Loading...
HomeMy WebLinkAboutNarrative_ValvolineInstantOilChange_V1November 12, 2024 | Page 1 November 12, 2024 April Cabello, Planner I City of Caldwell 205 S 6th Ave. 2nd Floor Caldwell, ID 83605 Re: Administrative Determination for Parking Reduction Valvoline: 504 N 21st Ave, Caldwell ID Dear Ms. Cabello: On behalf of Valvoline, LLC, please accept this project narrative and the enclosed supplemental materials as Valvoline’s application and request for your review and approval of a proposed Administrative Determination for parking reduction of the Valvoline Instant Oil Change located at 504 N 21st Ave, Caldwell, ID. Valvoline’s operations and customer service are built on maximizing customer comfort and efficiency. Valvoline’s mission to “provide quick, easy, trusted oil changes and preventive maintenance with speed and precision and get customers back on the road quickly and safely” has led to the success of the company since 1986. Today, Valvoline owns and operates more than 1700 stay-in-your-car oil change locations, and more than 700 franchises locations in the United States and Canada. The proposed Valvoline Instant Oil Change would be constructed on a currently vacant pad site within an existing development. Valvoline’s pad is anticipated to be approximately 1.20 acre and the building will have a 1,664 sf footprint with a 1,498 sf basement and will provide two services bays for oil change and service as well as a small customer waiting area, restroom, office, and ancillary spaces. Valvoline would provide 8 parking stalls, including one (1) ADA stall. The site will provide 8 parking spaces which meets the parking demand requirement for the gross floor area, as described below. Valvoline’s operations require customers to stay in their vehicles during the entirety of service, watching technicians on a computer screen. Payment is also made thru this computer, completing the entire service process in as little as 15 minutes. Therefore, parking is primarily for employees and the occasionally guest. The new oil change facility in will employ up to two service providers per bay, plus two additional customer service employees at full capacity. Based on Valvoline’s business model, this is how they calculate their parking space needs. Per the zoning code, a minimum of 6 parking stalls are required, and Valvoline is proposing 8 stalls. The traffic generated by the proposed use will not unduly burden the traffic circulation in the vicinity. November 12, 2024| Page 2 Valvoline is categorized as low traffic with typical 16 peak trips per day, 6 in the morning hours and 10 in the evening. Analysis results will conclude this development is not expected to negatively impact the adjacent roadway network. Due to general parking configuration, as well as number of que spots available relative to expected number of cars, there will not be a backup of vehicles into the adjacent roadway. Most of the use’s activities occur indoors and the use of the parking and loading areas will not increase at any one time due to scheduling. In summary, Valvoline has configured a parking lot for customers and employees that more than adequately meets operational needs and city requirements. Sincerely, LeAmber Yisrael