Loading...
HomeMy WebLinkAboutHotelElevations_HaystackApts_SaddleHilton_V2GENERAL NOTES: EXTERIOR ELEVATIONS 1. REF. GENERAL NOTES FOR DIMENSION, ABBREVIATIONS AND OTHER GENERAL PROCEDURES. 2. ALL HANDRAILS SHALL BE STAINLESS STEEL U.N.O. 3. ALL STRUCTURAL METALS SHALL BE GALVANIZED, PRIMED AND PAINTED FLAT. REF. EXTERIOR FINISH SCHEDULE FOR COLOR(S). 4. AT PERIMETER JOINT BETWEEN ALUMINUM FRAMING SYSTEMS AND DISSIMILAR MATERIALS, PROVIDE MINIM 3/8" CONTINUOUS BACKER ROD AND SEALANT JOINT ON ALL SIDES. 5. AT ALUMINUM FRAMING SYSTEMS, PROVIDE CONTINUOUS ALUMINUM SUB SILLS WITH END DAMS, WELDED JOINTS, TYP. 6. PRIOR TO INSTALLATION OF EXTERIOR LOUVERS, HORNS, LIGHT FIXTURES, FIRE ALARM DEVICES, ETC. CONTRACTOR SHALL HAVE COORDINATION MEETING WITH ARCHITECT AND APPROPRIATE CONSULTANT TO VERIFY INSTALLATION HEIGHTS AND CLEARANCES. 7. COORDINATE LOCATION OF ALL CONTROL JOINTS WITH ARCHITECT PRIOR TO INSTALLATION. 8. ALL STOREFRONT AND WINDOW FRAME SHALL BE ANODIZED ALUMINUM U.N.O. 9. ALL VERTICAL EXPOSED CONCRETE SHALL HAVE A HAND RUBBED FINISH U.N.O. ALL HORIZONTAL EXPOSED CONCRETE SHALL HAVE A LIGHT BROOM FINISH U.N.O. 10. BUILDING SIGNAGE IS PER OWNER UNDER SEPARATE PERMIT, CONTRACTOR TO PROVIDE ROUGH IN ELECTRICAL AND STRUCTURAL SUPPORTS AS OUTLINED WITHIN THESE DOCUMENTS. 11. CONTRACTOR SHALL SUBMIT ALL FINISH SAMPLES FOR EXTERIORS AT A SINGLE TIME FOR APPROVAL OF EXTERIOR FINISH SYSTEM. LEVEL 1 0" LEVEL 2 13' -6" 1 A301 ROOF 43' -11 1/4" ADGEBC LEVEL 3 23' -7 3/4" LEVEL 4 33' -9 1/2" F 2 A301 5' - 2 " 10 ' - 1 3 / 4 " 10 ' - 1 3 / 4 " 10 ' - 1 3 / 4 " 13 ' - 6 " EIFS-004 EIFS-003 EIFS-001 1 A421 PARAPET 49' -1 1/4" 49 ' - 1 1 / 4 " LEVEL 1 0" LEVEL 1 0" LEVEL 2 13' -6" LEVEL 2 13' -6" ROOF 43' -11 1/4" ROOF 43' -11 1/4" 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 LEVEL 3 23' -7 3/4" LEVEL 3 23' -7 3/4" LEVEL 4 33' -9 1/2" LEVEL 4 33' -9 1/2" 20 21 22 23 4 A302 3 A302 2 A302 1 A302 5'- 2 " 10 ' - 1 3 / 4 " 10 ' - 1 3 / 4 " 10 ' - 1 3 / 4 " 13 ' - 6 " EIFS-001 EIFS-002 EIFS-004 EIFS-003 EIFS-004 BRV-001 EIFS-003 BRV-001 EIFS-004 EIFS-002 EIFS-002 EIFS-002 EIFS-002 FCP-001EIFS-004 PARAPET 49' -1 1/4" PARAPET 49' -1 1/4" 49 ' - 1 1 / 4 " 43 ' - 1 1 1 / 4 " 1' - 1 0 " 5'- 2 " 10 ' - 1 3 / 4 " 10 ' - 1 3 / 4 " 10 ' - 1 3 / 4 " 13 ' - 6 " 7' - 1 0 " STAIR TOWER EIFS-001 EIFS 1 -WHITE FCP-001 FIBER CEMENT PANEL 1 - CEDAR EIFS-002 EIFS 2 -DARK BROWN EIFS-003 EIFS 3 -BLUE EIFS-004 EIFS 4 -GRAY EXTERIOR FINISH LEGEND BRICK VENEER -COLOR?BRV-001 ISSUED SETS SHEET: DRAWN: CHECKED: JOB NO: REVISIONS DA T E : PL O T T E D B Y : FIL E P A T H : 08.29.2025 SCHEMATIC DESIGN SET 9/1 8 / 2 0 2 5 1 2 : 0 4 : 5 1 P M Au t o d e s k D o c s : / / 2 5 3 2 C a l d w e l l I D S a d d l e A v e H i l t o n / 25 3 2 _ S a d d l e A v e _ A r c h _ R 2 5 _ C e n t r a l . r v t A201 HI L T O N D U A L B R A N D H O M E 2 H A M P T O N I N N EX T E R I O R E L E V A T I O N S 0 S A D D L E A V E - - 2532 SC H E M A T I C DE S I G N 1/8" = 1'-0"2 NORTH ELEVATION 1/8" = 1'-0"3 EAST ELEVATION REV# DATE DESCRIPTION GENERAL NOTES: EXTERIOR ELEVATIONS 1. REF. GENERAL NOTES FOR DIMENSION, ABBREVIATIONS AND OTHER GENERAL PROCEDURES. 2. ALL HANDRAILS SHALL BE STAINLESS STEEL U.N.O. 3. ALL STRUCTURAL METALS SHALL BE GALVANIZED, PRIMED AND PAINTED FLAT. REF. EXTERIOR FINISH SCHEDULE FOR COLOR(S). 4. AT PERIMETER JOINT BETWEEN ALUMINUM FRAMING SYSTEMS AND DISSIMILAR MATERIALS, PROVIDE MINIM 3/8" CONTINUOUS BACKER ROD AND SEALANT JOINT ON ALL SIDES. 5. AT ALUMINUM FRAMING SYSTEMS, PROVIDE CONTINUOUS ALUMINUM SUB SILLS WITH END DAMS, WELDED JOINTS, TYP. 6. PRIOR TO INSTALLATION OF EXTERIOR LOUVERS, HORNS, LIGHT FIXTURES, FIRE ALARM DEVICES, ETC. CONTRACTOR SHALL HAVE COORDINATION MEETING WITH ARCHITECT AND APPROPRIATE CONSULTANT TO VERIFY INSTALLATION HEIGHTS AND CLEARANCES. 7. COORDINATE LOCATION OF ALL CONTROL JOINTS WITH ARCHITECT PRIOR TO INSTALLATION. 8. ALL STOREFRONT AND WINDOW FRAME SHALL BE ANODIZED ALUMINUM U.N.O. 9. ALL VERTICAL EXPOSED CONCRETE SHALL HAVE A HAND RUBBED FINISH U.N.O. ALL HORIZONTAL EXPOSED CONCRETE SHALL HAVE A LIGHT BROOM FINISH U.N.O. 10. BUILDING SIGNAGE IS PER OWNER UNDER SEPARATE PERMIT, CONTRACTOR TO PROVIDE ROUGH IN ELECTRICAL AND STRUCTURAL SUPPORTS AS OUTLINED WITHIN THESE DOCUMENTS. 11. CONTRACTOR SHALL SUBMIT ALL FINISH SAMPLES FOR EXTERIORS AT A SINGLE TIME FOR APPROVAL OF EXTERIOR FINISH SYSTEM. LEVEL 1 0" LEVEL 2 13' -6" 1 A301 ROOF 43' -11 1/4" A D GEBC LEVEL 3 23' -7 3/4" LEVEL 4 33' -9 1/2" F 2 A301 5' - 2 " 10 ' - 1 3 / 4 " 10 ' - 1 3 / 4 " 10 ' - 1 3 / 4 " 13 ' - 6 " EIFS-003 EIFS-002 BRV-001 EIFS-004 EIFS-002 1 A421 PARAPET 49' -1 1/4" 43 ' - 1 1 1 / 4 " 49 ' - 1 1 / 4 " 7' - 1 0 " 56 ' - 1 1 1 / 4 " LEVEL 1 0" LEVEL 2 13' -6" ROOF 43' -11 1/4" 12345678910111213141516171819 LEVEL 3 23' -7 3/4" LEVEL 4 33' -9 1/2" 20212223 4 A302 3 A302 2 A302 1 A302 13 ' - 6 " 10 ' - 1 3 / 4 " 10 ' - 1 3 / 4 " 10 ' - 1 3 / 4 " 5'- 2 " 7' - 1 0 " EIFS-004 EIFS-004 EIFS-003EIFS-001 BRV-001 EIFS-001 EIFS-004 EIFS-002 FCP-001 BRV-001EIFS-004 EIFS-003 EIFS-002 PARAPET 49' -1 1/4" 56 ' - 1 1 1 / 4 " 43 ' - 1 1 1 / 4 " STAIR TOWER 49 ' - 1 1 / 4 " EIFS-001 EIFS 1 -WHITE FCP-001 FIBER CEMENT PANEL 1 - CEDAR EIFS-002 EIFS 2 -DARK BROWN EIFS-003 EIFS 3 -BLUE EIFS-004 EIFS 4 -GRAY EXTERIOR FINISH LEGEND BRICK VENEER -COLOR?BRV-001 ISSUED SETS SHEET: DRAWN: CHECKED: JOB NO: REVISIONS DA T E : PL O T T E D B Y : FIL E P A T H : 08.29.2025 SCHEMATIC DESIGN SET 9/1 8 / 2 0 2 5 1 2 : 0 7 : 3 2 P M Au t o d e s k D o c s : / / 2 5 3 2 C a l d w e l l I D S a d d l e A v e H i l t o n / 25 3 2 _ S a d d l e A v e _ A r c h _ R 2 5 _ C e n t r a l . r v t A202 HI L T O N D U A L B R A N D H O M E 2 H A M P T O N I N N EX T E R I O R E L E V A T I O N S 0 S A D D L E A V E - - 2532 SC H E M A T I C DE S I G N 1/8" = 1'-0"2 SOUTH ELEVATION 1/8" = 1'-0"1 WEST ELEVATION REV# DATE DESCRIPTION