Loading...
HomeMy WebLinkAboutHD4_Element Ridge_V1 Page 1 of 2 October 23, 2024 City of Caldwell Planning & Zoning Commission and City Council 621 Cleveland Blvd Caldwell, Idaho 83605 RE: ANN24-00013/SPP24-0002 Element Ridge Subdivision Canyon Co Parcel R32681 aka 0 10th Avenue 10th Avenue Frontage & Traffic Impacts Dear Council Members and Commissioners: Highway District No. 4 (HD4) has reviewed the application for annexation and preliminary plat for Element Ridge Subdivision, approximately 75 acres located on the west side of 10th Avenue 1/4 mile north of SH 55. The development is proposing approximately 215 new single family homes. HD4 provides the following comments on the proposed development: 1. By agreement with the City, (Exchange Maintenance Agreement, 2008) HD4 operates and maintains 10th Avenue along the east boundary of the subject property. Under this agreement, HD4 is responsible for access permitting and utility permitting along 10th Ave, and is provided opportunity to review and comment on development plans as they may impact the operation and maintenance of the highway. HD4 also maintains David Street and Airport Avenue adjacent to the proposed development. 2. 10th Avenue is classified as a minor arterial on the functional classification maps adopted by HD4 and the City. Direct driveway or local or private street access is typically restricted to support higher traffic volumes and speeds along these corridors. The proposed Neon Hills Drive access to 10th Avenue (+/- 2,220-ft north of SH 55) appears to meet city standards for access spacing to an arterial roadway. This approach should be aligned opposite the northerly access to Vallivue Middle School to avoid conflicts with left-turning movements. 3. The emergency access roadway to David Street should include a fire gate or bollards to restrict vehicular access except as allowed by emergency services providers. Given the proposed Bear Lane connection to the Airport Ave/David St intersection, is the emergency access necessary? 4. Proposed meander for Bear Lane at Airport Ave should be per MUTCD for a 35 mph design speed. Additional signage on Airport Ave north of the development may be required at developer expense to indicate the 90° roadway curve at Ashland Ave (W1-1L w/ advisory speed plaque or similar). 5. A pedestrian crossing to Vallivue Middle School should be provided at one of the driveway approaches to the school on 10th Avenue. The existing mid-block pedestrian crossing at David Ave should be abandoned, as it does not connect to any pedestrian pathways or sidewalks on the school property, and forces pedestrians to use the 10th Ave roadway Page 2 of 2 shoulder. A sidewalk or pathway on the 10th Ave frontage of the development should extend to and connect with David Street to accommodate pedestrian movements from existing subdivisions to the south. The MUTCD recommends development of a pedestrian access plan (Section 7) to promo 6. The development subject property accepts a significant volume of stormwater runoff from the Stecher and Somerset West subdivisions to the south. These include, but are not limited to the David Street, Airport Ave, Horizon Ave, Kimball Ave, Susan Ave, and 10th Ave rights-of-way, and much of the lot area within the subdivisions. At the time these developments were platted and constructed (prior to the existence of the highway district), Canyon County made no provisions for detention or retention of stormwater. The Element Ridge development should, at a minimum, provide for facilities necessary for pass-through and attenuation of this runoff. 7. HD4 requests that the City include as part of any development agreement for the project a clause requiring dedication of public right-of-way for 10th Avenue (or for any existing public street) upon written request of the City, to facilitate construction of public roadway improvements independent of the timing of the proposed development. 8. The development is expected to generate approximately 1,697 daily vehicle trips, with 169 trips anticipated in the PM peak hour. These new trips will have a significant impact on the operations and capacity of the nearby roadway network. The City should, through exactions or other fees, determine and require a proportionate share of the costs necessary to improve capacity at local intersections affected by new traffic from the development. 9. Due to the impacts from this development and other growth within the City, HD4 will request that the city accept for maintenance 10th Avenue between SH 55 (Karcher Rd) and Homedale Rd, including the public road intersections within those limits. This will best allow the city to oversee approval of improvement plans (including utility extensions and traffic safety or capacity projects) affecting these roadways, and remove an overlapping and unnecessary layer of permitting and inspection by the highway district. Highway District No. 4 appreciates the opportunity to review this development application, and requests that the Commission and Council consider these comments in their deliberations and condition and approval to address the recommendations provided above. Please feel free to contact me with any questions on these comments. Respectfully, Chris Hopper, P.E. District Engineer CC: Robb MacDonald, P.E. Caldwell City Engineer File: Caldwell_10th Avenue- Element Ridge Subdivision