HomeMy WebLinkAboutCA-108-07 David Markowski 1323 Everett StHISTORICAL DISTRICT
SUMBITTED BYDATEITEM
mGd Ftur\cuptYx-\\-1-o-lHD-l Application
I{D,-z Narrative
IID-3 Pictures of Site
IID-4 Public Notice
l\"'7a-51HD-5 Agenda ll^ 76 q
HD-6 Sample of material
1\- \q-Ul WRrdatlLIID-7 Certificate of Appropriateness
&w'\-^_s[-]t- r3IID-8 Meeting minutes t(^ Lro-{
t
Cr<*'
B-R837454{7 t{a-o.t-R cdml.tod Ad.cutyRodn!1tr-(,,,)
06!
Daira
lNp.c
Ends
Close
BlucHrEc c
ft|fiI
B-Res-37454*07 EdlModc fti*
Completed
,,,1r:*C'0
Pre'CO lrrue Appovdr
, ,0.lails
l']*i \;\,ti;i::\}
h+l*rcAppwCr -. -
, -.,Qa{tl .t
l-ll! litrrij::rn
Slalu:
Dd":
APFKd,
bgred
Erqras
Conddrd
C.0. hsued
11t7tffi7
llnfm.?
5/5/2qB
11nrN7
Nmrysd@
orcilrn llrpodcdPirl* tl : ,
Frfrcl strps inq! r ll treat!ffi 1 App,or.b I Bcalim I cdm| Atadrrrrtr | }taa I
Proioctstrs Frddrrffirt*, -l . "ta* -
PIIB-Res-3?454-07$tmly
Prr{act Smmry
Perm*rypa lGic Tiarffi
orsirir: FI6 lAdd;:mffiffi-A*lca{ /Crtrctr
--g$i:-j |ffiffi,{yffifrilT-
Slatlr
H lB.act3715m7
Proixr
Completed
f,*t*lr "
0m
JN.XJPropdlt
Narcdtd: IB.Bca.3ra5+47
0*laik - "--"
Work ll*c
ocra& Compleled
Actir 11/7/2m?
ComFl6ad
Dot.&
# &l[* "-mseftOdook 4r00rti
Dd*
" -91*--: Completed
Ed[ Mode
JEEJ
Print
BlrcH[a 3r59
Hmcld
Skucru.Ddr& i
0ffi*
BiltroAccart
Dd.ils
[retaltAep{cr*
- D.tals .
, Detcils
cAlDwnllYisroRrcpRESERvATroNdo-rvrrvrrssroN
Monday, November 26, 2007
CALDWELL PUBLIC LIBRARY - Idaho Room
I. Call to Order: 6:00 P.M. by Chair Elaine Carpenter
il. Roll Call Present: Elaine Carpenter Chairman, Jan Boles, Eileen Davidson, Gina
Lujack, Lorene Oates, Chuck Randolph, Anita Shore, and City Staff Brian Billingsley & April
Cabello.
Absent:
Rick Wells.
Ron Blakley, Elaine Leppert, Steve Maughan, and City Council Liaison,
m Approval of Agenda: One addition under Old Business 12 CLG Grant. Motion to
approve as amended Jan B, second Anita S. Motion passed,
ry. Approval of Minutes:
Motion passed.
Motion to approve as submitted, Jan B, second Lorene O
V. Certificate of Appropriateness Interview: First on the agenda was 1609 Blaine
St., an application for a new duplex. Brian B reported that the owners have requested a
continuance to our next meeting, so they can work on the plans to make them more compatible
with the District requirements.
Second application - 1417 Everett St - re-side. Shawn Humberger, owner, after being
sworn, told us he wants to replace the old rotting and cracked wood siding with Alcoa aluminum
siding. He has a proposal from Western Siding. He passed around a sarnple of the siding he
would like to use. After reviewing the map, Chuck R said this house is a contributing structure.
M1. Humberger has lived in this residence for the past 15 years, but does not know any of the
past history. The only exterior that has been done to the house, to his knowledge is the rear deck.
The proposed siding is not something we have approved in the past. Eileen explained to Mr.
Humberger what Hardiplank siding (a fiber cement siding) is and how much of an improvetnent
it would be over the aluminum siding. The siding would increase the value of the house. Elaine
C explained to Mr. Humberger that our goal in the District is to retain as much of the historic
appearance of the houses. Mr. Humberger said he does not intend to re-side the garage at this
time, just paint it. This is the first he had heard of the ltber cement board, so he has not ask for a
bid to do this. He was ready to start with the project immediately, if approved. If not approved
he will explore another avenue. Chuck R. stated he could not vote to approve this type of siding.
He recommended Mr. Humberger check into the fiber cement siding. Chuck R moved we hold
the application over to our next meeting, giving Mr. Humberger time to check prices on the fiber
board or another more time period appropriate siding. Gina L seconded the motion. Gina L ask
if the windows should be done first and then the siding. Mr. Humberger said the windows were
not his top priority. He feels the siding is most important. Motion carried.
rto y
\-/
VI. Audience Participation None.
VII. Actions Since Last Meeting
CA-108-07 - 1323 Everett St - re-roof. When Chuck R discovered this house had the
shingles removed, there was already bales of new shingles on the roof. He checked with the City
and discovered there was no permit. Work was halted. After they brought a sample of the new
shingles, this was approved,
CA-107-07 - 1702 Cleveland Blvd - re-roof garage. This houselgarage has been before
us in the past. There was some work done on the house, but it sat for a long time. They took the
shingles off the garage and papered it, but went no fuither. The paper is coming off. They have
been notified that they need to get a different type of shingles than they intended to use. So far
they nave not called back.
CA-106-07 - 1816 Blaine St - Lorene O said they have shingles and they are the
architectural shingles. They claim to have a Certificate of Appropriateness. Brian B confirm that
they have the certificate.
V[I. Old Business
1. The Hat - Jan gave us the sad news that we were rejected on our application for
the $5,000.00 grant from the Idaho Community Foundation. The good news is the work should
start tomomow, weather permitting. He thinks the College might fund the signs. Chuck R
mentioned the Caldwell Civic Building League regarding the $5,000 they gave us for The Hat
earlier this year.
2 Code Enforcement - Brian B reported that the Police Dept has requested some
updates. As this item seems to be going nowhere, we are removing it from our list.
3 Historic District Signs - Chuck R reported on the various signs and their
placement. He has seven signs to go up. When the district was formed the question came up
regarding a name. Steunenberg was selected. Then we chose the Hayman house as our logo and
now the signs say Steunenberg District and have the Hayman house on them. Maybe, when we
do future signs we should use the Steunenberg house.
4 Statement to use for Commission in Advisory Roll - Brian B reported that the
City recommends we continue assisting future applicants, as long as there has not been an
application filed. Once an application is filed the applicant should contact the City. We should
not discuss the application outside of the hearing.
5 Draft letter to prospective home buyers - Gina L said she has lost the first draft
letter she wrote. She passed around copies of her new letter. Brian B offered to take her letter
and tweak it some.
6 Rezone of District to R-i - Brian B said there is nothing new to report on this. He
i . - , . r- t-t-. 1r r^ 11-- n:t- /'a^-.-^:1 :- T^.^.,^-., ^- D^L-.'^-.' ^f lnnQ /l;-^ T -.L if tl"io .,,^,,1.1nupes tu taKc l[ [u ultr \-lty \-uurrull lll J4rru4rJ \Jl r vuru4rJ ur 4vvu. urrro L oJr\ ta rlrro vvvuru
affect the proposed duplex on Blaine St. Brian said that since the application has been filed, it
would not be affected by a re-zone.
7 Ordinance &-f6n.. Update - Is actually tied to ItemHd will go to the Council
at the same time.
8 Letterhead - Anita S passed around several copies of the proposed letterheads. Tina L
pointed out that the design does not point out that we a Commission appointed by the City of
Caldwell. The consensus was to use time period correct font. Anita S volunteered to purchase a
ream of paper. Elaine C said she would spring for the font. It was decided we need a textured
white paper.
9 House numbering on curbs - Chuck R reported, the request we received a couple
of meetings back from an Eagle Scout wanting to place house numbers on the curbs, although
signed by Gordon Law was not necessarily his project. The contractors doing Blaine and
Cleveland were out last weekend and painted the numbers on the curbs, in a very sloppy manner.
Chuck R said he would check with the City to see if this was indeed part of the contract.
10 Streetscape Committee - Eileen D said she had nothing new to report
11 School District/Historic Buildings - Brian B reported that he has spoken to the
Mayor, regarding a committee being formed by the School District. The Mayor agreed to appoint
Brian and someone from this commission to this committee. Steve M was suggested. Elaine C
said if Steve M was not interested in doing this, we really need someone from our Commission
on the committee. Eileen D said she was willing to attend the meetings, but she wasn't sure if
she was the one for the job.
lZ CLG Grant - Brian B said he witl take care of this. Ann Swanson from SHPO
thought we could get this work done for $2000.00,
Ix. NEW BUSINESS
1 Jan B reported that Bill Crookham has been converting the oral history interviews
(now on audio cassettes at the library) to CDs, and also making typed transcripts of each
interview.
X For the Good of the Commission
Jan B also told of the Lyle Stanford water color of the Old City Hall, which is hanging in
the City Hall. Jan suggested to the Mayor that he could do a reprint of this to frame and hang in
City Hall and give the original to the College to add to their Lyle Stanford collection' If the
original water color is not cared for properly, it could be destroyed
XI. Adjournment Motion to adjourn, Gina L. second Jan B. Motion passed.
Next meeting: December 17,2007
Respectfully submitted by Anita Shore, Secretary
f$
sil$-,os\q
.S
\
6qsq
N.arl Is
r@
h
##
d
@
Ts+qh
o$das
Eb
@q
NnVro
e$
-$
q
GD"'
ss
@hlG}
@
tgh
1'qri
.SlVh$il
e.N9F\N Oa.- tt' tr.^J t r. <tHSSN<^ \S'sl !3Ni S\=-,\\S S ,:TII\ (a 'OHsSF.SeNeoRS S.i'il\s 5s.,$cr*.E.(\-GS *ts
e S's*ss\S ci$i
Eq,SsNs
o.. \3 Siso\\8\Gs's's
S.F
6' 'a
*.FI
Gs-
G
oN
IoOoIo\
NI
61.o\5
N
N!.N
Ho
@+o
2.o
d
(!B
a9
t9
l=
t.
N
I\
\
@
6.
ate
Eo
Erl
s
otroo
EEI
ts
oE
$.
g
I.
II
AGENDA
Historic Preservation Commission
Monday, November 26,2007- 6:00 P.M.
Caldwell Public Library- Idaho Room
1010 Dearborn, Caldwell, Idaho
Call to order
Roll Call
Approval of Agenda
Approval of Minutes
o October 22,2007
Certifi cate of Appropriateness Interviews
o CA-104-07 - 1609 Blaine St.- New Duplex - Marty Camberlango
o CA-109-07 - l4l7 Everett St. - Re-side- Shawn Humberger
VI. Audience Participation
VII. Actions Since Last Meeting
o CA-108-07- 1323 Everett St. - Re-Roof- David Markowsi - C of A
issued on llll2l07.
o CA-107-07- 1702 Cleveland Blvd. - Re-Roof - Bridge Investors, LLC. -
waiting a call back and a new roofing sample from the applicant. The
applicant's original sample is not acceptable.
o CA-106-07- 1816 Blaine St. - Re-Roof - Robert & Mary Kent - C of A
issued on 10126107.
VIII.Old Business
o The Hat - Jan B.
o Code Enforcernent- Rick Wells
o Historic District Signs- Everyone
o Statement to use for Commission in Advisory Roll; Brian/ City Attorney
o Draft letter to prospective home buyers-Gina
o Rezone of District to R-l- Brian
o Ordinance & Fence Update- Brian
o Letterhead- Anitao House numbering on curbs- Chuck
o Streetscape Committee- Eileen
. School District/ Historic Buildings- Brian
m.
IV.
V.
*0-5
City of Caldwell
Historic Preservation Commission
Certificate of Appropriateness Application
I, the undersigned, do hereby apply for a Certificate of Appropriateness for the following project that may
affect the Steunenberg Residential Historic District's historical, architectural, ecological or scenic
attributes.
I have been furnished, and have reviewed, the Step-by-Step guide for
Certifi cate of ApproPriateness.
Overview
The Caldwell Historic Preservation Commission reviews land use activities that may affect the
Steunenberg Residential Historic District's historical, architectural, ecological or scenic attributes.
The Caldwell Historic Pre5ervation Commission has prepared a checklist to assist you in applying for the
Certificate of Appropriateness. If you need a COA, please fill out the checklist. The checklist is not a
substitute for other materials required by the Commission. Required materials include:
! A written narrative describing the reason for the alteration and fully describing the
treatment of each item you have checked on the list. Removal of existing material is also
subject to Commission review. If you can document to the satisfaction of Commission staff
that changes will be in-kind using like materials, then no further review shall be necessary.
! A drawing, sketch or other graphic representation annotated with dimensions, materials
and, where appropriate, lettering and lighting. Graphic material should be I lX17 in size and
readable when copied in black and white'
! Exterior photographs are required in every case to document existing conditions o r to
determine the location of the alteration on the building or site. Comer lots must include
photos from each street.
Applicant Information
Owner I ,
Address
Phone Number %-
Resident (if dffirent than owner)
Tax Parcel Numbe(s)
Dimensions or acreage of the properly
il o'I
Please be thorough in completing the checklist. The decision of the Caldwell Historic Preservation
Commissionwillbebasedon the completedchecklist. Anyanticipated orunidentified changes not
shown onthelist will need to be discussedwith staffandpossiblyreturned totheCommission for
approval. Work completed without the Commission's approval is in violation of the Municipal code and
subject to fines and/or reversal. The Community Development staff is available to answer questions or
o.oi"f .,/ith nrrffinc tnoefher en ennlication Yort mav contact them at 455-3021 .-'^-'J '-- "',
1
./4o. Dov
/-4 "-a, f--*, c,fl )f ./i:.(f,,.re\\ ."ft.\
tt
Completed applicstion and checklist must be received by Community Development at leastfourteen
(l4)-days before the regularly scheduled Caldwett Historic Preservation Commission meeting.
Check the items that best describe your intended actions.
*W6*t"riorAlteration tr Addition or New Construction
I Interior Alteration (which affects exteior)flDemolition
! Parking Lot (addition or alterations)tr Ecological or Scenic Attributes
(trees or landscaping)
wdth", (p leas e exp la in)l:l v l-rt*
-7oIe- At EC,
Checklist of Exterior Changes
All exterior changes, including additions, should be described in materials accompanying this form and/or
presented at the public hearing. Ifthere are anticipated exterior changes that are not shown in the current
proposal, please include them on this checklist.
Are, there any proposed changes to or additions of:
ROOFS
fu c\D
.rf At'.X.loc^tI -rr;,*7tc,.
I
h t-5aJ'
WINDOWS
E dimensions
E materials
E frames, decorative details
! muntins, mullions
DOORWAYS
tr dimensions
I materials
D parapet walls
E cresting, curbing or railings
E skylights, ventilators, etc.
I drainage system, gutters, downspouts
! glazing
! awnings, canopy
n shutters
! other
! awnings, canopy
Z glazing
E configuration
Wdterials 30
D eaves
! chimneys
D other
2
D frames, decorative details
I doors
EXTERIOR WALLS
tr materials
! architectural details
n other
PORCHES and/or BALCONIES
E configuration
! materials
n framing
EXTERIOR STAIRS
! configurations
n risers
E treads
I other
LANDSCAPE FEATURES
fl paving materials
D retaining walls
D walkways, sidewalks, terraces
I other
SIGNS
! location
[] dimension
! materials
! cheek walls
! railings, balusters, newels
! right-of-way
! fences, pergolas
E trees, landscaping
! lighting
! method of attachment
! other
E hardware
n other
! surface cleaning
E mortar joints
E flooring
! railings, balusters
E other
3
I rnaterial
DEMOLITION
! home
! outbuilding
PARKING LOT (OFF-SITE)
! paving
! parking, walkwaYs, sidewalks
! garage
! other
fl paving materials
! other
Does your pending project require a Federal or State license, permit or approval? (Circle on)Y o@
SPECIAL USE PERMIT
D Purpose:
HOME OCCUPATION
n Purpose:flcsi -f *\
OTHER LAND-USE APPLTCATION
! Type:
Date
///?/6 "D?t-/0a 6u tv7Applicant Signature
Date Received
Approved Denied
CL{ PC Chairperson Signature Date
4
Office Use
GLOSSARY OF TERMS
Arch
A curved and sometimes pointed structural member to span an opening.
Balcony
A railed, projecting platform found above ground level on a building.
Baluster
One ofa series ofshort pillars or other uprights that support a handrail or coping.
Balustrade
A series ofbalusters connected on top by coping or a handrail and sometimes on the bottom by a button rail; used on staircases,
porches, etc.
Bay
A space protruding from the exterior walt that may contain a window; a compartment of about l6 feet on a side. A bay window
is a projecting window with an angular plan.
Brackets
Projecting support members found under eaves or other overhangs; may be plain or decorated.
Casement
A window sash thSt opens on hinges fued on its vertical edge. A casement window contains two casements separated by a
mullion (vertical dividing bar).
Clapboard Siding
ThiJtype ofsiding consists ofboards that are thicker on one edge than the otheq the bottom (thick) edge ofone board overlaps
the top (thin) edge of the board below.
CoIumn
A pillar, usually circular in plan. The parts of a column in classical architectural are the base, shaft and capital.
Court
An open area partially or totally sunounded by walls or buildings.
Dormer
A vertical window projecting from the slope of a roof; usually provided with its own roof. The specific name of a dormer is
frequentty determined by the shape or type of its roof.
Double hung window
A window with two sashes, each moveable by means of sash cords and weights.
Eave
That portion of the roof which projects beyond the walls. Eaves that are without gutters arc often referred to as dripping eaves.
Fagade
The principal face or front elevation ofa building.
Gable
The triangular end of an exterior wall in a building with a ridged roof.
Gable roof
A sloping (ridged) roof that terminates at one or both ends in a gable. Also known as pitched roof, ridge roof or comb roof-
Gutter
A channel ofwood or metal running along the eaves ofa house; used for catching and carrying ofwater.
IIip Roof
A roof formed by four pitched roof surfaces.
Louver
A small lantern or other opening, often with wood slats, used for ventilating aftics or other spaces.
Masonry
Work constructed by a mason using stone, brick, concrete blocks, tiles or similar materials.
Molding
A continuous decorative band; serves as an ornamental device on both the interior and exterior of a building or structure; also
often serves the function of obscuring the joint formed when two surfaces meet.
Mullion
A vertical member, as of stone or wood, between the lights of a window-
Muntin
A bar for holding the edges of windows or panes within the sash.
Newel
A vertical support at the center ofa circular staircase; a post that supports a handrail at the bottom or at the landing ofa staircase.
Pane
A single piece of window glass. Windows are often described according to the number of panes they have. For example, a
window with eight panes of glass is called an eight light window. Often a double hung window is described in terms of the
number ofpanes in each ofits two sashes (e.g., a six-over-six double hungwindow indicates that each sash has six panes.
Parapet
A delensive wall or elevation, as ofearth or stone, in a fortification-
Pilasfer
A rectangular column or shallow pier attached to a wall; frequently decoratively treated to represent a classic column.
5
\./
Porch
A covered entrance or semi-enclosed space projecting from the fagade of a building; may be open-sided, screened or glass
enclosed. A small porch may be called a stoop.
Portico
A covered walk or porch supported by columns or pillars.
Sash
The framework into which panes are set.
Shed Roof
A roof consisting of one inclined plane. Unlike a lean-to roof, a shed roof need not be carried by a higher wall (i.e., it may serve
as the primary roof form for a building.
Siding
ettno,igt the term siding is sometimes used to refer to exterior walI coverings made of wood, its meaning may be extended to
include any type of finish covering on a frame building (with the exception of masonry). The term cladding.is often used to
describe any exterior wall covering, including masonry.
sill
The framing member that forms the lower side of an opening, such as a door sill. A window sill forms the lower, usually
projecting, lip on the outside face of a window.
Spindle work
,A.-n omament made with a lathe; used as gable or porch trim. Also known as turned wood ornaments.
Stucco
An exterior wall covering consisting of a mixture of portland cement, sand, lime and water; or a mixture of portland cement, sand
hair (or fiber) and sometimes crushed stone for texture; this term is often used synonymously with cement plaster.
Truss
A truss is essentially a triangle formed by any one of a combination of structural members into a rigid roof framework for
spanning between two load bearing walls. Generally, trusses are used when the span between two such walls exceeds 20 to 35
feet.
Turret
A small and somewhat slender tower; often located at a comer of a building, in which case, it is often referred to as a comer
turret.
Veranda
A roofed space attached to the exterior wall of a house and supported by columns, pillars or posts; called piazza in earlier
literature. A closely related term is porch, although its meaning usually is confined to a covered shelter over an exterior door.
6