HomeMy WebLinkAboutPhasePlan_Hemlock_V1 Hemlock Developers, LLC 17848 Middleton Road Caldwell, ID 83687 Phone - 208-515-4442 email - doug@ustickstorage.com August, 24, 2022 City of Caldwell 621 Cleveland Blvd. Caldwell, ID 83605 Attn: Prelim Plat Committee Re: Phase Plan - Development of Parcel 3 Dear Prelim Plat Committee, the purpose of this document is to provide a Phase Plan with respect to Hemlock Developers, LLC platting and development of Parcel 3 (Parcel R3087701600). This Parcel 3 development, total acreage of 7.799 acres, will consist of 3 Commercial Lots with Lot 1 being Middleton Retail Center, 1.192 acres, Lot 2 being Office Flex Space, 4.153 acres, and Lot 3 being Enclosed RV Storage, 2.454 acres. Based on projected development, here is a Phase Plan for the City of Caldwell. Note, based on economics, availability of materials, efficiency in pricing to develop partial lots or more at a specific time, this Phase Plan “may be” altered at the developers discretion, but in any event, here is the most conservative plan so that the City of Caldwell is properly informed pertaining to Hemlock Developers approvals for development. Based on the Phase Plan below, the “Confirmed to be Done” items will for sure happen at once in entirety during that particular phase. The “Add-on Options to be Done” are various scenarios that could be done, and note the multiple Add-on Options to be Done listed below does Not assume that they all will be done together at once, but perhaps one or more of these options could be done within that particular development phase. 1. Phase 1: a. Confirmed to be Done - All civil related flat work specific to Lot 3 and Lot 1 b. Add-on Option to be Done - Civil Flat work for Lot 2 c. Add-on Option to be Done - Build Vertical Lot 1 and half of Lot 3 d. Add-on Option to be Done - Build Vertical Lot 1 and All of Lot 3 e. Add-on Option to be Done - Build Vertical half of Lot 3 f. Add-on Option to be Done - Build Vertical Lot 3 in Entirety 2. Phase 2: g. Confirmed to be Done - Build Vertical half of Lot 3 h. Add-on Option to be Done - Civil Flat work for Lot 2 i. Add-on Option to be Done - Build Vertical Lot 1 j. Add-on Option to be Done - Build Vertical remaining half of Lot 3 k. Add-on Option to be Done - Build Vertical Lot 1 and remaining half of Lot 3 l. Add-on Option to be Done - Build Vertical Lot 1, remaining half of Lot 3, Civil Flat work for Lot 2 m. Add-on Option to be Done - Build Vertical Lot 1, remaining half of Lot 3, Civil Flat work for Lot 2, build half of Lot 2 3. Phase 3: n. Confirmed to be Done - Build Vertical remaining half of Lot 3 and all of Lot 1 o. Add-on Option to be Done - Civil Flat work for Lot 2 p. Add-on Option to be Done - Civil Flat work for Lot 2 and Build Vertical half of Lot 2 4. Phase 4: q. Confirmed to be Done - All civil related flat work specific to Lot 2 r. Add-on Option to be Done - Build Vertical half of Lot 2 s. Add-on Option to be Done - Build Vertical all of Lot 2 5. Phase 5: t. Confirmed to be Done - Build Vertical half of Lot 2 u. Add-on Option to be Done - Build Vertical remaining half of Lot 2 6. Phase 6: v. Confirmed to be Done - Build Vertical Remaining half of Lot 2 Sincerely, Doug Corsmeier, Owner Hemlock Developers, LLC