Loading...
HomeMy WebLinkAbout2017Debbie Geyer From: Robb MacDonald Sent: Tuesday, June 13, 2017 5:03 PM To: Debbie Geyer; Angie Point Cc: Brent Orton Subject: RE: Voice message from WIRELESS CALLER Debbie, They are doing another round of informational leaflets for all the area around the 101" ave bridge. I told them we wanted a message in English on one side and Spanish on the reverse side. I will send you a copy of one once I get one. i oMW From: Debbie Geyer Sent: Monday, May 22, 2017 7:17 PM To: Angie Point Cc: Robb MacDonald; Brent Orton Subject: Fwd: Voice message from WIRELESS CALLER Angie. Kudos to you for posting an item about I-84. Great job. Citizen was appreciative. Robb and Brent. Maybe we should consider this as the mode for announcements about the loth Avenue bridge. Spanish as well? Sent from my iPhone Begin forwarded message: From: WIRELESS CALLER <donotreply cnr cityofcaldwell.org Date: May 22, 2017 at 8:42:50 PM GMT-4 To: <dg_eyer@cityofcaldwell.org> Subject: Voice message from WIRELESS CALLER Caller ld: 2084470668 Message length: 26 s. (212 kb.) 0Wpm—OPM r. 1 0 PLACEMENT PROJE Construction of the new 10th Auenue bridge is scheduled for early 2018. The new bridge will include: • 4 lanes (12 foot lanes) and 6.5 foot shoulders • Sidewalks/pathway and bridge railing • Lighting • Decorative Arch • Indian Creek connectivity via a pedestrian underpass (under bridge) Lo construccio'n del puente nueuo de to ouenida 10 empezora temprono en el ano 2018. El puente nueuo k inctuira: • 4 carriles (carriles de 12 pies) y los arcenes de 6.5 pies. o xo • Las aceras y las barandillas del puente • La iluminacion •hox Y • Un arco decorative Your Safety . Your Mobility • Un puente para los peatones debajo del puente. Your Economic Opportunity To see design plans, detour routes and construction schedule, visit the web site or call T.J. Frans at (208) 455-3006. Para ver los planes de diseno, las rutas alternativas y el horario para construcci6n, visite el sitio web o flame T.J.Frans (208) 455-3006. oaxe �hox Your Safety • Your Mobility Your Economic Opportunity PO Box 7129 Boise, ID 83707-1129 1 "II'll'1'li'f'Illlllillifiifli15flllilllflilfl1RI11lIllllll 00108RRRR3 7 ►RRFr*****-"EC—WSS*R-00 RESIDENT 2-22215 WASHINGTON AVE CALDWELL ID 83605-5347 The 10th Avenue Bridge over Indian Creek was constructed in 1956 out of railroad flatbed car frames. With the help of federal funding, the City of Caldwell has designed a new bridge and will begin construction in early 2018. The entire project is expected to cost $2.2 million. For more information, visit the web site or call T.J. Frans at (208) 455-3006. Presort 5td U5 Postage Paid Boise, ID Permit# 679 El puente de la avenida 10 arriba de Indian Creek fue construido en 1956 y fue hecho de las estructuras de las plataformas de los ferrocarriles. Con la ayuda de la financiaci6n federal, la ciudad de Caldwell he disenado un puente nuevo y la construction empezara temprano en el aho 2018. El proyecto entero se espera costar $1.7 millones. Para mas information, visiteel sitio web o Ilame T. J. Frans (208) 455-3006.