HomeMy WebLinkAboutCA-80-06 Stephan & Brenda Fisher 1615 Dearborn StCity of Caldwell
Historic Preservation Com mission
Certificate of Appropriateness Application
I, the undersigned, do hereby apply for a Certificate of Appropriateness for the following project that may
affect the Sieunenberg Resiaintiat Historic District's historical, architectural, ecological or scenic
attributes. r'
I have been furnished, and have reviewed, the step-by-Step guide for
Certificate of APProPriateness.
Overview
The Caldwell Historic preservation Commission reviews land use activities that may affect the
St"rn.nberg Residential Historic District's historical, architectural, ecological or scenic attributes'
The Caldwell Historic preservation Commission has prepared a checklist to assist you in applying for the
c.niifi" of Appropriateness. If you need a coA, please fill out the checklist. The checklist is not a
substitute for other materials required by the Commission. Required materials include:
[.e *ritt"n narrative describing the reason-for.the.alteration and fully describing the
treatment of each item you haveihecked on the list. Removal of existing material is also
subject to Commission review. If you can document to the satisfaction of Commission staff
thai changes will be in-kind using like materials, then no further review shall be necessary.
Xe a.u*ing, sketch or other graphic representation annotated with dimensions, materials
-*d, *h.r" aipropriate, lettering una tightirg. Graphrg material should be I lXlT in size and
readable when copied in black and white. sh.t a-3 Cr- l"n a 7tL
Vtxterior photographs are required in every case to document existing conditions or to
(E-t"rrnin" tire toclation of the alteration on the building or site. Comer lots must include
photos from each street.
please be thorough in completing the checklist. The decision of the Caldwell Historic Preservation
Commission will be based on the completed checklist. Any anticipated or unidentified changes not
shown on the list will need to be discussed with staff and possibly retumed to the Commission for
ufprorut. Work completed without the Commission's approval is in violation of the Municipal code and
,ufu""t to fines and/or reversal. The Community Development staff is available to answer questions or
assist with putting together an application. You may contact them at 455-3021'
I
Information
gTq? lte ) Ats b bnEo 0 fi st+e-t--Owner De*tl oR-N 6T C *'t-?t^:Address jlPhone Number
thanResident
Tax Parcel N s s2.{ loDimensions or acreage of the property
Completed application and chechlist mast be received by Community Development at leastfourteen
(14) days before the regalarly schedaled Caldwell Historic Preservation Commission meeting.
Check the items that best describe your intended actions.
D Exterior Alteration
E Interior Alteration (which affects exterior)
D Ecological or Scenic Attributes
(trees or landscaping)
pDther (please explain)
tr Addition or New Constuction
E Demolition
D Parking Lot (addition or alterations)
GNLg (-oo?
Checklist of Exterior Changes
All exterior changes, including additions, should be described in materials accompanying this form and/or
presented at the public hearing. If there are anticipated exterior changes that are not shown in the cunent
proposal, please include them on this checklist.
Are there any proposed changes to or additions of:
ROOFS
tr configuration D ParaPet walls
D materials D cresting, curbing or railings
D eaves
tr chimneys
E other
! drainage system, gutters, downspouts
etc.F"t y
WINDOWS
D dimensions
tr materials
E frames, decorative details
D muntins, mullions
DOORWAYS
tr dimensions
E materials
tr glazing
D awnings, canopy
E shutters
E other
E awnings, canopy
J giazing
2
i
D frames, decorative details
D doors
EXTERIOR WALLS
! materials
O architectural details
D other
PORCHES and/or BALCONIES
E configuration
D materials
! framing
EXTERIOR STAIRS
I configurations
D risers
D treads
LANDSCAPE FEATURES
D paving materials
D retaining walls
I walkwaYs, sidewalks, terraces
tr
SIGNS
D location
D dimension
E material
D hardware
D other
D surface cleaning
E mortar joints
D flooring
E railings, balusters
fl other
E materials
D cheek walls
E railings, balusters, newels
tr right-of-waY
f) fences, pergolas
D trees, landscaPing
E lighting
! method of attachment
J
D other
DEMOLITION
! home
D outbuilding
PARKING LOT (OFF-SITE)
D paving
D parking, walkways, sidewalks
! garage
! other
E paving materials
tr other
Does your pending project require a Federal or State license, permit or approval? (Circte one)Y ,@
SPECIAL USE PERMIT
D Purpose:
HOME OCCUPATION
E Purpose:
OTHER LAND.USE APPLICATION
D Type:
{, f tt /6L6,/ /-. !Applicant Signature
Date Received
:Denied
4
i
GLOSSARY OF TERMS :
Arch
A curved and sometimes pointed structural member to span an opening.
Balcony
A railed, projecting platform found above ground level on a building.
Baluster
One ofa series ofshort pillars or other uprights that support a handrail or coping'
Balustrade
A series ofbalusters connected on top by coping or a handrail and sometimes on the bottom by a button rail; used on staircases,
porches, etc.
Bay
a space protruding from the exterior wall that may contain a window; a compartnent of about 16 feet on a side. A bay window
is a projecting window with an angular plan.
Brackets
projecting support members found under eaves or other overhangs; may be plain or decorated.
Casement
A window sash that opens on hinges lixed on its vertical edge. A casement window contains two casements separated by a
mullion (vertical dividing bar).
Clapboard Siding
T.t i, typ. of siding Lnsists of boards that are thicker on one edge than the other; the bottom (thick) edge of one board overlaps
the top (thin) edge ofthe board below.
Column
a piUar, usualty circular in plan. The parts ofa column in classical architectural are the base, shaft and capital.
Court
An open area partially or totally surrounded by walls or buildings'
Dormer
A vertical window projecting from the slope of a roof; usually provided with its own roof. The specific name of a dormer is
frequently determined by the shape or type ofits roof.
Double hung window )
A window wi6 npo sashes, each moveable by means of sash cords and weights.
Eave
That portion ofthe roofwhich projects beyond the walls. Eaves that are without gufters are often referred to as dripping eaves.
Fagade
The principal face or front elevation of a building.
Gable
The triangular end of an exterior wall in a building with a ridged roof'
Gable roof
A sloping (ridged) roofthat terminates at one or both ends in a gable. Also known as pitched roo[, ridge roofor comb roof.
Gutter
A channel of wood or metal running along the eaves of a house; used for catching and carrying of water.
Hip Roof
A roofformed by four pitched roofsurfaces.
Louver
A small lantern or other opening, often with wood slats, used for ventilating attics or other spaces.
Masonry
Work constructed by a mason using stone, brick, concrete blocks, tiles or similar materials.
Molding
A continuous decorative band; serves as an ornamental device on both the interior and exterior of a building or sfucture; also
often serves the function of obscuring the joint formed when two surfaces meet.
Mullion
A vertical member, as of stone or wood, between the lights of a window.
Muntin
A bar for holding the edges of windows or panes within the sash.
Newel
A vertical support at the center ofa circular staircase; a post that supports a handrail at the bottom or at the landing of a staircase.
Pane
A single piece of window glass. Windows are often described according to the number of panes they have. For example, a
windolw with eight p-., oi glass is called an eight light window. Often a double hung window is described in terms of the
number ofpaneiin eact of iS two sashes (e.g., a six-over-six double hung windou indicates that each sash has six panes.
Parapet
A defenslve wal! or eleva,tion, as ofearth or stone, in a fortification.
Pilaster
A rectangular column or shallow pier attached to a wall; fiequently decoratively feated to represent a classic column.
5
Porch
A covered entrance or semi-enclosed space projecting from the fagade of a building; may be open-sided, screened or glass
enclosed. A small porch may be called a stoop.
Portico
A covered walk or porch supported by columns or pillars.
Sash
The framework into which panes are set.
Shed Roof
A roof consisting of one inclined plane. Unlike a lean-to roofl a shed roof need not be carried by a higher wall (i.e., it may serve
as the primary roof form for a building.
Siding
aftfro,it the term siding is sometimes used to refer !o exterior wall coverings made of wood, its meaning may be extended to
include-any type of finiih covering on a frame building (with the exception of masonry). The term cladding is often used to
describe any exterior wall covering, including masonry.
sill
The framing member that forms the lower side of an opening, such as a door sill' A window sill forms the lower, usually
projecting, lip on the outside face of a window.
Spindle work
Air ornament made with a lathe; used as gable or porch trim. Also known as tumed wood orDaments.
Stucco
An exterior wall covering consisting of a mixture of portland cement, sand, lime and water; or a mixture of portland cement, sand
hair (or fiber) and sometimes crushJd stone for texture; this term is often used synonymously with cement plaster.
Truss
A tr'uss is essentially a triangle formed by any one of a combination of structural members into a rigid roof framework for
spanning between two load b-earing walls.
-
Generally, husses are used when ttre span between two such walls exceeds 20 to 35
feet,
Turret
A small and somewhat slender tower; often located at a comer of a building, in which case, it is often referred to as a comer
hmet.
Veranda
a ,oorea space attached to the exterior watl of a house and supported by columns, pillars or posts; called piazza rn earlier
literature. A closely related term is porch, although its meaning usually is confined to a covered shelter over an exterior door.
6
a
Stephen Fisher
1615 Dearborn St.
Caldwell Idaho 83605
459-9318
6lt6106
Certificate of Appropriateness Application Narrative
This application is to replace the roof on the garage. The garage is located on the back
left side of the property and is accessed from the alley behind the property. The short side
of the galz;ge faces the front of the property.
Currently, the roof is black/dark gray asphalt shingles. It will be replaced with asphalt
shingles of the same style and color to match roof of residence. The garage roof is not
currently ventilated and ventilators will be installed.
The roof on garage is in need of replacement due to age and deterioration.
Thanks you for considering this application.
Stephen M. Fisher
Page I of I
0pe,n; Corn,^e
l\ *rrc- f,l'tt ^V@'
Ohq{q't3l^c-L.
http:ll65.168.229.25lexteriorft/RenderServlet/Efi</swatch.vnt?fmr-jpg&wid:300&res:9&sr... 6l16106
City "f afchtrell
r'
I
rt'
l
C, rttficote "f ,r oa) ri qt e n e.t.t<,
Stepfren et (Bren[a lFisfrer. owners of site proper^Q focate[
at 1615 .9treet.fiave 6een awarfefa Qertficate of Appropriateness
6y tfre Citl of Catfwe[[I{istoricaf(Preservation Commksion in conjunctian
witfr Case ht'o. CA-80-06 (garage roof.
Approvetl on Xu,, a 3?? ,20-(&_ by
Ilistolical heservation Chairperson
r,
lt.,
-l
!f.(
I
.t I-t ,;?
-t I
r,
I
ITi'T-'Il
- tt
Iiil I:ll
LIt I llu iLI
r;
i.
t
\
1
l-a-
L t
I
!,
I
\
t
ri]
,/
a.
t
ir-
,F I#,
t
I
-
I
lr.t.-,
rl
''}
,r-J
i
I,
l
:a