HomeMy WebLinkAboutHotelElevations_HaystackApts_SaddleHilton_V1GENERAL NOTES: EXTERIOR ELEVATIONS
1.
2.3.
4.
5.
6.
7.
8.
9.
10.
11.
REF. GENERAL NOTES FOR DIMENSION, ABBREVIATIONS AND OTHER GENERAL PROCEDURES.ALL HANDRAILS SHALL BE STAINLESS STEEL U.N.O.ALL STRUCTURAL METALS SHALL BE GALVANIZED, PRIMED AND PAINTED FLAT. REF. EXTERIOR FINISH SCHEDULE FOR COLOR(S).AT PERIMETER JOINT BETWEEN ALUMINUM FRAMING SYSTEMS AND DISSIMILAR MATERIALS, PROVIDE MINIM 3/8" CONTINUOUS BACKER ROD AND SEALANT JOINT ON ALL SIDES.AT ALUMINUM FRAMING SYSTEMS, PROVIDE CONTINUOUS ALUMINUM SUB SILLS WITH END DAMS, WELDED JOINTS, TYP.PRIOR TO INSTALLATION OF EXTERIOR LOUVERS, HORNS, LIGHT FIXTURES, FIRE ALARM DEVICES, ETC. CONTRACTOR SHALL HAVE COORDINATION MEETING WITH ARCHITECT AND APPROPRIATE CONSULTANT TO VERIFY INSTALLATION HEIGHTS AND CLEARANCES.COORDINATE LOCATION OF ALL CONTROL JOINTS WITH ARCHITECT PRIOR TO INSTALLATION.ALL STOREFRONT AND WINDOW FRAME SHALL BE ANODIZED ALUMINUM U.N.O.ALL VERTICAL EXPOSED CONCRETE SHALL HAVE A HAND RUBBED FINISH U.N.O. ALL HORIZONTAL EXPOSED CONCRETE SHALL HAVE A LIGHT BROOM FINISH U.N.O.BUILDING SIGNAGE IS PER OWNER UNDER SEPARATE PERMIT, CONTRACTOR TO PROVIDE ROUGH IN ELECTRICAL AND STRUCTURAL SUPPORTS AS OUTLINED WITHIN THESE DOCUMENTS.CONTRACTOR SHALL SUBMIT ALL FINISH SAMPLES FOR EXTERIORS AT A SINGLE TIME FOR APPROVAL OF EXTERIOR FINISH SYSTEM.
EXTERIOR FINISH LEGEND
BRICK VENEER - COLOR?BRV-001
ISSUED SETS
01.01.01 TEMPLATE
SHEET:
DRAWN:
CHECKED:
JOB NO:
REVISIONS
DA
T
E
:
PL
O
T
T
E
D
B
Y
:
FIL
E
P
A
T
H
:
8/2
5
/
2
0
2
5
1
2
:
0
2
:
0
4
P
M
Au
t
o
d
e
s
k
D
o
c
s
:
/
/
2
5
3
2
C
a
l
d
w
e
l
l
I
D
S
a
d
d
l
e
A
v
e
H
i
l
t
o
n
/
2
5
3
2
_
S
a
d
d
l
e
Av
e
_
A
r
c
h
_
R
2
5
_
C
e
n
t
r
a
l
.
r
v
t
A201
SA
D
D
L
E
A
V
E
EX
T
E
R
I
O
R
E
L
E
V
A
T
I
O
N
S
En
t
e
r
a
d
d
r
e
s
s
h
e
r
e
-
-
Project Number
SC
H
E
M
A
T
I
C
D
E
S
I
G
N
1/8" = 1'-0"2 NORTH ELEVATION
REV#DATE DESCRIPTION
1/8" = 1'-0"3 EAST ELEVATION
GENERAL NOTES: EXTERIOR ELEVATIONS
1.
2.3.
4.
5.
6.
7.
8.
9.
10.
11.
REF. GENERAL NOTES FOR DIMENSION, ABBREVIATIONS AND OTHER GENERAL PROCEDURES.ALL HANDRAILS SHALL BE STAINLESS STEEL U.N.O.ALL STRUCTURAL METALS SHALL BE GALVANIZED, PRIMED AND PAINTED FLAT. REF. EXTERIOR FINISH SCHEDULE FOR COLOR(S).AT PERIMETER JOINT BETWEEN ALUMINUM FRAMING SYSTEMS AND DISSIMILAR MATERIALS, PROVIDE MINIM 3/8" CONTINUOUS BACKER ROD AND SEALANT JOINT ON ALL SIDES.AT ALUMINUM FRAMING SYSTEMS, PROVIDE CONTINUOUS ALUMINUM SUB SILLS WITH END DAMS, WELDED JOINTS, TYP.PRIOR TO INSTALLATION OF EXTERIOR LOUVERS, HORNS, LIGHT FIXTURES, FIRE ALARM DEVICES, ETC. CONTRACTOR SHALL HAVE COORDINATION MEETING WITH ARCHITECT AND APPROPRIATE CONSULTANT TO VERIFY INSTALLATION HEIGHTS AND CLEARANCES.COORDINATE LOCATION OF ALL CONTROL JOINTS WITH ARCHITECT PRIOR TO INSTALLATION.ALL STOREFRONT AND WINDOW FRAME SHALL BE ANODIZED ALUMINUM U.N.O.ALL VERTICAL EXPOSED CONCRETE SHALL HAVE A HAND RUBBED FINISH U.N.O. ALL HORIZONTAL EXPOSED CONCRETE SHALL HAVE A LIGHT BROOM FINISH U.N.O.BUILDING SIGNAGE IS PER OWNER UNDER SEPARATE PERMIT, CONTRACTOR TO PROVIDE ROUGH IN ELECTRICAL AND STRUCTURAL SUPPORTS AS OUTLINED WITHIN THESE DOCUMENTS.CONTRACTOR SHALL SUBMIT ALL FINISH SAMPLES FOR EXTERIORS AT A SINGLE TIME FOR APPROVAL OF EXTERIOR FINISH SYSTEM.
EXTERIOR FINISH LEGEND
BRICK VENEER - COLOR?BRV-001
ISSUED SETS
01.01.01 TEMPLATE
SHEET:
DRAWN:
CHECKED:
JOB NO:
REVISIONS
DA
T
E
:
PL
O
T
T
E
D
B
Y
:
FIL
E
P
A
T
H
:
8/2
5
/
2
0
2
5
1
2
:
0
2
:
1
6
P
M
Au
t
o
d
e
s
k
D
o
c
s
:
/
/
2
5
3
2
C
a
l
d
w
e
l
l
I
D
S
a
d
d
l
e
A
v
e
H
i
l
t
o
n
/
2
5
3
2
_
S
a
d
d
l
e
Av
e
_
A
r
c
h
_
R
2
5
_
C
e
n
t
r
a
l
.
r
v
t
A202
SA
D
D
L
E
A
V
E
EX
T
E
R
I
O
R
E
L
E
V
A
T
I
O
N
S
En
t
e
r
a
d
d
r
e
s
s
h
e
r
e
-
-
Project Number
SC
H
E
M
A
T
I
C
D
E
S
I
G
N
1/8" = 1'-0"2 SOUTH ELEVATION
REV#DATE DESCRIPTION
1/8" = 1'-0"1 WEST ELEVATION