Tuscan Ridge Subdivision
SUB24-000029
Page 1 of 9
Memorandum
To: Alex Jones, Associate Planner
Caldwell P & Z Department
From: TJ Frans, Project Manager
Steven Pendleton, Plans Examiner II
Re: SUB24-000029: Tuscan Ridge Subdivision
Date: September 17, 2024
The Engineering Department provides the following comments on a request by Becky
Yzaguirre, on behalf of Seddie Caldwell II, LLC, is requesting preliminary plat approval for a
single-family residential subdivision with a density of 2.70 dwelling units per acre. The
development is proposed to include 212 single-family lots and 38 common lots with a total of
16.27 or 20.7 percent open space, with 9.21 acres or 11/7% of qualified open space. The
minimum lot size is 7,929 SF, with an average lot size of 8,848 SF and a maximum lot size of
15,563 SF. The proposed site is addressed as 0 Indiana Avenue (R3298101000) and is located
on the southeast corner of Orchard Avenue and Indiana Avenue in Caldwell, Idaho.
Should the Hearing Examiner/Planning & Zoning Commission advance the application,
the Engineering Dept. recommends the following items, as listed in the staff report, be
listed as conditions of approval:
• Right-of-Way Section, #6 for the proposed Tuscan Ridge Dr. roadway internal to the site
shall provide full width right-of-way (ROW) plus the width of any proposed center planter
islands the entire length of roadway. Applicant shall provide a minimum of 3’ of ROW
back of sidewalk and to be constructed to meet the minimum asphalt width requirements
per drive lane Per Standard Detail R-810E. All center islands are to have their own lot
and block number and be maintained by the HOA..
Development Plans
1. Development Plans – Prior to commencing construction and applying for building permits,
plans must be prepared by the developer’s engineer and approved by the City Engineering
Department which shall include the following items:
a. Street section and alignment (including curb and gutter);
b. Sidewalk (sidewalk width based on street classification);
c. Sanitary sewer (per City and DEQ requirements);
Tuscan Ridge Subdivision
SUB24-000029
Page 2 of 9
d. Potable water (per City and DEQ requirements);
e. Stormwater facilities (per City requirements/storm water manual);
f. Street lighting (per City standards);
g. Street signage (per City and MUTCD requirements);
h. Vertical Datum based on NAVD 88 Datum.
General
1. Applicant shall follow the requirements and processes of the subdivision ordinance for the
development of this project. For the purposes of this project, all conditions outlined in the
subdivision ordinance pertaining to receiving the City Engineers signature on, or the
recordation of, a final plat shall be applied to the submission of building permits.
2. Easements for public utilities shall be as listed below. Easements will be required to be larger if
deemed necessary by the City Engineer in order to facilitate future maintenance operations of
utilities.
a. 10 feet wide minimum.
b. Domestic water only,15 feet wide minimum
c. Sanitary sewer only, 20 feet wide minimum
d. Sewer and water combined, 30 feet wide minimum
3. Appropriate easements for emergency access, transmission lines and/or other utilities shall be
clearly indicated, with recorded instrument numbers provided for said easements, on the
construction drawings.
4. All utilities on and within the boundaries of the subdivision shall be located and/or relocated
underground.
5. All street, sewer, water, fire protection, and street light facilities must be dedicated to the City.
Some conveyance facilities for stormwater drainage may be eligible for dedication to the City.
6. Construction of facilities to be dedicated and/or within public right-of-way shall be performed by
an appropriately licensed public works contractor and shall be inspected by and constructed to
City of Caldwell specifications.
7. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre-construction
conference scheduled by the engineer of record in which all appropriate personnel and utilities
are present. Appropriate City personnel are to be notified in advance of all testing (including
compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of
Tuscan Ridge Subdivision
SUB24-000029
Page 3 of 9
the testing. The engineer of record or his designated representative is to witness all tests (not
covered by City inspectors) and a log of inspection visits and testing results is to be kept by the
engineer of record or his representative.
8. The developer is to employ a responsible design professional, preferably the engineer of
record, to oversee and inspect construction, to perform and/or observe all requisite testing of
completed facilities, and to certify that improvements have been constructed according to
approved plans and in compliance with applicable City, State, and Federal standards.
9. The engineer of record shall be held responsible to ensure that improvements are in
compliance with said engineer’s design. Following the construction of the improvements, the
developers engineer shall provide the City of Caldwell Engineering Department with electronic
(.dwg) format record drawings spatially referenced to the Idaho State Plane Coordinate
System-West Zone, North America Datum (NAD) 83. Vertical control shall be referenced to the
North America Datum (NAVD) 88 for future reference and to establish that the engineer of
record has caused construction to occur in substantial compliance with the design of said
engineer of record.
10. Any note, item or drawing element on the plats, construction drawings, engineering drawings
and/or design drawings related to the property inconsistent with City Codes, Policies and/or
Ordinances shall not be construed as approved unless specifically addressed and granted by
City Council.
Rights-of-Way
1. S. Indiana Ave. is classified as a Collector roadway. The applicant shall dedicate as public
right-of-way a minimum thirty-five (35’) foot half width right-of-way (from centerline) along the
entire S. Indiana Ave. alignment (per City Standard R-810C).
2. Orchard Ave. is classified as a Minor Arterial roadway. The applicant shall dedicate as public
right-of-way a minimum forty (40’) foot half width right-of-way (from centerline) along the entire
Orchard Ave. alignment (per City Standard R-810B).
3. Smith Ave. proposed Master Planned roadway located on the south boundary of this
development is classified as a Collector roadway. The applicant shall dedicate as public right-
of-way a minimum thirty-five (35’) foot half width right-of-way (from centerline) along the entire
Smith Ave. alignment (per City Standard R-810C).
4. Applicant shall provide necessary right-of-way on Smith Ave. at the intersection of S. Indiana
Ave. to construct a westbound right-hand turn lane.
5. Applicant shall provide necessary right-of-way on S. Indiana Ave. at the intersection of Orchard
Ave. to construct a northbound right-hand turn lane.
6. All interior local streets classified as residential shall be dedicated to the City. The applicant shall
dedicate as public right-of-way a minimum fifty-three (53) foot full width right-of-way (per City
Standard R-810 E).
Tuscan Ridge Subdivision
SUB24-000029
Page 4 of 9
7. Applicant shall dedicate to the City of Caldwell any required right-of-way along S. Indiana Ave.
Orchard Ave. or Smith Ave. within 90 days of written request from the City of Caldwell
8. A note shall be placed on the Final Plat indicating that all rights-of-way are to be dedicated to
the public.
Street
1. Full frontage half street improvements shall be completed to all classified roads adjacent to the
proposed project including (S. Indiana Ave., Orchard Ave. and Smith Ave.) in accordance with
all City of Caldwell standards and specifications improvements shall include (but are not limited
to) curb, gutter, sidewalk, asphalt, streetlights, joint trench, spare communication conduit along
classified roadways, storm drainage facilities, etc.
2. All private driveways/drive isles shall fully comply with City of Caldwell standards and be
approved by the Caldwell Fire Marshall.
3. Applicant shall construct a northbound right-turn lane on S. Indiana Ave. at the intersection of
Orchard Ave.
4. Applicant shall construct a westbound Left turn lane on Orchard Ave. at the intersection of S.
Indiana Ave.
5. Applicant shall construct a southbound left turn lane at the intersection of S. Indiana Ave. and
proposed Tuscan Ridge Dr.
6. Applicant shall construct a westbound right-turn lane on Smith Ave. at the intersection of S.
Indiana Ave.
7. No lot/building shall have direct access to/from S. Indiana Ave., Orchard Ave. or Smith Ave.
8. Applicant shall be responsible to construct the south ½ share of the bridge structure and
surface improvements of the Deer Flat Canal and Forest Canal at the Orchard Ave. alignment.
9. Applicant shall coordinate with the United States Postal System to determine a cluster mailbox
unit location. Said location shall be interior to the site and shall be located in a manner that will
not impact, or cause queueing onto, S. Indiana Ave., Orchard Ave. or Smith Ave.
Outparcels
1. 14838 S. Indiana Ave. (R3298100000)
a. If the City is able to obtain sufficient right-of-way along the frontage of this out parcel
located on the west side of the development the applicant shall complete the road
widening improvements referenced in the Street section, item 1, across the S.
Indiana Ave. frontage of said out parcel. If the City is not able to acquire the right-of-
way, lesser improvements may still be required that fall within the prescriptive right-
of-way on those out parcels.
Tuscan Ridge Subdivision
SUB24-000029
Page 5 of 9
b. Applicant shall provide services to the outparcel to include a sewer stub, pressure
irrigation service and domestic water meter.
2. 0 S. Indiana Ave. (R32981010C0)
a. If the City is able to obtain sufficient right-of-way along the frontage of this out parcel
located on the west side of the development the applicant shall complete the road
widening improvements referenced in the Street section, item 1, across the S.
Indiana Ave. frontage of said out parcel. If the City is not able to acquire the right-of-
way, lesser improvements may still be required that fall within the prescriptive right-
of-way on those out parcels.
b. Applicant shall provide services to the outparcel to include a sewer stub, pressure
irrigation service and domestic water meter.
Traffic Mitigation
The following are the required traffic related mitigation measures for the Tuscan Ridge
Subdivision resulting from the traffic impact study pursuant to City Code Chapter 10, Article 10.
A traffic impact study will be required for this development because of the volume of traffic
produced.
1. Provide a cross-access easement allowing use of approaches and cross-access of the site
by both onsite and adjacent development.
2. Community Planning Association of Southwest Idaho has computed the average trip length
in Canyon County to be 7.3 mi. Traffic impact mitigation should presumably occur at both
trip ends so ½ of the trip length should be attributed to each end. It is estimated that trips will
encounter a major intersection every half mile along any given path. The capacity of an
average fully improved intersection (assumed to be the intersection of a collector and an
arterial road) is estimated to be 5,080 vehicles/hour.
The estimated traffic resulting from the proposed density in this subdivision based on the
most current Traffic Impact Analysis sets the pm peak hour traffic flow at 201 vehicles for
the entire subdivision.
Following the City of Caldwell’s mitigation equation ((201 veh/hr*7.3 mile/trip*0.5 trip
ends*2inter/mi) / (5080veh/hr)) the total contribution of this development to traffic
mitigation shall be 28.9% of a fully improved intersection. This percentage represents
the total capacity utilized from each intersection (once fully improved and possibly
signalized) encountered by trips generated over the development’s half of the generated
trip length.
Tuscan Ridge Subdivision
SUB24-000029
Page 6 of 9
a) The owner/developer/applicant shall design and construct roughly 28.9% of the
signalization improvements needed for an average intersection, as defined, at one or
more nearby (within 3.5 miles of the site) deficient locations to be determined by
Engineering staff. The Engineering staff shall have reasonable discretion to determine
the sites of construction and what design and construction equals roughly 28.9% of the
signalization improvements needed for an average intersection. Engineering staff can
provide information about applications with whose mitigation efforts the
owner/developer/applicant can combine to achieve even units of 100%.
i) The owner/developer/applicant may be allowed, at his option, to contribute monies in
lieu of construction to the City of Caldwell Roadway Trust Fund, but the basis for the
obligation is for construction. Monetary contributions must be made at a level
commensurate with costs to construct the same by the City and as estimated by the
City. This alternate provision for payment of money is not a requirement, is for the
benefit and convenience of the owner/developer/applicant only and does not
constitute an Impact Fee.
ii) The average cost of intersection is estimated at $425,000 for procurement of
design services, construction, and associated costs by the City, of which 28.9% of
that cost is what needs to be covered by this subdivision.
Caldwell is currently in the process of adopting a Traffic Impact fee structure to replace traffic
mitigation. Applicant will be required to comply with whichever structure is in place at the time of
final plat signature/certificate of occupancy signature for each particular phase and/or building
permit. Below outlines the current standard for traffic mitigation fees. Applicant will be required
to pay Traffic Impact fees as outlined above if they’ve been adopted by the time frames
aforementioned. Mitigation or Impact fees will be collected for each phase of development
and/or certificate of occupancy requested/issued, not both.
Water
1. All on site water mains will need to be looped into existing mains for fire flow and water quality
purposes. Internal main sizing and construction plan approval, will be dependent upon the
availability of fire flow.
a. Currently this development resides within water pressure zones 3 and 4 and the
redundant/secondary supply will need to be independent of their respective
zones to be determined at time of plan review.
City of Caldwell Public Works Department has reviewed the recently adopted Caldwell
Water Facility Plan System and determined that certain shortfalls exist in water pressure
zones 3 and 4. While these shortfalls are being remediated, the Engineering Department
will allow the property to proceed with Preliminary Plat and the construction of onsite
infrastructure, but reserves the right to hold any phase of final plat and associated
building permits until adequate water is obtained within the affected zone. The applicant is
encouraged to work closely with the Engineering Department to determine potential
construction timing and impacts.
Tuscan Ridge Subdivision
SUB24-000029
Page 7 of 9
2. Each buildable lot shall be supplied with potable water. If buildings are constructed to include
individual units that could feasibly or will be sold separately, each unit shall be serviced
separately
3. Each phase of development shall have a redundant/secondary supply of domestic water.
a. Currently this development resides within water pressure zones 3 and 4 and the
looping of internal line will need to be independent of their respective zones to be
determined at time of plan review.
4. The location of water service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans.
This development will be required to comply with the Water Master Plan.
5. Applicant shall construct a 12” water mainline in Orchard Ave. and Smith Ave. through the
entire length of the project frontage.
6. Any existing wells that reside on this site shall be abandoned per IDWR requirements and
documentation provided to the City Prior to Final Plat signature.
Sanitary Sewer
1. It shall be the responsibility of the applicant’s engineer to verify that connection to existing sewer
mainlines will not exceed the functional capacity of said mainlines. Provision for connectivity by
future developments shall be met in accordance with current City standards.
2. The location of sewer service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans. This
development will be required to install the trunk lines specified within the most current version of
the Caldwell Collection Sewer Master Plan that reside within the limits of this preliminary plat.
a. If a sewer study has not been completed for this project to be serviced through Sienna
Hills Subdivision located on the north side of Orchard Ave. it shall be completed and
reviewed by the City prior to Civil Construction Drawing submittal for serviceability in
the current trunk lines.
3. The Developer will be required (where applicable) to extend all sewer and water mainlines to the
center of adjacent roadways for connectivity by future developments. Locations of said
extensions will be decided during the review of the improvement plans.
4. Each buildable lot shall be supplied with a sewer service. If buildings are constructed to include
individual units that could feasibly or will be sold separately, each unit shall be serviced separately
5. Any easements for sewer lines not in the right-of-way should be at a width sufficient to construct
same and not less than 20 feet in width. Easements for adjacent sewer and water lines not in the
Tuscan Ridge Subdivision
SUB24-000029
Page 8 of 9
right-of-way shall be at a width sufficient to construct the same and shall be no less than 30 feet
in width.
6. A 20’ wide all-weather surfaces may be required to be constructed over mainlines that fall outside
the public right-of-way. All weather surfaces shall be constructed sufficiently to support heavy
equipment necessary to construct and maintain sewer under all seasonal weather conditions.
Irrigation
1. Existing easements and/or right-of-ways for any irrigation facility shall be determined and
clearly indicated on the construction plans. Construction across or re-routing of these facilities
is subject to approval by the governing irrigation district and at their discretion or their assigns.
2. The Developer shall maintain any existing upstream drainage rights and downstream irrigation
rights across the property. During the design phase of this project, the developer or his
engineer is to contact the appropriate irrigation district to help ascertain these rights.
Appropriate facilities shall be provided by the developer to convey irrigation and drainage water
across the property to take care of these offsite needs. There is to be no discharge of
gravity/pressure irrigation return water into the projects storm water system.
2. The development is to include a non-potable water pressure irrigation system. The design of
this pressure irrigation system is to be reviewed and approved by the Caldwell Municipal
Irrigation District prior to construction plan approval. It shall be required that the system will be
operated and maintained by the Caldwell Municipal Irrigation District.
3. Each lot, or building area, shall be provided with a pressure irrigation service in compliance with
Caldwell Municipal Irrigation District standards.
4. All pressure irrigation mainlines shall be located in the public right-of-way or within a public
utility easement, with a minimum width of 10 feet, centered over said mainlines as per current
City standards.
5. Applicant shall place the pump station in an area that is easily accessible with a recorded
perpetual easement sufficient for convenient access and maintenance of said pump station.
The lot shall be owned and maintained by the home owners association.
6. The applicant shall ensure that an adequate continuous irrigation supply flow is available to
meet the pressure irrigation system requirements of CMID.
7. The applicant shall transfer a proportionate share of any existing water right(s), except those
held in trust by an irrigation district, to the City of Caldwell for both irrigation and domestic water
supply for the subject development. If this should occur, The City shall assist in registering the
transfer.
8. Applicant shall pipe the pump station delivery ditch from the source point (head gate) to the
pump station. Pump station overflow shall be piped from the pump station to the point of
discharge into an irrigation facility/canal/drain/etc. maintained by an irrigation district.
Tuscan Ridge Subdivision
SUB24-000029
Page 9 of 9
9. Upon Applicants connection to or use of the existing irrigation pump station, should they
choose to do so and CMID deems it appropriate to connect to, the applicant shall:
a) Supply the City of Caldwell with a water model of the whole pressurized irrigation
system including the piped overflow showing the system design meets all Caldwell
Municipal Irrigation District standards.
b) Applicant shall complete all upgrades to the system as required by CMID. Said
upgrades will be determined during plan review”
10. All plans and construction drawings submitted to the City of Caldwell for review and approval
for any out-of-season irrigation work to be performed within or across facilities located within (or
owned by) irrigation districts other than CMID shall be submitted to the Caldwell Engineering
Department no later than August 15th. Submittal of plans after this date may result in Applicant
not receiving plan approval in time to complete out-of-season work.
Storm Drain
1. As noted previously, provision is to be made for the disposal of stormwater drainage in
accordance with the City Stormwater Management Manual and any updates adopted
subsequent to this application. A copy of this policy is available upon request. The engineer of
record is to provide calculations, which indicate that the assumptions in his stormwater
drainage plan comply with the requirements of the stormwater manual. In this case, if a storm
water system is existing, the burden of proof is on the developer to verify the capacity is
sufficient for the proposed development.
2. The applicant shall identify and retain all historical drainage discharge points from the property
for the purpose of draining on-site storm water detention facilities.
3. Storm water detention basins are required to remain on-site and are to be operated and
maintained by the Home/Business Owners Association/etc.
4. There is to be no discharge of storm water overflow into any irrigation water return/discharge
facility/ditch/pipe/etc.
Building Permits
1. Prior to submission of building permits, public utilities and infrastructure must be completed or
an appropriate construction security provided. A 20% temporary restriction in the issuance of
building permits will be enforced until all utility construction has been completed, inspected,
tested, approved by the City and certified by the Applicants engineer; including completion all
punch list items.
2. Applicant shall submit an electronic (dwg.) copy of the project site plan suitable for mapping
and addressing purposes no later than 30 days prior to submission of the first building permit.