Loading...
HomeMy WebLinkAboutHD4_FarmwayCrossing_V1 Page 1 of 2 October 16, 2024 City of Caldwell Planning & Zoning Commission and City Council 621 Cleveland Blvd Caldwell, Idaho 83605 RE: ANN24-00010/SPP24-0001 Farmway Crossing Subdivision Canyon Co Parcel R32599 aka 4202 Farmway Road Farmway Rd & Ustick Rd Frontage Dear Council Members and Commissioners: Highway District No. 4 (HD4) has reviewed the application for annexation and preliminary plat for Farmway Crossing Subdivision, approximately 44.5 acres located at the southwest corner of Farmway Rd and Ustick Rd. The development is proposing approximately 115 new single family homes. HD4 provides the following comments on the proposed development: 1. By agreement with the City, (Exchange Maintenance Agreement, 2008) HD4 operates and Farmway Rd and Ustick Rd along the east and north boundaries of the subject property. Under this agreement, HD4 is responsible for access permitting and utility permitting along these highways, and is provided opportunity to review and comment on development plans as they may impact the operation and maintenance of the highway. 2. Farmway Rd and Ustick Rd are both classified as principal arterials on the functional classification maps adopted by HD4 and the City. Direct driveway or local or private street access is typically restricted to support higher traffic volumes and speeds along these corridors. The proposed Silver King Way access to Ustick Rd (+/- 800-ft west of Farmway Rd) appears to meet city standards for access spacing to an arterial roadway. The proposed right-in-right-out Cloud Nine St access to Farmway Rd is generally consistent with the Farmway Rd Corridor Study (2022). 3. HD4 requests that the City include as part of any development agreement for the project a clause requiring dedication of public right-of-way for Farmway Road and Ustick Road upon written request of the City, to facilitate construction of public roadway improvements independent of the timing of the proposed development. This right-of-way should include that necessary for construction of a multi-lane roundabout at the Farmway/Ustick intersection. 4. The development is expected to generate approximately 1,100 daily vehicle trips, with 110 trips anticipated in the PM peak hour. These new trips will have a significant impact on the operations and capacity of the nearby roadway network. The City should, through exactions or other fees, determine and require a proportionate share of the costs necessary to improve capacity at local intersections affected by new traffic from the development. Page 2 of 2 5. Due to the impacts from this development and other growth within the City, HD4 requests that the city accept for maintenance Farmway Road between SH 19 (Simplot Blvd) and Homedale Rd, including the public road intersections within those limits. This will best allow the city to oversee approval of improvement plans (including utility extensions and traffic safety or capacity projects) affecting these roadways, and remove an overlapping and unnecessary layer of permitting and inspection by the highway district. Highway District No. 4 appreciates the opportunity to review this development application, and requests that the Commission and Council consider these comments in their deliberations. Please feel free to contact me with any questions on these comments. Respectfully, Chris Hopper, P.E. District Engineer CC: Robb MacDonald, P.E. Caldwell City Engineer File: Caldwell_Farmway Rd- Farmway Crossing Sub