Loading...
HomeMy WebLinkAboutCloud Gate Condos_EngComments_2024-03-19 Cloud Gate Condos SUB24-000009 Page 1 of 1 Memorandum To: Katie Wright, Planner II From: TJ Frans, Project Manager Steven Pendleton, Civil Plans Examiner II Re: SUB24-000009 Cloud Gate Condos Date: March, 19 2024 The Engineering Department provides the following comments on a request by Epic Development is requesting approval of a short plat application for seven (7) industrial condominium units. The parcel is zoned M-1, Light Industrial. Two of the seven units are constructed; the other five (5) units have submitted building permit applications. The subject parcel is located on the northeast side of E. Chicago St., approximately 1,200 feet southeast of the intersection with N. 21st. Ave., in Caldwell, Idaho. General 1. Per City Code Separate Connections Required: Each separate building shall be connected with the water main through a city water service line, which includes a meter. Individual service requirements for condominium projects shall be as per section 11-04-05 of this code. Subsequent to investigation by the city engineer, the city council may grant permission for a single meter to serve more than one water consumer. Upon a granting of an exemption, the base water rate shall be adjusted to reflect the number of water consumers on a single meter. (Ord. 1618, 10-12-1982; Ord. 2831, 5-17-2010)