HomeMy WebLinkAboutCloudgate Industrial Park_Elevations 2_2024.02.22UP
A-2.01
A-2.0
A-2.0
A-2.0
2
3
1
1
2
2
A A
B B
115' - 0"62' - 0"1
A-3.0
4 2' - 5 1/2"14' - 0"2' - 8"2' - 2"8' - 0"4' - 2"3' - 4"5' - 0"5' - 8"3' - 4"3' - 4"6"5' - 0"2' - 4 1/2"19' - 1 1/2"14' - 4"14' - 0"14' - 6 1/2"62' - 0"115' - 0"
27' - 7 1/2"14' - 0"34' - 6"24' - 0"6' - 0"5' - 0"3' - 10 1/2"9' - 1 1/2"3' - 4"49' - 6 1/2"2
A-3.0
3
A-3.0
10' - 8"5' - 7"7' - 9"14' - 10 1/2"9' - 7"16' - 6 1/2"2' - 5"8' - 0"8' - 6 1/2"9' - 7"101D
101A 108B107A102A103A102B
106A
108A
104A105A101C101BSHOP
101
OFFICE
102
OFFICE
103
RECEPTION
104
BREAK
108
RR
106
RR
105
SHOWER
107
W2
W2
W2
W2
W2
W2
W2
W2
W3
W2
W2W2
W2
W2
W1
W1
W1
W1
A
A
A
B
-
---
-
---
METAL WALL PANELS OVER
METAL BUILDING STRUCTURE
METAL GIRT FRAMING W/ R-19 MBI
INSULATION w/ WMP-50 FACING
3/4" T&G OSB 8'-0" A.F.F. W/
WMPVR VAPOR BARRIER
ABOVE OSB TYPICAL
STANDARD EXTERIOR PEMB WALLW1
5/8" GYP. B.D EA. SIDE PRIME,
PAINT & FINISH, EACH SIDE.
3 5/8" 20 GA. STEEL STUD AT 16"
O.C. TO UNDERSIDE OF DECK OR
CEILING FRAMING
ACOUSTIC BATT
INSULATION
STANDARD 3 5/8" MTL STUD WALL
NOTE: AT ALL RESTROOM OR PLUMBING FIXTURE SIDE
SURFACES, INSTALL 5/8" W.P. GYP. BD. PROVIDE EPOXY
PAINT ON ALL RESTROOM SIDE WALLS
W2
5/8" GYP. B.D EA. SIDE PRIME,
PAINT & FINISH, EACH SIDE.
6" 20 GA. STEEL STUD AT 24"
O.C. TO UNDERSIDE OF DECK OR
CEILING FRAMING
ACOUSTIC BATT
INSULATION
STANDARD 6" MTL STUD WALL
NOTE: AT ALL RESTROOM OR PLUMBING FIXTURE SIDE
SURFACES, INSTALL 5/8" W.P. GYP. BD. PROVIDE EPOXY
PAINT ON ALL RESTROOM SIDE WALLS
W3
PROFESSIONAL SEAL
PROJECT NAME:PLOT DATE:
JOB NO:
DATE:
DRAWN BY:
SHEET NUMBER:
COPYRIGHT ALL RIGHTS RESERVED. THIS DRAWING AND ALL INFO. CONTAINED HEREIN, IS THE PROPERTY OF ARCHITECTURE DESIGNS PLUS P.A., AND MAY NOT BE REUSED WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT
4/16/2021 12:36:27 PMAIR FILTER SUPERSTOREBOISE, ID 83713569 N. CLOVERDALE RD.FLOOR PLANSA-1.0
BPB
Project
Number
3/16" = 1'-0"1 FIRST FLOOR PLAN NO.REVISIONSDATE
FINISH FLOOR
100' -0"
EAVE
120' -0"
AB
1.9
1.111.111.11
1.1
1.3
1.5 1.4
1.10
1.6
1.7
FINISH FLOOR
100' -0"
EAVE
120' -0"
12
1.9
1.4 1.10
1.2
1.10
FINISH FLOOR
100' -0"
EAVE
120' -0"
1 2
1.4 1.10 1.5
1.9
1.3
1.8
1.11
1.7
1.6
FINISH FLOOR
100' -0"
EAVE
120' -0"
A B
1.9
1.5
1.4
1.2 1.8
1.10
PROFESSIONAL SEAL
PROJECT NAME:PLOT DATE:
JOB NO:
DATE:
DRAWN BY:
SHEET NUMBER:
COPYRIGHT ALL RIGHTS RESERVED. THIS DRAWING AND ALL INFO. CONTAINED HEREIN, IS THE PROPERTY OF ARCHITECTURE DESIGNS PLUS P.A., AND MAY NOT BE REUSED WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT
4/16/2021 12:36:28 PMAIR FILTER SUPERSTOREBOISE, ID 83713569 N. CLOVERDALE RD.ELEVATIONSA-2.0
BPB
Project
Number
04/16/21
1/8" = 1'-0"1EAST
1/8" = 1'-0"2NORTH
1/8" = 1'-0"3SOUTH
1/8" = 1'-0"4WEST NO.REVISIONSDATEKEYNOTES
#NOTE
1.1 ALUMINUM STOREFRONT DOOR - REFER TO SCHEDULE
1.2 INSULATED HOLLOW METAL DOOR - REFER TO SCHEDULE
1.3 INSULATED OVERHEAD DOOR - REFER TO SCHEDULE
1.4 METAL ROOF ATTACHED TO GIRTS/ PEMB STRUCTURE PER MFR.
1.5 PRE-FINISHED METAL FACIA
1.6 METAL AWNING
1.7 STONE VENEER BASE
1.8 CONCRETE FILLED STEEL BOLLARD
1.9 METAL SIDING BY PEMB MFR.
1.10 PREFINISHED GUTTER/ DOWNSPOUT
1.11 METAL FRAMED WINDOW- REFER TO SCHEDULE
FINISH FLOOR
100' -0"
MEZZANINE
110' -0"
EAVE
120' -0"
A B
FINISH FLOOR
100' -0"
MEZZANINE
110' -0"
EAVE
120' -0"
A B
FINISH FLOOR
100' -0"
MEZZANINE
110' -0"
EAVE
120' -0"
1 2
1
A-3.0
2
A-3.0
PROFESSIONAL SEAL
PROJECT NAME:PLOT DATE:
JOB NO:
DATE:
DRAWN BY:
SHEET NUMBER:
COPYRIGHT ALL RIGHTS RESERVED. THIS DRAWING AND ALL INFO. CONTAINED HEREIN, IS THE PROPERTY OF ARCHITECTURE DESIGNS PLUS P.A., AND MAY NOT BE REUSED WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT
4/16/2021 12:36:28 PMAIR FILTER SUPERSTOREBOISE, ID 83713569 N. CLOVERDALE RD.SECTIONSA-3.0
BPB
Project
Number
04/16/21NO.REVISIONSDATE1" = 10'-0"1 SECTION A
1" = 10'-0"2 SECTION B
1/8" = 1'-0"3SECTION C