HomeMy WebLinkAboutLP-102 ENLARGED PLANTING PLAN30.00'(5) GB(1) MRR(3) RCC(2) BDP(3) AME(6) PVH(1) JB(1) RAG(1) VTA(3) PNA(3) JB(3) RCC(3) RG(3) AME(3) MRR(12) BDP(7) AME(10) RCC(2) VTA(4) POT(6) PVH(6) RFF(4) RF(1) PNA(4) RG(3) MRR(3) GB(3) BC(3) JB(2) RAG (3) VTA(3) RCC(3) PNA(1) LTE(6) PVH(3) RG(3) AME(3) BDP(1) RAG(1) VTALAKE AVENUE30.00'(12) BDP(7) AME(10) RCC(4) POT(2) VTA(6) PVH(4) RG(6) RFF(4) RF(1) PNA(3) MRR(3) MRR(3) GB(12) BDP(5) AME(10) RCC(4) POT(2) VTA(7) PVH(4) RG(4) RG(1) PNA(6) RFFDECATUR STREET
PEREGRINE
ESTATES NO.
6LAKE AVENUE10-22-063_LP-101X\\JUB.COM\CENTRAL\CLIENTS\ID\TRILOGY\PROJECTS\10-22-063_PEREGRINE7\CAD\SHEET\10-22-063_LP-101X.DWGPlot Date:6/13/2023 12:43 PM Plotted By: Shawn WilsonDate Created:6/13/2023
LAST UPDATED: 6/13/2023PEREGRINE ESTATES SUBDIVISION NO. 7CALDWELL, IDAHO
LAKE AVENUE PLANTING PLAN10-21-077SEWSEWSEW/AJNLP-102DESIGN BY:DRAWN BY:CHECKED BY:BY APR.DATESHEET NUMBER:DESCRIPTION
REUSE OF DRAWINGS
J-U-B SHALL RETAIN ALL COMMON LAW, STATUTORY, COPYRIGHT AND
OTHER RESERVED RIGHTS OF THESE DRAWINGS, AND THE SAME
SHALL NOT BE REUSED WITHOUT J-U-B'S PRIOR WRITTEN CONSENT.
ANY REUSE WITHOUT WRITTEN CONSENT BY J-U-B WILL BE AT CLIENT'S
SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO J-U-B.
NO.
REVISIONJUB PROJ. # :INCH, SCALE ACCORDINGLYAT FULL SIZE, IF NOT ONEONE INCHFILE :J-U-B ENGINEERS, INC.Meridian, ID 83642
Suite 400
J-U-B ENGINEERS, INC.
www.jub.com
Phone: 208.376.7330 J-U-B ENGINEERS, INC.DESIGN BY:DRAWN BY:CHECKED BY:BY APR.DATESHEET NUMBER:DESCRIPTION
REUSE OF DRAWINGS
J-U-B SHALL RETAIN ALL COMMON LAW, STATUTORY, COPYRIGHT AND
OTHER RESERVED RIGHTS OF THESE DRAWINGS, AND THE SAME
SHALL NOT BE REUSED WITHOUT J-U-B'S PRIOR WRITTEN CONSENT.
ANY REUSE WITHOUT WRITTEN CONSENT BY J-U-B WILL BE AT CLIENT'S
SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO J-U-B.
NO.
REVISIONJUB PROJ. # :INCH, SCALE ACCORDINGLYAT FULL SIZE, IF NOT ONEONE INCHFILE :J-U-B ENGINEERS, INC.2760 W. Excursion LN.J-U-B ENGINEERS, INC.20040SCALE IN FEETN
CALL 2 BUSINESS DAYS INADVANCE BEFORE YOU DIG,GRADE, OR EXCAVATE FOR THEMARKING OF UNDERGROUNDMEMBER UTILITIES Call before you dig.Know what's below.R 6' FENCECOORDINATE TRANSITIONLANDSCAPE FROM PHASE 6TO PHASE 7GRAYED BACK LANDSCAPEIS PART OF PEREGRINEPHASE 6, TYP.PHASE 6,6' FENCE6" SQUARE CONCRETEMOWCURBING, TYP.6" SQUARE CONCRETEMOWCURBING, TYP.MATCH LINE 'A'
MATCH LINE 'A'6' FENCE6' FENCE6' FENCE6' FENCELINE DENOTE STREET BUFFER PLANTQUANTITIES BETWEEN LAKE AVE. ANDCIRRUS DRIVE. SEE LS002CIRRUS DRIVE