HomeMy WebLinkAbout200 Lateral Caldwell Comment Letter - Bailey Engineering 1119 E. State Street, Suite 210  Eagle, Idaho 83616  Tel.: (208) 938-0013 TO: Steve Pendleton City of Caldwell Engineering Department 621 Cleveland Blvd. Caldwell, ID 83605 DATE: November 17, 2023 PROJECT: Valencia Village – 200 Lateral Tiling (BEI Project No. C2021-010) Steve, We have received the City’s comments regarding the 200 Lateral Tiling at Valencia Village, dated 09/26/2023. We’ve revised the plans to meet the City of Caldwell requirements as follows: 1. Sheet C-2: a. The sleeves for the water main in Middleton Road have been upsized to accommodate an 18” water main. b. The storm drain main over the Noble Drain has been sleeved. Sleeve notes/details will be found on the Noble Drain & Valencia Village No. 2 plans as those are completed. c. The sleeve detail has been revised to include a sleeve for an 18” main. 2. Sheet C-3 – The island in Red Eagle has been removed. The common lot that contains the 200 Lateral does not have a blanket utility easement, only a 10’ easement where needed for Joint Trench facilities. Preliminary maps are attached. 3. Sheet C-4 – See response to item 3 above. 4. Sheet C-5: a. Pathways within the easement have been removed at Pioneer’s request. b. A driveway approach for Skyway is called out on sheet 4.1 on the Valencia 1 plans. c. The slope shown on the existing pipe under Skyway is based on information from our surveyor. Slopes have not been revised. A note has been added to verify the existing slope & match. 5. Other items requested by Pioneer: a. A number of in-line boxes have been removed. b. An additional headgate has been provided at the north end of the site. Attached are revised plans for your review. If you have any questions or comments regarding this matter, please contact me at jduncan@baileyengineers.com. Sincerely, Jonah Duncan, P.E. cc: Project #C2021-010 Mike Hickman, Keller Associates