Loading...
HomeMy WebLinkAboutMapping Memo - ANN25-000009, SPP25-000012- Summit Grove Sub Memorandum To: Joe Dodson, Principal Planner Caldwell P & Z Department From: Trevor Farris, GIS Technician Dave Marston, Mapping Superintendent Re: ANN25-000009, SPP25-000012- Summit Grove Subdivision Date: December 18, 2025. The Mapping Department provides the following comments on a request by Taylor Schmidt of SI Construction LLC, is requesting annexation of one (1) parcel (R2799800000) with a proposed zoning of R-2, where the current City comprehensive plan future land use map place type is Neighborhood 2. Additionally, the applicant is requesting approval of a preliminary plat for Summit Grove Subdivision, a residential subdivision with 32 total building lots (31 single-family attached building lots and one (1) single-family detached building lot for the existing home). The 4.63 acre development is located on the east side of Dorman Avenue, approximately 325 feet south of the intersection with W. Linden Road. Address Number 1. Please contact the Mapping Department prior to permitting. Subdivision Name 1. Approved Lots & Blocks 1. Approved. Street Names 1. Approved. Other comments: 1. Any changes to street names, lots or blocks shall be approved by the Mapping Department prior to construction drawing approval for the phase where changes are intended.