Loading...
HomeMy WebLinkAboutHD4_WestbiltEstates Page 1 of 2 December 30, 2025 City of Caldwell Planning & Zoning Commission and City Council 621 Cleveland Blvd Caldwell, Idaho 83605 RE: ANN25-00011/SPP25-0015 Westbilt Estates Subdivision Canyon Co Parcels R32825012 & R32825011 aka 0 Lake Ave Lake Avenue Frontage Dear Council Members and Commissioners: Highway District No. 4 (HD4) has reviewed the application for annexation and preliminary plat for Westbilt Estates Subdivision, approximately 66 acres located west of Lake Avenue between SH 55 and Orchard Avenue. The development is proposing approximately 194 single family residential lots. HD4 provides the following comments on the proposed development: 1. By agreement with the City, (Exchange Maintenance Agreement, 2008) HD4 operates and maintains Lake Avenue along the east boundary of the subject property. Under this agreement, HD4 is responsible for access permitting and utility permitting for Lake Avenue, and is provided opportunity to review and comment on development plans as they may impact the operation and maintenance of the highway. 2. Lake Avenue is classified as a minor arterial adjacent to the project on the functional classification maps adopted by HD4 and the City. Direct driveway or local or private street access is typically restricted to support higher traffic volumes and speeds along these corridors. The proposed Cirrus Drive and Willowmere Street public roadway approaches appear to meet city standards for access spacing to an arterial roadway. 3. HD4 requests that the City include as part of any development agreement for the project a clause requiring dedication of public right-of-way for Lake Avenue upon written request of the City, to facilitate construction of public roadway improvements independent of the timing of the proposed development. 4. A traffic impact study was not included with the application materials. Using the 11th Edition of the ITE Trip Generation Manual, the development is expected to generate approximately 1,829 daily vehicle trips, with 192 trips anticipated in the PM peak hour. These new trips will have a significant impact on the operations and capacity of the nearby roadway network. The City should, through exactions or other fees, determine and require a proportionate share of the costs necessary to improve capacity at local intersections affected by new traffic from the development, including but not limited to the Lake Ave/Orchard Ave intersection. Page 2 of 2 5. Due to the impacts from this development and other growth within the City, HD4 requests that the city accept for maintenance Lake Avenue between SH 55 (Karcher Rd) and Orchard Avenue, including the public road intersections within those limits. This will best allow the city to oversee approval of improvement plans (including utility extensions and traffic safety or capacity projects) affecting these roadways, and remove an overlapping and unnecessary layer of permitting and inspection by the highway district. Highway District No. 4 appreciates the opportunity to review this development application, and requests that the Commission and Council consider these comments in their deliberations. Please feel free to contact me with any questions on these comments. Respectfully, Chris Hopper, P.E. District Engineer CC: Hallie Hart, P.E. Caldwell City Engineer File: Caldwell_Lake Ave- Westbilt Sub