEMEROCALLIS X 'STELLA DE ORO' SYMBOL COMMON NAME BOTANICAL NAME LANDSCAPE MATERIALS 1.5" CRUSHED BROWN & TAN ROCK MULCH CRUSHED GRAVEL ROCK MULCH CRUSHED STONE PATH ROCK MULCH HIGH TRAFFIC LAWN AREA - SOD HORSESHOE SAND RIVER COBBLE ROCK MULCH PLANT SCHEDULE PHASE 3 CODE DESCRIPTION FENCING PER OWNER LAWN AREA- SOD, TYP. PLANTER BED, TYP. 6' PRIVACY FENCING - VINYL TONGUE & GROOVE TYP. 12'X10' GAZEBO - BY OWNER FREE STANDING PICNIC TABLE - BY OWNER PET WASTE STATION BY DOGIPOT METAL/ALUMINUM EDGE LANDSCAPE EDGING BETWEEN MATERIALS FREE STANDING 6' BENCH - BY OWNER, TYP. HORSESHOE PIT 3' DIAMETER FIRE PIT - BY OWNER, TYP. LIFT STATION - SEE CIVIL PLANS EXISTING PATHWAY, RETAINING WALL, AND LANDSCAPE, PHASE 2 1 2 3 4 5 6 7 8 9 10 11 12 13 KEYNOTE SCHEDULE LA N D S C A P E P L A N - A R E A O N E L2.01 0 3015 9060 LANDSCAPE PLAN 22 " x 3 4 " C A R D U R R A G R O U P , I N C . T H I S I N S T R U M E N T I S T H E P R O P E R T Y O F A R D U R R A . A N Y R E P R O D U C T I O N , R E U S E O R M O D I F I C A T I O N O F T H I S I N S T R U M E N T O R I T S C O N T E N T S W I T H O U T S P E C I F I C W R I T T E N P E R M I S S I O N O F A R D U R R A I S S T R I C T L Y P R O H I B I T E D DE S I G N E D DR A W N CH E C K E D AP P R O V E D BO R D E R S I Z E PROJECT: DATE: L: \ 2 3 0 0 7 4 \ 0 3 _ C A D \ S H E E T S \ C O N S T R U C T I O N _ D R A W I N G S \ L A N D S C A P E \ 2 3 0 0 7 4 - L - L S C P . D W G , 9/ 9 / 2 0 2 5 101/2 ATTENTION: IF THIS BAR DOES NOT MEASURE 1" ON 22x34 SHEET or 1/2" ON 11x17 SHEET, THEN DRAWING IS NOT TO SCALE SHEET:SHEET:20 2 5 33 2 N . B R O A D M O R E W A Y NA M P A , I D A H O 8 3 6 8 7 20 8 - 4 4 2 - 6 3 0 0 | W W W . A R D U R R A . C O M September 9, 2025 A. T A Y L O R A. T A Y L O R J. S N Y D E R J. S N Y D E R 230074 HU N T I N G T O N R I D G E E A S T S U B D I V I S I O N N O . 3 DA T E RE V I S I O N S NO . DE S C R I P T I O N LA N D S C A P E C O N S T R U C T I O N D R A W I N G S F O R CANDELARIA COURT CANDELARIA DRIVE MC C U T C H E N A V E HUNTINGTON RIDGE EAST SUBDIVISION. NO. 1 HUNTINGTON RIDGE EAST SUBDIVISION. NO. 2 SE E S H E E T L 2 . 0 2 MASON CREEK 09/10/25 City of Caldwell APPROVED FOR CONSTRUCTION These plans and/or specifications have been reviewed for compliance with the City of Caldwell specifications. This review does not relieve the owner, engineer, or contractor of the responsibility to design and/or construct these facilities in compliance with all current applicable federal, state, and local laws, rules, regulations, ordinances, orders of decisions, development agreements, or specifications. Inconsistencies not isolated by City staff shall not be construed as approved unless specifically addressed as a variance and granted by City Council as a variance. The City retains the right to enforce provisions of said document and policies even if inconsistencies are not noted by the City. Any revisions of these approved plans will require a resubmittal for a full review and approval. Name:Martin Gergen TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TO B TO B TOB TOB TOB TOBTOB TOBTOBTOBTOBTOBTOBTOB TOE TOE TOE TOE TOETOETOETOETOETOE TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOBTOB TOB TOBTOBTOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOBTOBTOBTOB PI PI PI PI PI PIPIPIPI SEW SEW SEW SEW SEW SEW SEW SEW SEW W W W W W W W W S S W W W W W W IS IS IS IS IS IS IS IS W IS IS YDHIS IS IS W IS R/W R/WR/WR/WR/W R/W R/W R/W R/W R/W R/W R/W R/W 6 20 24232221 25 5 4 7 8 10 9 3 CURVE TABLE CURVE C1 RADIUS 126.50' LENGTH 74.24' DELTA 33°37'30" BEARING S17°05'32"W CHORD 73.18' 2 PI PI FM FM FM FM SEW SEW S EG B.O. W IV IV IV S IV P.O. WM IR IR IR I I IS YDH W W B.O. 12 4 4 4 13 ENHANCED WETLAND AREA 1 SYMBOL COMMON NAME BOTANICAL NAME CLASS II TREES CHANTICLEER CALLERY PEAR PYRUS CALLERYANA 'CHANTICLEER' PIN OAK QUERCUS PALUSTRIS GREENSPIRE LITTLELEAF LINDEN TILIA CORDATA 'GREENSPIRE' MUSASHINO JAPANESE ZELKOVA ZELKOVA SERRATA `MUSASHINO` EVERGREEN TREES AUSTRIAN PINE PINUS NIGRA DECIDUOUS SHRUBS BUD'S YELLOW DOGWOOD CORNUS ALBA 'BUD'S YELLOW' RED TWIG DOGWOOD CORNUS SERICEA UPRIGHT ALDER BUCKTHORN RHAMNUS FRANGULA 'COLUMNARIS' GRO-LOW FRAGRANT SUMAC RHUS AROMATICA 'GRO-LOW' DOUBLE KNOCK OUT ROSE ROSA X 'RADTKO' TM EVERGREEN SHRUBS BLUE ARROW JUNIPER JUNIPERUS SCOPULORUM 'BLUE ARROW' PERENNIALS STELLA DE ORO DAYLILY HEMEROCALLIS X 'STELLA DE ORO' SYMBOL COMMON NAME BOTANICAL NAME LANDSCAPE MATERIALS 1.5" CRUSHED BROWN & TAN ROCK MULCH CRUSHED GRAVEL ROCK MULCH CRUSHED STONE PATH ROCK MULCH HIGH TRAFFIC LAWN AREA - SOD HORSESHOE SAND RIVER COBBLE ROCK MULCH PLANT SCHEDULE PHASE 3 CODE DESCRIPTION FENCING PER OWNER LAWN AREA- SOD, TYP. PLANTER BED, TYP. 6' PRIVACY FENCING - VINYL TONGUE & GROOVE TYP. 12'X10' GAZEBO - BY OWNER FREE STANDING PICNIC TABLE - BY OWNER PET WASTE STATION BY DOGIPOT METAL/ALUMINUM EDGE LANDSCAPE EDGING BETWEEN MATERIALS FREE STANDING 6' BENCH - BY OWNER, TYP. HORSESHOE PIT 3' DIAMETER FIRE PIT - BY OWNER, TYP. LIFT STATION - SEE CIVIL PLANS EXISTING PATHWAY, RETAINING WALL, AND LANDSCAPE, PHASE 2 1 2 3 4 5 6 7 8 9 10 11 12 13 KEYNOTE SCHEDULE LA N D S C A P E P L A N - A R E A T W O L2.02 0 3015 9060 LANDSCAPE PLAN 22 " x 3 4 " C A R D U R R A G R O U P , I N C . T H I S I N S T R U M E N T I S T H E P R O P E R T Y O F A R D U R R A . A N Y R E P R O D U C T I O N , R E U S E O R M O D I F I C A T I O N O F T H I S I N S T R U M E N T O R I T S C O N T E N T S W I T H O U T S P E C I F I C W R I T T E N P E R M I S S I O N O F A R D U R R A I S S T R I C T L Y P R O H I B I T E D DE S I G N E D DR A W N CH E C K E D AP P R O V E D BO R D E R S I Z E PROJECT: DATE: L: \ 2 3 0 0 7 4 \ 0 3 _ C A D \ S H E E T S \ C O N S T R U C T I O N _ D R A W I N G S \ L A N D S C A P E \ 2 3 0 0 7 4 - L - L S C P . D W G , 9/ 9 / 2 0 2 5 101/2 ATTENTION: IF THIS BAR DOES NOT MEASURE 1" ON 22x34 SHEET or 1/2" ON 11x17 SHEET, THEN DRAWING IS NOT TO SCALE SHEET:SHEET:20 2 5 33 2 N . B R O A D M O R E W A Y NA M P A , I D A H O 8 3 6 8 7 20 8 - 4 4 2 - 6 3 0 0 | W W W . A R D U R R A . C O M September 9, 2025 A. T A Y L O R A. T A Y L O R J. S N Y D E R J. S N Y D E R 230074 HU N T I N G T O N R I D G E E A S T S U B D I V I S I O N N O . 3 DA T E RE V I S I O N S NO . DE S C R I P T I O N LA N D S C A P E C O N S T R U C T I O N D R A W I N G S F O R SE E S H E E T L 2 . 0 1 PHA S E T W O CANDELARIA DRIVE LIR I A N O D R 4 HUNTINGTON RIDGE EAST SUBDIVISION. NO. 2 MASON CREEK 09/10/25 City of Caldwell APPROVED FOR CONSTRUCTION These plans and/or specifications have been reviewed for compliance with the City of Caldwell specifications. This review does not relieve the owner, engineer, or contractor of the responsibility to design and/or construct these facilities in compliance with all current applicable federal, state, and local laws, rules, regulations, ordinances, orders of decisions, development agreements, or specifications. Inconsistencies not isolated by City staff shall not be construed as approved unless specifically addressed as a variance and granted by City Council as a variance. The City retains the right to enforce provisions of said document and policies even if inconsistencies are not noted by the City. Any revisions of these approved plans will require a resubmittal for a full review and approval. Name:Martin Gergen LA N D S C A P E D E T A I L S L3.00 22 " x 3 4 " C A R D U R R A G R O U P , I N C . T H I S I N S T R U M E N T I S T H E P R O P E R T Y O F A R D U R R A . A N Y R E P R O D U C T I O N , R E U S E O R M O D I F I C A T I O N O F T H I S I N S T R U M E N T O R I T S C O N T E N T S W I T H O U T S P E C I F I C W R I T T E N P E R M I S S I O N O F A R D U R R A I S S T R I C T L Y P R O H I B I T E D DE S I G N E D DR A W N CH E C K E D AP P R O V E D BO R D E R S I Z E PROJECT: DATE: L: \ 2 3 0 0 7 4 \ 0 3 _ C A D \ S H E E T S \ C O N S T R U C T I O N _ D R A W I N G S \ L A N D S C A P E \ 2 3 0 0 7 4 - L - D E T A I L S . D W G , 9/ 8 / 2 0 2 5 101/2 ATTENTION: IF THIS BAR DOES NOT MEASURE 1" ON 22x34 SHEET or 1/2" ON 11x17 SHEET, THEN DRAWING IS NOT TO SCALE SHEET:SHEET:20 2 5 33 2 N . B R O A D M O R E W A Y NA M P A , I D A H O 8 3 6 8 7 20 8 - 4 4 2 - 6 3 0 0 | W W W . A R D U R R A . C O M September 9, 2025 A. T A Y L O R A. T A Y L O R J. S N Y D E R J. S N Y D E R 230074 HU N T I N G T O N R I D G E E A S T S U B D I V I S I O N N O . 3 DA T E RE V I S I O N S NO . DE S C R I P T I O N LA N D S C A P E C O N S T R U C T I O N D R A W I N G S F O R DECIDUOUS TREE PLANTING NTS 2x ROOTBALL DIAMETER NOTES: 1.REMOVE ALL BURLAP, TWINE, AND WIRE BASKET FROM THE TOP 2/3 OF ROOTBALL. REMOVE ALL NAILS, TIES, AND PLASTIC FROM ROOTBALL. SYNTHETIC SHALL BE COMPLETELY REMOVED. 2.TREE STAKING SHALL BE AT THE OPINION OF THE CONTRACTOR. HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL TREES ARE PLANTED AND STAND PLUMB THROUGHOUT THE TERM OF THE WARRANTY. ALL STAKING SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. 3.CONTRACTOR TO VERIFY EXISTING UTILITY LOCATIONS PRIOR TO STAKE INSTALLATION. 4.CONTRACTOR SHALL DETERMINE IF LOCAL SITE CONDITIONS REQUIRE 3-STAKE OPTION. 5.WATER TREE THOROUGHLY WITHIN THE FIRST 24 HOURS AFTER PLANTING. 1 PREVAILING WIND 5' M I N . C L E A R TO B A S E O F C R O W N 6" 2 3 4 5' MIN. DIAMETER TREE RING 5 6 7 8 9 SOIL LINE 10 REMOVE ALL TAGS, FLAGGING, AND OTHER NON BIODEGRADABLE MATERIAL FROM TREE IMMEDIATELY AFTER INSTALLATION. REMOVE DEAD / DAMAGED BRANCHES BY PRUNING TO INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS. IMPROPERLY PRUNED TREES, AS DETERMIINED BY LANDSCAPE ARCHITECT, SHALL BE REMOVED AND REPLACED IMMEDIATLEY AT NO ADDITIONAL COST TO OWNER. 1 REMOVE ANY TREE WRAP / TRUNK PROTECTION IMMEDIATELY AFTER INSTALLATION.2 2"x2"x8' CEDAR STAKE. DO NOT PENETRATE ROOTBALL. STAKES SHALL BE SET PARALLEL TO PREVAILING WIND DIRECTION. 3 NON ABRASIVE, "CHAINLOCK" OR EQUAL TREE TIE MATERIAL. WRAP TIE AROUND THE TREE TRUNK AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT METHOD. SECURE TIES TO THE STAKES WITH GALVANIZED NAILS OR STAPLE TO PREVENT LOOSENING. TIE SHOULD INCLUDE JUST ENOUGH SLACK FOR TRUNK GROWTH AND SLIGHT MOVEMENT. 4 ROOT FLARE / COLLAR (SWELLING AT SOIL LINE WHERE STEM TISSUE TRANSITIONS INTO ROOT TISSUE) TO BE AT FINISH GRADE. WHEN PRESENT, BUD POINT(MAJOR CROOK IN THE TRUNK JUST ABOVE THE SOIL LINE) TO BE APPROX. 1.5" ABOVE FINISH GRADE. 5 MULCH LAYER, KEEP 2" AWAY FROM TRUNK.6 SCARIFY EDGE OF PLANTING PIT.7 BACKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS. BACKFILL IN 6" LIFTS. SETTLE WITH WATER PRIOR TO EACH LIFT. TAMP LIGHTLY. DO NOT OVER COMPACT. 8 SET ROOTBALL ON UNDISTURBED SUBSOIL.9 COMMERICAL SLOW RELEASE FERTILIZER TABLET PER MANUFACTURER DOSEAGE10 1 SHRUB PLANTING NTS FINISH GRADE REMOVE ALL TAGS, FLAGGING, AND OTHER NON BIODEGRADABLE MATERIAL FROM SHRUB IMMEDIATELY AFTER INSTALLATION 1 PRUNING IS ONLY RECOMMENDED TO REMOVE BROKEN, DEAD, OR DYING BRANCHES2 3" DEEP MULCH. LEAVE 2" BARE GROUND BETWEEN MULCH AND MAIN STEM. SET TOP OF ROOT BALL FLUSH WITH FINISH GRADE 3 PRIOR TO MULCHING, ADD 100% TOPSOIL AROUND ROOT BALL IN 6" LIFTS TO BRACE SHRUB. DO NOT OVER COMPACT. WHEN THE PLANTING HOLE IS BACKFILLED, WATER GENTLY TO SETTLE SOIL 4 ROOT BALL SHALL REST ON UNDISTURBED OR RECOMPACTED SOIL5 IF BALLED AND BURLAPPED, REMOVE ALL WIRE BASKET, ROPE, OR TWINE FROM TOP 1/3 BURLAP FROM THE ROOT BALL. BE CAREFUL TO KEEP ROOT BALL INTACT 6 IF SHRUB IS CONTAINER GROWN, HAND LOOSEN ROOTS AWAY FROM GROWING MEDIA TO HELP PREVENT GIRDLING ROOTS 7 EXISTING SOIL82x WIDTH OF ROOT BALL 1 2 3 6 4 57 8 2 1 2 3 4 5 7 6 PERENNIAL PLANTING NTS REMOVE ALL TAGS/FLAGGING/AND OTHER NON BIODEGRADABLE MATERIAL FROM SHRUB IMMEDIATLEY AFTER INSTALLATION 1 SET TOP OF ROOT BALL FLUSH WITH FINISH GRADE2 3" DEEP MIN. MULCH. DO NOT PLACE MULCH IN CONTACT WITH LEAVES OR STEMS3 BACKFILL WITH 100% TOPSOIL IN 6" LIFTS. WHEN PLANTING HOLE IS BACKFILLED, WATER GENTLY TO SETTLE SOIL 4 REMOVE CONTAINER AND LOOSEN ROOTS OF POTBOUND PLANTS BY GENTLY SCORING OR PULLING 5 ROOT BALL SHALL REST ON EXISTING OR RECOMPACTED SOIL6 EXISTING SOIL7 3 6' VINYL TONGUE AND GROOVE FENCE NTS 6' FRONT VIEW MI N D E P T H T O F R O S T L I N E NOTES: 1.FENCE COLOR TO BE DETERMINED. FINAL COLOR SHALL BE FADE/ULTRAVIOLET LIGHT RESISTANT. 2.FENCING PLACED ON SLOPES SHALL STAIR STEP PER PANEL. 3.IN ALL CASES, SPACE BETWEEN THE FENCE AND FINISH GRADE SHALL NOT EXCEED 4 INCHES. 8'-0" CENTER LINE POST TO POST 4 OPTIONAL POST CAP1 TONGUE AND GROOVE VERTICAL FENCE PANEL 2 ALL FOOTINGS SHALL DRAIN AWAY FROM POST 3 AGGREGATE BASE. 4" DEEP. IN NO CASE SHALL POST SIT DIRECTLY ATOP SOIL OR CONCRETE 4 1 2 3 4 CONTROLLER - PEDESTAL MOUNT NTS 1 2 3 4 5 NOTES: 1.CONTROLLER SHALL BE HARD WIRED TO GROUNDED 110 VAC POWER SOURCE. CONTROLLER MODEL AND STAINLESS STEEL PEDESTAL PER SPECIFICATIONS 1 ELECTRICAL SUPPLY CONDUIT. CONNECT TO POWER SOURCE, J-BOX INSIDE CONTROLLER 2 GROUND WIRE CONDUIT, PER ASIC GUIDELINES3 IRRIGATION CONTROL WIRE IN CONDUIT. SIZE AND TYPE PER LOCAL CODES 4 PEDESTAL BASE PER PLAN. INSURE POSITIVE DRAINAGE AWAY FROM PEDESTAL 5 5 MIN. 1" (25 MM) CLR 1 2 3 5 6 4 7 11 12109 REMOTE CONTROL VALVE NTS 8 REMOTE CONTROL VALVE1 IRRIGATION VALVE BOX2 WATERPROOF CONNECTORS (2)3 18"-24" COILED WIRE TO CONTROLLER4 FINISH GRADE AT ADJACENT SURFACE (TURF/ MULCH)5 SCH. 80 CLOSE NIPPLE, MATCH SIZE TO VALVE6 PVC SLIP X FPT ADAPTOR7 BRICK SUPPORTS (4)8 FILTER FABRIC - WRAP TWICE AROUND BRICK SUPPORTS9 3/4" WASHED GRAVEL(4" MIN. DEPTH)10 IRRIGATION LATERAL11 MAINLINE AND FITTINGS126 DRIP CONTROL ZONE KIT NTS MIN. 1" CLR 1 2 6 7 11 34 55 6 7 10 9 12 8 REMOTE CONTROL VALVE1 IRRIGATION VALVE BOX2 WATERPROOF CONNECTORS (2)3 18"-24" COILED WIRE TO CONTROLLER4 FINISH GRADE (TURF/MULCH)5 SCH. 80 CLOSE NIPPLE, MATCH SIZE TO VALVE6 PVC SLIP X FPT ADAPTOR7 BRICK SUPPORTS (4)8 FILTER FABRIC - WRAP TWICE AROUND BRICK SUPPORTS9 3/4" WASHED CRUSHED ROCK, 4" MIN. DEPTH10 IRRIGATION LATERAL11 MAINLINE LATERAL AND FITTINGS12 8 7 LAY ARM(LENGTH A S R E Q U I R E D ) POP-UP ROTOR NTS 1 2 SWING JOINT ASSEMBLY 1.HAND TIGHTEN O-RING JOINTS, BACK-OFF ONE FULL TURN TO ALLOW FOR SWING ACTION 2.INSTALL SWING JOINT LAY ARM AT 30-40 DEG. ANGLE TO THE LATERAL 3 4 5 POP-UP ROTOR1 FINISH GRADE2 3 LATERAL TEE OR ELL CONNECTION4 LATERAL PIPING. 18" MIN. COVER5 10 POP-UP SPRAY NTS 1 2 3 4 5 POP-UP SPRAY BODY. NOZZLE AND POP UP HEIGHT TO BE SIZED BY CONTRACTOR IF NOT SPECIFIED 1 FINISH GRADE2 LATERAL TEE OR ELL3 LATERAL PIPE4 FIELD BUILT FLEXIBLE SWING ARM5 11 MULCH MOWSTRIP ON FENCELINE NTS 1 PRIVATE LOT LANDSCAPE 18" MULCH COMMON LOT LANDSCAPE FENCELINE1 14 SHOVEL CUT V - EDGE AT PLANTER BED NTS 8" 4"75° ' 30 ° ' 1 2 34 5 TURF1 MULCH AT PLANTER BEDS2 TOPSOIL AND SOIL AMENDMENTS AS SPECIFIED 3 CUT EDGE4 FINISH GRADE5 13 NTS 1 23 4 5 6 7 8 9 12 " M I N . BE L O W GR A D E 24 " M I N . B E L O W GR A D E VALVE BOX - PER MANUFACTURER1 FINISH GRADE2 SET BOX FLUSH WITH TURF3 WATERPROOF WIRE CONNECTORS ON 30" LOOPED WIRES 4 PVC CONDUIT FOR CONTROLLER WIRES5 SXT SCHEDULE 80 NIPPLES VALVE INLET SIZE6 PVC MAIN LINE7 1/2" WIRE CLOTH GOPHER SCREEN, WRAP UP SIDES8 6X2X16 CONC. BLOCK CAPS, ONE EACH SIDE (2 TOTAL) 9 MASTER VALVE CONTROL 5.PRIOR TO INSTALLATION OF AUTOMATIC FLUSH VALVE, CONTRACTOR TO MANUALLY FLUSH SYSTEM AND VERIFY NO DEBRIS IS PRESENT. 8 FLOW SENSOR NTS 1 3 5 4 7 9 6 FLOW ⇨ 8 2 RECTANGULAR VALVE BOX WITH LOCKING LID1 FINISH GRADE2 FLOW SENSOR3 RECEPTACLE TEE, SIZE PER MANUFACTURER'S SPECIFICATIONS 4 MAINLINE FROM MASTER VALVE5 BRICK SUPPORTS - 4 PER BOX6 FILTER FABRIC - WRAP TWICE AROUND BRICK SUPPORTS7 IRRIGATION VALVE WIRES WITH A 12" MIN. EXPANSION COIL8 3/4" WASHED CRUSHED ROCK, 4" MIN. DEPTH9 NOTES: 1. FLOW SENSOR MAKE AND MODEL SHALL BE PER CONTROLLER MANUFACTURER SPECIFICATIONS AND / OR RECOMMENDATIONS. 2. FLOW SENSOR WIRE SHALL BE PER THE CONTROLLER MANUFACTURER'S RECOMMENDATIONS. 3. INSTALL FLOW SENSOR PER MANUFACTURER RECOMMENDATIONS. 4. ALL WIRES RUNS SHALL BE CONTINUOUS WITHOUT ANY SPLICES. WIRE CONNECTIONS SHALL BE MADE WITH DBR/Y-6 CONNECTORS OR EQUAL. 9 DRIPLINE LAYOUT NTS DOGBONE SHAPED CURVED POLYGON HOURGLASS SHAPED "C" SHAPED ODD SHAPED LANDSCAPE DRIPLINE TUBING. REMOTE CONTROL VALVE AND FILTER - SEE DETAIL FLUSH VALVE ASSEMBLY - PLACE AT FARTHEST AIR RELIEF VALVE - INSTALL AT HIGHEST POINT OF ZONESUPPLY LATERAL OR HEADER. RIGID PVC. SIZE FOR TOTAL ZONE FLOW. HEADER SHALL BE PLACED AT EACH END OF THE ZONE. NOTES: 1. CENTER FEED LAYOUT SHOULD BE USED WHEREVER POSSIBLE TO ALLOW FOR MORE EVEN FLOWS AND THE INCREASE IN SIZE OF THE ZONE. 2. SEE MANUFACTURER DRIPLINE DESIGN INSTALLATION AND MAINTENANCE GUIDE FOR ADDITIONAL INFORMATION. 3. 2 INCH MIN. - 4 INCH MAX. OFFSET FROM ALL PIPING TO ADJACENT HARDSCAPE. POLYGON SHAPED POINT FROM SUPPLY LATERAL 12 09/10/25 City of Caldwell APPROVED FOR CONSTRUCTION These plans and/or specifications have been reviewed for compliance with the City of Caldwell specifications. This review does not relieve the owner, engineer, or contractor of the responsibility to design and/or construct these facilities in compliance with all current applicable federal, state, and local laws, rules, regulations, ordinances, orders of decisions, development agreements, or specifications. Inconsistencies not isolated by City staff shall not be construed as approved unless specifically addressed as a variance and granted by City Council as a variance. The City retains the right to enforce provisions of said document and policies even if inconsistencies are not noted by the City. Any revisions of these approved plans will require a resubmittal for a full review and approval. Name:Martin Gergen LA N D S C A P E D E T A I L S L3.01 22 " x 3 4 " C A R D U R R A G R O U P , I N C . T H I S I N S T R U M E N T I S T H E P R O P E R T Y O F A R D U R R A . A N Y R E P R O D U C T I O N , R E U S E O R M O D I F I C A T I O N O F T H I S I N S T R U M E N T O R I T S C O N T E N T S W I T H O U T S P E C I F I C W R I T T E N P E R M I S S I O N O F A R D U R R A I S S T R I C T L Y P R O H I B I T E D DE S I G N E D DR A W N CH E C K E D AP P R O V E D BO R D E R S I Z E PROJECT: DATE: L: \ 2 3 0 0 7 4 \ 0 3 _ C A D \ S H E E T S \ C O N S T R U C T I O N _ D R A W I N G S \ L A N D S C A P E \ 2 3 0 0 7 4 - L - D E T A I L S . D W G , 9/ 8 / 2 0 2 5 101/2 ATTENTION: IF THIS BAR DOES NOT MEASURE 1" ON 22x34 SHEET or 1/2" ON 11x17 SHEET, THEN DRAWING IS NOT TO SCALE SHEET:SHEET:20 2 5 33 2 N . B R O A D M O R E W A Y NA M P A , I D A H O 8 3 6 8 7 20 8 - 4 4 2 - 6 3 0 0 | W W W . A R D U R R A . C O M September 9, 2025 A. T A Y L O R A. T A Y L O R J. S N Y D E R J. S N Y D E R 230074 HU N T I N G T O N R I D G E E A S T S U B D I V I S I O N N O . 3 DA T E RE V I S I O N S NO . DE S C R I P T I O N LA N D S C A P E C O N S T R U C T I O N D R A W I N G S F O R PET WASTE STATION BY DOGIPOT NTS NOTES: 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2. PRODUCT SUGGESTION ONLY. EQUAL PRODUCT MAY BE APPROVED. ELEVATION 1 2 3 4 ALUMINUM DOGIPOT PET SIGN, WITH MOUNTING HARDWARE 1 ALUMINUM DOGIPOT JUNIOR BAG DISPENSER WITH MOUNTING HARDWARE 2 TRASH RECEPTACLE WITH ATTACHED HINGED LID AND MOUNTING HARDWARE 3 TELESCOPIC GALVANIZED STEEL MOUNTNG POST4 1 HORSESHOE COURT 1/2" 1'-0" 2X8 BACK BOARDS. SECTION VIEW OVERALL PLAN VIEW 6X6 POSTS. 2X12 CAP. 12" THICK COARSE, CLEAN SAND BED. DETAIL PLAN VIEW 4X12 SIDE HEADERS. THREE 6X6 POSTS. THREE 4X8 BACK STOPS. 2X12 CAP. 4X4X24" STAKES, BEVEL TOP, SET BELOW GRADE. 12" THICK COARSE, CLEAN, SAND BED. 1" DIA. X 36" SMOOTH IRON ROD. 1" DIAMETER X 36" SMOOTH IRON ROD. WELD 2X2X5" ANGLE IRON TO IRON ROD. 12" DIAMETER X 18" CONCRETE FOOTING. 4X12 HEADER BOARDS WITH 4X4X24" STAKES. IMBED POST 3" INTO 6" THICK GRAVEL BED. LEAN STAKE 12 DEG. TOWARDS OPPOSITE STAKE. CONCRETE FOOTING.4" LONG RUBBER HOSE.18 " 2'- 6 " 3" 12" DIA 8" 1' - 6 " 1'-0"3" 40 ' - 0 " B E T W E E N B A S E S O F S T A K E S 50 ' - 0 " 6' - 0 " S Q U A R E 5' - 0 " 10'-0" 3 TO.PRO-L.DRIVE-230074-18 12'X10' GAZEBO NTS2 CONCEPTUAL IMAGE ONLY. ACTUAL MODEL MAY VARY. 09/10/25 City of Caldwell APPROVED FOR CONSTRUCTION These plans and/or specifications have been reviewed for compliance with the City of Caldwell specifications. This review does not relieve the owner, engineer, or contractor of the responsibility to design and/or construct these facilities in compliance with all current applicable federal, state, and local laws, rules, regulations, ordinances, orders of decisions, development agreements, or specifications. Inconsistencies not isolated by City staff shall not be construed as approved unless specifically addressed as a variance and granted by City Council as a variance. The City retains the right to enforce provisions of said document and policies even if inconsistencies are not noted by the City. Any revisions of these approved plans will require a resubmittal for a full review and approval. Name:Martin Gergen SECTION 329200 LANDSCAPE WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS AND REFERENCES: A.Related Documents: 1.Irrigation System as specified in Section 32 84 00. B.References: The following specifications and standards of the organizations and documents listed in this paragraph form a part of this specification. 1.ANSI Z60.1 - American Standard for Nursery Stock, most current edition. 2. ANSI A 300 - Standard Practices for Tree, Shrub, and other Woody Plant Maintenance, most current edition and parts. 3.Pruning practices shall conform to recommendations “Structural Pruning: A Guide For The Green Industry” most current edition; published by Urban Tree Foundation, Visalia, California 1.2 SUBMITTALS A.Samples for Verification shall be submitted to Owner's Representative for each of the following: 1.Certificates of inspection as required by governmental authorities. 2.Manufacturer or vendor certified analysis for soil amendments and fertilizer. 3.Label data substantiating that plants, trees, shrubs, and planting materials comply with specified requirements. 4.Mulch: (1) one pound minimum for each color and type required, in plastic bags labeled with color, size and supplier information. Submit for review a minimum of (1) one week prior to full quantity delivery and installation. 1.3 QUALITY ASSURANCE A.Contractor Qualifications: The installing Contractor firm shall have at least three (3) years of successful experience of similar scope of work for the successful establishment of exterior plants. 1.Field Supervision: When planting is in progress, Contractor shall maintain an experienced full-time foreman on the Project Site. B.Source Quality Control: 1.General: Ship landscape materials with certificate of inspection required by governing authorities and comply with regulations applicable to landscape materials. 2.Substitutions: Substitutions are not allowed without prior written authorization from Owner's Representative. If specified landscape materials are not obtainable, Contractor shall submit proof of non-availability to Owner's Representative along with proposal of equivalent material. 3.Trees, Shrubs, Groundcovers: Provide trees, shrubs and groundcover of quantity, size, genus, species, and variety shown that comply with requirements of ANSI Z60.1 “American Standard for Nursery Stock.” All plant material shall be grown in recognized nursery containers in accordance with good horticultural practice and free of disease, insects, eggs, larvae, and physical defects such as knots, sun scale, injuries, abrasions. 4.Labels: At least one tree and one shrub of each variety shall be labeled with attached waterproof tab with legible designation of botanical and common name. 5.Uniformity: Where formal arrangements of consecutive order of trees or shrubs are shown, select stock for uniform height and spread. 6.Review: The Owner's Representative may inspect trees and shrubs either at place of growth or at the project site for compliance with size, health, quality, character, etc. Owner's Representative retains the right to further inspect trees and shrubs for size and condition of root balls, insect infestation, and other defects, and to reject any unsatisfactory material at any time during the process of selection, delivery, installation period. a)The Contractor shall bear all costs related to plant rejections due to failure of the review process. b)All plants rejected shall be immediately removed from the site and acceptable plants should be provided in a timely fashion that does not interfere with Project scheduling. 1.4 DELIVERY, STORAGE, AND HANDLING. A.Trees and Shrubs: Do not prune trees and shrubs before delivery, except as approved by Owner's Representative. Protect bark, branches, and root systems from sun scald, drying, sweating, whipping, and other handling and tying damage. Do not bend or bind-tie trees or shrubs in such a manner as to destroy their natural shape. Provide protective covering of plant material during delivery. Take necessary steps to avoid dropping plant material during delivery. Handle all container grown and/or balled and burlapped stock by the root ball. B.Deliver all plant material after preparations for planting have been completed and install immediately. If planting is delayed more than 6 hours after delivery, set plants in a location protected from sun, wind, and mechanical damage. Keep all plant material well-watered during the storage period. 1.Do not remove container-grown stock from containers before time of planting. 2.Cover balled and burlapped stock with soil, peat moss or other acceptable materials to keep from drying out. 3.Water root systems of all plant material stored on-site with a fine mist spray. Water as often as necessary to maintain root system in a moist condition. C.Sod: Time delivery so that sod will be placed within 24 hours after stripping. Protect sod against drying and breaking. D.Seed and Other Packaged Materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name of manufacturer. Seed specifically shall label with variety of seed, percentage of germination, and weed content. E.Bulk Materials: 1.Do not dump or store bulk materials near structures, utilities, walkways and pavements or on existing turf areas or plants. 2.Provide erosion control measures to prevent erosion or displacement of bulk materials, discharge of soil bearing water runoff, and airborne dust reaching adjacent properties, water conveyance systems, or walkways. F.Contractor is responsible for keeping project site clean and disposing of delivery / packaging materials on an as needed basis to keep an orderly appearance. 1.5 PROJECT CONDITIONS A.Utilities: Contractor shall verify actual grade elevations, service and utility locations, irrigation system components, and location of any other construction elements adjacent to location of new plantings prior to proceeding with planting work. 1.Contractor is responsible for knowing and avoiding the location of all utilities. For dig-a-line services call toll free 1-800-422-4133 or the State's local number, at least two working days before installation begins. 2.Contractor shall work in such a manner to avoid possible damage to existing utilities. Hand excavate as required. Maintain grade stakes until removal is mutually agreed upon by parties concerned. 3.Do not interrupt services or utilities to facilities occupied by Owner unless with prior written approval from Owner's Representative. B.Adjacent Landscape: Protect planted areas adjacent to construction work. Replace or recondition to prior conditions prior to project completion. C.Grading: Any berming and grading shown on plans shall have gradual transitions to existing or engineer proposed grades. Fine grading shall not change flow direction of surface drainage or swales as shown on engineering plans. 1.6 SEQUENCING A.Planting Time: Proceed with landscape installation as portions of the site become available, working within seasonal limitations for the type of landscape work required. 1.Install planting material during normally accepted planting season between March 15 and November 15. 2.Correlate planting with specified maintenance period to provide maintenance from date of substantial completion. B.Coordination with Lawn: Trees and shrubs shall be installed after final grades are established and prior to planting of lawn, unless otherwise accepted in writing by the Owner's Representative. If planting of trees and shrubs must occur after lawn installation, the Contractor shall take necessary precautions to protect the lawn and promptly repair areas damaged due to planting activities. 1.7 PROJECT WARRANTY A.Warranty: Warrant the following plant material for the warranty period indicated, against defects including death and unsatisfactory growth, except for defects resulting from inadequate maintenance, neglect or abuse by Owner, or incidents that are beyond the Contractor's control such as, abuse or damage by others, or unusual phenomena. 1.Warranty Period for Trees and Shrubs: 12 months from date of Substantial Completion. 2.Warranty Period for Ornamental Grasses / Perennials: 12 months from date of Substantial Completion. 3.Warrant Period for Lawns: through specified maintenance period. 4.At minimum, warranty replacement shall include removal of dead or unhealthy plant material during warranty period. Replace trees and shrubs which are in unhealthy condition at or before the end of warranty period, unless directed by Owner's Representative that it is advisable to extend warranty period for a full growing season. 5.Unhealthy plant material is defined as: any plant material that is more than 75% dead at the end of the Warranty Period. PART 2 - PRODUCTS 2.1 TOPSOIL A.Topsoil shall be defined as the surface layer of soil that is fertile, friable, natural loam, that is reasonably free of subsoil, clay lumps, brush, weeds, litter, stumps, stones larger than two (2) inches in any direction, and other materials toxic to plant growth. 1.Contractor shall obtain and send a minimum of three (3) samples of topsoil from varied locations on the Project Site for testing. See testing requirements below. The Contractor shall notify the Owner's Representative sufficiently in advance that the necessary measurements and tests cannot be made without altering the project schedule. 2.Contractor shall be responsible for all coordination and payment of all testing, purchasing and installation of laboratory recommended soil additives. Compost shall be added regardless of test results. 3.If regenerative noxious weeds are found to be present in the soil, remove all resultant growth including roots throughout one-year period after acceptance of work at no cost to Owner. B.If quantity or quality of stockpiled topsoil is insufficient, suitable topsoil will need to be secured from an off-site supplier. The topsoil shall be as described in Item A. The Contractor shall locate and obtain the supply, subject to the approval of the Owner's Representative. The topsoil shall be hauled to the site of the work and placed for spreading or spread as required. Any topsoil hauled to the site of the work and stockpiled shall be rehandled and placed without additional compensation. 1.Imported topsoil from local sources or from regional areas shall have similar soil characteristics to that found at Project Site. Obtain topsoil only from naturally, well drained sites where topsoil occurs in a depth of not less than four (4) inches. Do not obtain from marshes or bogs. 2.Contractor shall submit soil report on imported topsoil that is proposed for use. Report shall meet composition standards below. Compost shall be added regardless of test results. C.Composition: Topsoil shall contain 1% to 20% organic matter as determined by the Organic Carbon, 6A Chemical Analysis Method as described by USDA Soil Survey Investigation Report No.1. Maximum particle size 3/4 inch, with maximum 3% retained on a 1/4” screen. 1.Other components shall conform to the following: a)pH 6.5-7.5; Soluble Salt 600 ppm maximum; Silt 25%-50%; Clay 10%-30%; Sand 2%0-50% D.No topsoil shall be delivered in a frozen or muddy condition. 2.2 SOIL AMENDMENTS A.pH: when pH does not meet these specifications, commercial grade aluminum sulfate shall be used to adjust pH. B.Compost: Blended and ground leaf, wood and other plant-based material, composted for a minimum of (9) nine months. Source shall be an industry standard, commercially prepared and sold product. C.Commercial Fertilizer: Furnish commercially manufactured, standard brand slow-release fertilizer for plant material. Product shall be supplied in new, waterproof containers and clearly labeled as to weight, manufacturer and chemical composition. Store in a clean, dry area and protect from deterioration. 1.Tree and Shrub: Agriform 20-10-5 slow release - 5 gram, or equal product. 2.Lawn (Sod) Preparation: 16-16-16 standard brand fertilizer applied to the bed prior to sodding at the manufacturer's recommended rate. 3.Lawn (Seed) Preparation: If drill seeding, apply fertilizers according to manufacturer's guidelines and mix into bed prior to seeding. 4.Lawn Fertilization: Espoma Organics 9-0-0 all season, or equal product applied to the lawn three to four weeks after sod installation at the manufacturer's recommended rate. 5.Herbicide: Oxadiazon 2G, or equal product pre-emergent for topical application in planter beds. Apply to planter beds according to manufacturer's recommended rates. Do not apply in areas to receive seed and / or bulbs. 2.3 PLANT MATERIAL A.General: Furnish nursery-grown plant material complying with ANSI Z60.1, with healthy root systems developed by transplanting or root pruning. Provide well-shaped, fully branched, healthy, vigorous stock free of disease, insects, eggs, larvae, and defects such as knots, sun scald, injuries, abrasions, and disfigurement. 1.All plant material shall be acclimated to local outdoor growing conditions for a period of no less than one week prior to delivery to Project Site. 2.If formal arrangements or consecutive order of plant material is shown on appropriate plans, plant material shall be selected to have uniform height and spread, to assure symmetry in planting. 3.Ensure a minimum of 50% of each variety of plant material is labeled securely with an attached, waterproof tag bearing legible designation of botanical and common name. Remove tags after installation. B.Deciduous Trees: Provide trees of caliper size shown on schedule with branching and root ball size consistent with ANSI Z60.1 for type and species specified. Trees shall be single stem, unless otherwise specified. C.Deciduous Shrubs: Provide shrubs of container size shown on schedule with no less than the minimum number of canes required by ANSI Z60.1 for type and height of shrub. D.Coniferous and Broadleaf Evergreens: Provide evergreens of height shown on schedule. Provide normal quality species with well-balanced form that complies with the requirements of ANSI Z60.1 for evergreens. 2.4 LAWN MATERIAL A.Sod: Provide strongly rooted sod, not less than (1) one growing season old and is free of weeds and undesirable grass species. Provide only viable (not dormant) sod capable of growth and development immediately upon planting. 5.Sod shall be of uniform pad or rolls. Broken or uneven products will not be acceptable. 6.Sod shall be composed of locally harvested Rhizomatous Tall Fescue (RTF) or other fescue blend that displays low water use and heat tolerance. B.Grass Seed: Fresh, clean, dry, new-crop seed complying with AOSA's 'Journal of Seed Technology' Rule for Testing Seeds' for purity and germination tolerances. 1.Seed Species: Seed of grass species as follows, with not less than 95 percent germination, not less than 85 percent pure seed, and not more than 0.5 percent weed seed. All species shall be ranked in the top 15% of NTEP Trials in the Northwest for turf seed rankings with proven positive results for wear, color, drought tolerance and disease tolerance. 2.Hydro-Mulch (Hydraulically Applied Erosion Control Products (HECPs)): Provide biodegradable, in a dry condition and free of noxious weeds, chemical printing, ink, germination inhibitors, herbicide residue, chlorine bleach, rocks, metal, plastic, and all other materials detrimental to plant life. Product shall be suitable for spreading with a hydroseeder and may be furnished premixed by the manufacturer with an organic tackifier. 2.5 MISCELLANEOUS MATERIALS A.Antidesiccant: Provide water insoluble emulsion permeable moisture retarder for trees and shrubs. Deliver in original, sealed and fully labeled containers and mix according to manufacturer recommendations. B.Mulch: Provide rock mulch for planting beds as specified on plans. (3) inches thick in all areas designated as planter beds. Submit samples prior to installation to owners representative and/or architect. C. Stakes: Necessity of staking shall be verified by Owner's Representative prior to install. 1.Furnish Wood Stakes: 2 inch x2 inch x10 feet new, treated Lodgepole or Cedar poles: free of knots, cross grain and other defects. Stakes shall be pointed at one end. 2.Furnish nonabrasive tree guying material that is flat, woven, polypropylene material, 3/4 inch wide and 900 .pounds break strength. Color: Green. PART 3 - EXECUTION 3.1 GENERAL EXAMINATION AND PREPARATION A.General Contractor shall be responsible for excavating landscape areas to appropriate depths for placement of topsoil and mulch as specified herein. B.Protect structures, utilities, sidewalks, pavements, other facilities, and existing plant material from damage caused by planting operations. C.Ensure planting areas are free from extraneous debris prior to plant installation D.Layout individual tree and shrub locations prior to planting by placing plants in their containers above the surface in the specified planting location or place a labeled stake at the planting location. Layout bedlines with paint per plan. Adjust locations when requested and obtain Owner's Representative's acceptance of layout before planting. Make minor adjustments as necessary. 3.2 PLANTING SOIL PREPARATION A.Mix specified compost with topsoil prior to planting or apply layer of compost to surface of topsoil and mix thoroughly before plant installation. B.Compost: a) Lawn Areas: 1/4 compost : 3/4 topsoil b)Shrub Areas: 1/3 compost : 2/3 topsoil C.Fertilizer: per manufacturer recommendations 3.3 LAWN PREPARATION (Sod/Hydroseed/Seed) A.In areas of lawn installation above existing subgrade, scarify the subgrade to a minimum depth of (4) four inches with the teeth of a backhoe, loader bucket or other suitable device. B.Immediately install planting soil to the following depth and protect from traffic. 1.Lawn: (6) six inches minimum. 3.4 PLANTING BED PREPARATION A.In areas of planting soil installation above existing subgrade, scarify the subgrade to a minimum depth of (6) six inches with the teeth of a backhoe, loader bucket or other suitable device. B.Immediately install planting soil to the following depths and protect from traffic. 1.Planting Beds: (8) eight inches minimum. 2.Curbed Islands / Medians: (18) eighteen inches minimum. C.Apply pre-emergent at the manufacturer recommended rates. 3.5 EXCAVATION FOR TREES AND SHRUBS A.Excavation of Pits: Excavate pits with sides 45 degree sloped inward. Subgrade under root ball shall be kept undisturbed to reduce settling. Scarify sides of pit that may have been smoothed or smeared. 1.Excavate two times as wide as root ball diameter. 2.Do not excavate deeper than height of root ball when measured from root flare to the bottom of root ball. 3.Do not excavate subgrades of adjacent paving, structures, hardscape or other new or existing improvements. 4.Keep excavations safely covered or otherwise protected after working hours or when unattended by installer's personnel. 5.If hardpan or other unexpected rock obstructions detrimental to tree or shrub health are encountered, notify Owner's Representative prior to proceeding. 6.If subsoil conditions exhibit evidence of unexpected water seepage or retention, notify Owner's Representative prior to proceeding. 3.6 TREE AND SHRUB PLANTING A.B&B stock: Excavate pits with sides 45 degree sloped inward. Subgrade under root ball shall be kept undisturbed to reduce settling. Scarify sides of pit that may have been smoothed or smeared. 1.Prior to plantings, verify that root flare is visible at top of root ball according to ANSI Z60.1, If not visible, remove excess soil in a level manner from the root ball to where the topmost root emerges from the trunk. 2.Set balled and burlapped stock plumb and in center of the planting hole. Ensure top of root ball is at same elevation as adjacent finished landscape grade. 3.Carefully remove all twine, rope, wire, nails, ties and burlap from top and sides of root ball. Burlap may be retained on bottom. 4.Backfill with planting soil around root ball. When root ball is approximately one half filled, settle soil around root ball base with water prior to adding upper level. 5.Apply tablet fertilizer according to manufacturer recommendations. 6.Continue backfill process. Water again after placing final layer of soil. 7.Root flare must be visible. Do not cover the top of root ball with soil. 8.Water thoroughly within 4 hours of installation until no more water is absorbed. B.Container Stock: Set stock plumb and in center of the planting hole, as specified for B&B stock. Remove container by making (2) two slits on opposite sides of container. Remove bottoms of wooden boxes after partially backfilling. 1.Backfill as specified for B&B stock. C.Remove all tags/flagging/and other non-biodegradable materials from plant material immediately after installation. D.Trees planted within lawn areas shall be planted within a (3) three inch depth / (5) five inch diameter minimum mulch ring. Mulch shall be within (1) one inch, but not contacting trunk. E.If weather conditions dictate, apply an anti-desiccant to provide an adequate file over leaves, branches, and stems. F.At time of planting prune only dead, dying, or broken branches. G.Plant material found not to be in compliance with these guidelines will be rejected and shall replanted at the direction of the Owner's Representative. 3.7 TREE STABILIZATION A.If approved or requested by Owner's Representative, staking shall occur as follows: 1.Use 2 stakes per tree in conditions under normal wind (below 100 mph). Space stakes evenly around tree. 2.Use 3 stakes per tree in conditions under high wind (above 100 mph). Space stakes evenly around tree. 3.Contractor to determine if project site experiences winds high enough to require 3 stake option. 4.Prior to staking, Contractor shall verify location of existing utility and / or irrigation lines. 5.Drive stakes a minimum 18 inches into subgrade and extend upward to at least the bottom of first branches. 6.Set stakes to avoid penetrating root balls / root masses. 7.Stake placement shall not interfere with natural branching pattern. 8.Support trees with flexible ties at contact points of tree trunk. 9.Allow enough slake to avoid rigid restraint of the tree. 10.Wire shall not touch or rub trunk or branches. 11.Staking is not recommended in high pedestrian areas. 12.Contractor shall remove all staking materials at the end of the warranty period. 3.8 SOD INSTALLATION A.Any sod areas that have become compacted prior to sod installation shall be scarified to a depth of (6) six inches by teeth of a backhoe, loader bucket or other suitable device. B.Fine grade to meet lines, grades, and elevations shown and lightly moisten before planting if soil is too dry. C.Lay sod within 24 hours of receiving shipment. Do not plant sod if ground is frozen. D.Sod shall be brought onto lawn areas by wheeled means with proper protection of sod beds. Sod layers shall be experienced. Constant foreman supervisor shall be provided in inexperienced. E.Sod shall be laid tight with no gaps. Allowance shall be made for shrinkage. Lay sod with long edges perpendicular to primary slope. Butt ends and side of strips do not overlap. Stagger strips to offset joints in adjacent courses. Work on boards to avoid damage to planting soil or sod. Tamp or roll lightly to ensure contact with soil. Work sifted soil into minor cracks and remove any excess to avoid smothering live grass. F.After installation sod shall be rolled with a two hundred (200) pound roller to insure contact with soil and sod. Final rolling shall provide a uniform surface. After final rolling sod shall be watered immediately with a fine spray. Approval of sod lawn shall be based upon a uniform surface, with healthy and vigorous growth. No dead or dry spots will be accepted. G.Sod shall be separated from directly adjacent planting beds by an industry standard V-cut trench, unless other edging material is shown on plans. 3.9 SEEDING A.Moisten areas if soil is dry to touch. Water thoroughly and allow surface to drain prior to applying seed. Do not apply seed to areas of standing water. B.Drill seeding is recommended for use on slopes less than 4:1. 1.Sow seed with spreader or drill seeding machine. Do not broadcast or drop seed when wind velocity exceeds 5 mph. 2.Evenly distribute seed by sowing equal quantities in two directions at right angles to each other. 3.Do not use wet seed or seed that is moldy or otherwise damaged. 4.Do not seed against existing trees. Limit seed application to outside edge of planting saucer. C.Sow seed at a total rate of 5 to 8 lbs./1000 sq.ft. D.Rake seed lightly to incorporate seed into top 1/4 to 1/8 inch of soil, roll lightly, and water with fine spray. E.Apply hydromulch using equipment suitable for hydraulic application. F.Water newly planted areas and keep moist until grass is established. 3.10 HYDROSEEDING A.Hydroseeding is recommended for use on slopes greater than 4:1 1.Mix specified seed, fertilizer, and hydromulch in water, using equipment specifically designed for hydroseed application. Continue mixing until uniformly blending into homogeneous slurry suitable for hydraulic application. 2.Apply slurry uniformly to all areas to be seeded in a one-step process. Apply slurry at a rate so that mulch component is deposited at not less than 1500 lb./acre dry weight, and seed component is deposited at not less than the specified seed-sowing rate. B.Sow seed at a rate of 8lbs./1000 sq. ft. C.Water newly planted areas and keep moist until grass is established. 3.11 SOD ESTABLISHMENT A.Contractor shall be responsible for the first mowing and any subsequent mowings and fertilizing necessary until Final Acceptance. B.Mowing shall be conducted with an industry standard mower with blades set at (2) two inches high. C.Fertilization shall occur at (3) three to (4) four weeks after installation. Apply at manufacturer's recommended rate. 3.12 PRUNING AND MAINTENANCE A.Begin maintenance immediately after each area is planted and continue until stated Final Acceptance. B.Maintain plantings by pruning, watering, weeding, restoring planting saucers, repairing tree stabilization devices, resetting proper vertical position and other operations as necessary to establish healthy, viable plantings. Spray or treat as necessary to keep plant material free of pests and disease. Use integrated pest management, when possible, to minimize use of pesticides. C.Maintain lawns by watering, weeding, mowing, trimming, and other operations such as regrading or resodding to establish a smooth, acceptable lawn that is free from erosion or bare areas. D.Begin maintaining immediately after each area is planted and continue until satisfactory turf is established, but for not less than the following periods: 60 days from the final inspection and acceptance. 1.When maintenance period has not elapsed before end of planting season, or if turf is not fully established, continue maintaining during next planting season until accepted by the owner. 3.13 SATISFACTORY TURF A.Sod installation shall meet the following criteria determined by the Owners Representative: 1.Satisfactory Sodded Lawn: At the end of the maintenance period, a healthy, well-rooted, even-colored, viable lawn has been established, free of weed, open joints, bare areas and surface irregularities. 2.Satisfactory Seeded Lawn: At the end of the maintenance period, a healthy, uniform, close stand of grass has been established, free of weeds and surface irregularities, with coverage exceeding 90 percent over any 10 square feet and bare spots not exceeding 5 inches by 5 inches. 3.14 CLEAN UP AND PROTECTION A.During installation of plant material, keep adjacent hardscape and construction area clean and always work in an orderly condition. Clean up waste material, including trash and construction debris, and legally dispose of them off Project Site. B.Protect existing and newly installed plant material from damage due to landscape operations, operations by other contractors and trades, and other potentially harmful activities. Maintain protection during installation and maintenance periods. Treat, repair or replace damaged plant material as directed by Owner's Representative. SECTION 328400 IRRIGATION SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION Provide all labor, tools, materials, tests, equipment permits, etc., for installing the landscape irrigation system as specified and shown in the drawings. Remove all extra debris from the site. 1.2 SUMMARY A.This Section includes the following: 1.General 2.Products 3.Execution 4.Final Inspection and Acceptance 5.Measurement and Payment 1.3 RELATED DOCUMENTS AND REFERENCES: A.Related Documents: 1.Related drawings and general provisions of contract including general and supplementary conditions and specifications. B.References: 1.American Society of Testing Materials (ASTM) 2.National Sanitation Foundation (NSF) 3.Irrigation Association: Turf and Landscape Irrigation Best Management Practices 4.Idaho Standards for Public Works Construction 1.4 SUBMITTALS A.Within 30 days after receipt of Owner's Notice to Proceed Contractor shall submit: 1.Manufacturer printed product information / cutsheets for all components; 2.Shop drawings: layout, location and type of head / valve, piping circuits, circuit GPM, pipe size, controllers and accessories; 3.As-Built drawings at project completion; 4.Operations and Maintenance information: parts list, maintenance schedules and procedures for system, winterization protocol, watering schedule; 5.Warranties and guarantees; 6.Backflow prevention device certification per manufacturer requirements. 1.5 SYSTEM GUARANTEE A.Guarantee in writing all materials and workmanship for one year after Substantial Completion. Repair or replace defects during that period at no cost to the Owner. B.Fill and replace all depressions as necessary in lawn and planting beds which may result from the settlement of irrigation trenching for one year after Substantial Completion. 1.6 SYSTEM REQUIREMENTS A.Design Requirements: 1.Minimum water coverage: a)Lawn: 100%, head to head double coverage b)Planter beds: Drip / Micro irrigation coverage to each plant 2.Irrigation spray shall not direct water onto building exterior surfaces, foundations or exterior paved surfaces. Nor shall the system generate excessive runoff; 3.Ensure matched precipitation rates within each valve; 4.Separate circuits for high and low demand areas, such as shrub beds and lawn; 5.Label reclaimed water equipment with standard purple color equipment; 6.Design zones for optimal pressure and efficiency; 7.Install pressure regulating as needed; 8.Install approved backflow prevention assemblies per local codes; 9.All equipment shall be purchased new from a reputable certified dealer. 1.7 QUALITY ASSURANCE A.Contractor shall have 3 years of experience in similar work, with on-site supervision during installation. Must be licensed in the work's state. B.Follow Irrigation Association Best Management Practices. Any contradictory installation must be rectified at no cost to the Owner. C.Install only in suitable weather conditions. Do not proceed with installation in periods of heavy rain, or other detrimental weather conditions i.e. frozen ground. 1.8 DELIVERY, STORAGE, AND HANDLING A.Deliver piping with factory applied end caps and protect from damage, dirt, and moisture. B.Store piping out of direct sunlight; C.Support pipes to prevent bending and sagging; D.Contractor is responsible for all damage or loss of stored materials. 1.9 PROTECTION A.Ensure proper safeguards to prevent accidents or damage to persons and property. B.Protect existing structures, plantings, utilities, and adjacent properties. Repair any damage at Contractor's expense. C.Identify and avoid utilities. Call Dig-a-Line toll free at 1-800-422-4133 at least two working days before construction. 1.10POINT OF CONNECTION A.Contractor shall comply with all requirements of water supply utility company for prevention of backflow and back-siphonage. 1.11 CUTTING, PATCHING, TRENCHING, AND DIGGING A.Contractor shall do all cutting, fitting, trenching, or patching as required to complete the project. PART 2- PRODUCTS 2.1 PIPING MATERIAL A. Use compatible manufacturers for pipes and fittings. A. Plastic Pipe: 1.Must be free of defects and clearly marked with manufacturer's name, size, class and pressure rating. 2.Pressure main line: Schedule 40 solvent weld; 3.Lateral lines: Class 200 PVC; 4.Sleeving: Class 200 PVC; four (4) inch minimum or double the size of the largest working pipe, whichever is greater; 5.Fittings: Schedule 40 solvent weld; 6.Solvent: NSF approved solvent for Type I and II PVC. C. Polyethylene Pipe: Class 100 UV resistant D. Drip Line: UV resistant, min. 0.6GPH drippers at 18” spacing. Complete system with same manufacturer flushing valves, filters air relief valves. 2.2 BACKFLOW PREVENTION DEVICE A. The backflow prevention device shall be certified for use per local and state codes and be listed on U.S.C's “List for Approved Devices.” 2.3 BACKFLOW PREVENTER CAGE A. A heavy-duty steel mesh cage with rust proof finish, tamper proof lock, green or approved color on a concrete base or as required by manufacturer. 2.4 VALVES A. Manual Valves: direct burial rated, 150 PSI rating, treaded connections with cross type handle designed to receive operating key. B. Automatic Circuit Valves: high impact plastic with corrosion resistant internal parts, electrically operated with flow control capability for manual operation, normally closed, commercial grade. C. Drip Kits: all-in-one kit with filter and pressure regulator, electrically operated, and commercially grade. D. Quick coupler valves: one piece, heavy duty, brass or bronze with 150 PSI rating, built in flow control and self closing valve. 2.5 PRESSURE REGULATOR A. Pressure regulator shall be certified to NSF/ANSI 372 consisting of low lead bronze body, separate access cap shall be threaded to the body and shall not require the use of ferrous screws. 2.6 SPRINKLER BODIES A. All nozzles and bodies shall be from the same manufacturer, appropriate for area and flow. B.All low elevation sprinkler heads shall have check valves installed to limit flow runoff. 2.7 AUTOMATIC CONTROLLER A. Furnished controller shall be an industry standard, commercial grade unit with evapo-transpiration or other weather sensor and ability to self adjust based on local climatic conditions. Fully contained in a weather resistant, lockable box. Wire per manufacturer recommendations. 2.8 CONTROLLER DECODERS A. Per the controller manufacturer's specifications. 2.9 MISCELLANEOUS EQUIPMENT A. Valve boxes: high impact, green in color. Visual modifications to valve boxes accommodate poorly located lateral lines, mainlines, or valves will not be accepted. Modifications to valve boxes are only allowed on the bottom of the box not visible from top view. 1.Size: as required for valves and service, generally: a).20 inch x 12 inch rectangular (remote control valves drain valves, air relief valves and electrical pull boxes) b).24 inch x 13 inch rectangular (remote drip valves) c).6 inch round (drip air relief valves and drip flush valves) B. Valve cover: lockable, compatible with valve box. C. Drainage backfill: clean gravel or crushed rock, 3/4 inch minimum depth. D. Tracer tape: (3) three-inch-wide industry standard locator tape. 2.10EQUIPMENT TO BE FURNISHED TO OWNER A. Two (2) sets of keys for each automatic controller. B. Two (2) 48-inch tee wrenches for operating the gate valves. C. Three (3) sets of special tools required for removing, disassembling and adjusting each type of sprinkler and valve supplied on this project. D. Five (5) Extra sprinkler heads, nozzles, shrub adapters, nozzle filter screens, for each type used on the project. E. Two (2) quick coupler keys to match manufacturer type of quick coupler. F. As built / record drawings and Controller Run Schedule. PART 3 - EXECUTION 3.1 GENERAL REQUIREMENTS A.Install system to provide adequate protection against freeze damage. B.Install system per approved drawings. All deviations from plans must be clearly recorded on record drawings. C.Do not exceed recommended head spacing shown on drawings for any given area. If any modified spacing made at the decision of the Contractor demands additional material than shown on the drawings, it shall be at no cost to the Owner. D. Locate all underground utilities. Protect all existing structures and utilities in place. Repair or replace said structures or utilities damaged by this work at no cost to Owner. E.Irrigation plan layout is diagrammatic. The mainline and other related irrigation equipment is often shown within paving for clarity only. The actual location of irrigation equipment shall always be located inside landscape areas. Minor adjustments to the system to conform to site conditions are acceptable. 3.2 SLEEVING A.Coordinate with other trades as necessary to install necessary sleeving. 1.All sleeves shall extend a minimum of 12 inches beyond all hardscape edges. 2.All sleeving shall occur in bundles of two (2) unless otherwise approved. 3.All sleeves shall include detectable tracer tape. 3.3 TRENCHING AND BACKFILLING A.Trenching and backfilling per ISPWC Section with no abrupt grade changes. 1.Mainline and sleeving: minimum 24 inches - maximum 30 inches. 2.Laterals: minimum 12 inches - maximum 18 inches. 3.Surround all lines with 2 inch minimum of clean and rock free material on all sides. 3.4 PIPE INSTALLATION A.General Pipe Installation 1.Exercise caution in handling, loading and storing of plastic pipe and fittings to avoid damage. 2.Lay PVC in accordance with standard practice. Thrust blocks to be used at points of intersection and change of direction in main line. Install manual drains. 3.PVC joints shall be solvent weld. Cut pipe, deburr, wipe surface clean of all saw chips, dust, dirt, moisture and all foreign matter which may contaminate the cemented joint. Apply cleaner / primer and solvent cement, make joints in accordance with any manufacturer's recommendations. Use Teflon thread sealant tape at all threaded joints. 4.Dripline shall be placed in shallow trench (2) two inches below finish topsoil grade and below specified mulch. Lay in uniform linear pattern in planting beds with rows 24 inches apart maximum. Coil 20 linear feet around base of each tree. Staple at 36 inch maximum offsets. Flush all lines with full head of water prior to installation of flush valves at end of circuit runs. Install flush valve at end of each circuit run. Stainless steel clamps if pressure exceeds recommended rating for perma-loc fittings. 5.Contractor shall be responsible for sizing all circuit pipe. Water velocity in pipes shall not exceed five feet per second. Minimum pipe size shall be one inch. 3.5 FLUSHING A.Cap pipe openings to prevent debris. B.After completion and prior to the installation of any terminal fittings, the entire pipeline system shall be thoroughly flushed to remove dirt, debris or other material. 3.6 HYDROSTATIC PRESSURE TESTING A.After flushing, and the installation of valves the following tests shall be conducted in the sequence listed below. The Contractor shall furnish all equipment; materials and labor necessary to perform the tests and all tests shall be conducted in the presence of the Owner's Representative, if requested. B.Water pressure tests shall be performed on all pressure main lines before any couplings, fittings, valves and the like are concealed. C.Immediately prior to testing, all irrigation lines shall be purged of all entrapped air or debris by adjusting control valves and installing temporary caps forcing water and debris to be discharged from a single outlet. D.Test all pressure main line at 100 PSI for a minimum of 30 minutes with an allowable loss of 5 PSI without introduction of any additional service or pumping pressure. E.Retest as required until the system meets the requirements. Any leaks, which occur during test period, shall be repaired immediately following the test. All pipes shall be retested until final written acceptance. F.The Contractor is responsible for providing documentation stating the weather conditions, date, the start time and initial water pressure readings, the finish time and final water pressure readings and the type of equipment used to perform the test. G.Submit a written report of the pressure testing results with the other above required information to the Owner's Representative for approval. 3.7 BACKFLOW PREVENTER TESTING A.The backflow prevention assembly shall be tested according to procedures and results per the requirements of the Foundation for Cross-Connection Control and Hydraulic Research, University of Southern California or American Water Works Association, whichever is more stringent. B.Testing shall be performed by a Backflow Prevention Assembly Tester with a current certification from the American Backflow Preventer Association. 3.8 INSTALLATION OF EQUIPMENT A. Pressure Regulator (if necessary): 1.Set regulator for required PSI per manufacturer's specifications. B. Valves: 1.Install check valve(s) approximately at locations necessary to prevent low head run off. 2.Install isolation valve(s) on main line, approximate equal spacing, intervals of approximately 500 feet and locate prior to all hardscape crossings or as shown on appropriate plans. 3.Install no more than (2) two drip kit valves per valve box. 4.Install no more than (2) two remote control valves per standard valve box and (3) three per jumbo valve box. 5.Remote control valve manifolds and quick coupler valves shall be separate, allowing use of a quick coupler with all remote-control valves shut off. 6.Install valve boxes parallel to each other when practical. 7.Allow 12 inches of clearance between adjacent valve boxes. 8.Install each quick coupler valve in its own valve box with thrust blocks. 9.Install thrust blocks on quick couplers. 10.Install quick coupler on main line with approximate equal spacing at intervals of 200 feet. 11.Locate all valves 6 inches - 12 inches off of paved surfaces, when practical for ease of access. C. Sprinkler Heads: 1.All main lines and lateral lines, including risers, shall be flushed and pressure tested before installing sprinkler heads. 2.Install specified sprinkler heads as shown in details at locations shown on the drawings. Adjust layout for full coverage, spacing of heads shall not exceed the maximum spacing recommended by the manufacturer. 3.All sprinkler heads shall be set perpendicular to finish grade. D. Irrigation Controller: 1.Contractor shall be responsible to provide 120 volt power and all required circuits from the electrical panel to the irrigation controller, size wire and conduit as required. 2.Remote control valves shall be connected to controller in an intuitive numerical sequence. 3.Controller shall be tested with complete electrical connections. The Contractor shall be responsible for temporary power to the controller for operation and testing purposes. 4.Connections to control wiring shall be made within the pedestal of the controller, when applicable. All wire shall follow the pressure main insofar as possible. 5.Make all electrical splices in boxes only. All joints shall be waterproof. Scotch-Loc connectors or similar product. 6.Provide 36-inch loop in wires at each valve where controls are connected and at 100 feet maximum intervals between. 7.The tracer wire shall be placed on the bottom of the trench under the vertical projection of the pipe with spliced joints soldered and covered with insulation type tape. E. Adjustment and Coverage Test 1.Adjustment and Coverage Test: a)The Contractor shall flush and adjust all sprinkler heads, valves and all other equipment to ascertain that they function according to the manufacturer's data. b)Adjust all sprinkler heads not to overspray onto walks, roadways and buildings when under maximum operating pressure and during times of normal prevailing winds. c)System is workable and efficient. Coverage of water afforded to all areas shall be complete, adequate and uniform. Change heads, nozzles, and or make necessary adjustments to provide uniform and balanced coverage. 3.9 CLEAN-UP A.During installation and after completion, Contractor shall remove trash and debris as necessary to keep an orderly appearance of project site and / or neighboring right of ways and property. 3.10GENERAL MAINTENANCE AND WINTERIZATION A.General maintenance shall begin immediately after installation of the irrigation system. The period shall include the following: 1.On a weekly basis the Contractor shall keep the irrigation system in good running order and make observations on the system for proper coverage and operation. Repair and clean to keep system fully operational. 2.Record recommended controller schedule and turn over to Owner's Representative at time of Final Acceptance. 3.Provide winterization of the system at the end of the first season of operation and review procedures with Owner's Representative. 4.Maintenance Period: 60 days from final installation and acceptance. 5.One Year Warranty Review: Schedule with owner for follow up and one-year post installation review of the project. Contractor shall correct deficiencies which are identified for replacement under the one-year warranty. 3.11 RECORD DRAWINGS A.Contractor shall maintain accurate records of all installed work and deviations from original design and provide to Owner's Representative upon finalizing system. 3.12 WARRANTY A.All work and materials shall be guaranteed to give satisfactory service for a period of one (1) year from the date of final Acceptance. B.Should problems develop due to inferior or faulty workmanship the contractor shall correct the problem at no expense to the Owner. C.The warranty period will not begin until the entire system is operable, and the Owner's Representative has observed operation of all irrigation zones, and all outstanding items are resolved. The contractor shall provide As Built/Record Drawings during the observation period to confirm accuracy and completeness. LA N D S C A P E N O T E S / S P E C I F I C A T I O N S L3.02 22 " x 3 4 " C A R D U R R A G R O U P , I N C . T H I S I N S T R U M E N T I S T H E P R O P E R T Y O F A R D U R R A . A N Y R E P R O D U C T I O N , R E U S E O R M O D I F I C A T I O N O F T H I S I N S T R U M E N T O R I T S C O N T E N T S W I T H O U T S P E C I F I C W R I T T E N P E R M I S S I O N O F A R D U R R A I S S T R I C T L Y P R O H I B I T E D DE S I G N E D DR A W N CH E C K E D AP P R O V E D BO R D E R S I Z E PROJECT: DATE: L: \ 2 3 0 0 7 4 \ 0 3 _ C A D \ S H E E T S \ C O N S T R U C T I O N _ D R A W I N G S \ L A N D S C A P E \ 2 3 0 0 7 4 - L - C O V E R . D W G , 9/9 / 2 0 2 5 101/2 ATTENTION: IF THIS BAR DOES NOT MEASURE 1" ON 22x34 SHEET or 1/2" ON 11x17 SHEET, THEN DRAWING IS NOT TO SCALE SHEET:SHEET:20 2 5 33 2 N . B R O A D M O R E W A Y NA M P A , I D A H O 8 3 6 8 7 20 8 - 4 4 2 - 6 3 0 0 | W W W . A R D U R R A . C O M September 9, 2025 A. T A Y L O R A. T A Y L O R J. S N Y D E R J. S N Y D E R 230074 HU N T I N G T O N R I D G E E A S T S U B D I V I S I O N N O . 3 DA T E RE V I S I O N S NO . DE S C R I P T I O N LA N D S C A P E C O N S T R U C T I O N D R A W I N G S F O R 09/10/25 City of Caldwell APPROVED FOR CONSTRUCTION These plans and/or specifications have been reviewed for compliance with the City of Caldwell specifications. This review does not relieve the owner, engineer, or contractor of the responsibility to design and/or construct these facilities in compliance with all current applicable federal, state, and local laws, rules, regulations, ordinances, orders of decisions, development agreements, or specifications. Inconsistencies not isolated by City staff shall not be construed as approved unless specifically addressed as a variance and granted by City Council as a variance. The City retains the right to enforce provisions of said document and policies even if inconsistencies are not noted by the City. Any revisions of these approved plans will require a resubmittal for a full review and approval. Name:Martin Gergen