Loading...
HomeMy WebLinkAboutCloudgate Industrial Park_Elevations 2_2024.02.22UP A-2.01 A-2.0 A-2.0 A-2.0 2 3 1 1 2 2 A A B B 115' - 0"62' - 0"1 A-3.0 4 2' - 5 1/2"14' - 0"2' - 8"2' - 2"8' - 0"4' - 2"3' - 4"5' - 0"5' - 8"3' - 4"3' - 4"6"5' - 0"2' - 4 1/2"19' - 1 1/2"14' - 4"14' - 0"14' - 6 1/2"62' - 0"115' - 0" 27' - 7 1/2"14' - 0"34' - 6"24' - 0"6' - 0"5' - 0"3' - 10 1/2"9' - 1 1/2"3' - 4"49' - 6 1/2"2 A-3.0 3 A-3.0 10' - 8"5' - 7"7' - 9"14' - 10 1/2"9' - 7"16' - 6 1/2"2' - 5"8' - 0"8' - 6 1/2"9' - 7"101D 101A 108B107A102A103A102B 106A 108A 104A105A101C101BSHOP 101 OFFICE 102 OFFICE 103 RECEPTION 104 BREAK 108 RR 106 RR 105 SHOWER 107 W2 W2 W2 W2 W2 W2 W2 W2 W3 W2 W2W2 W2 W2 W1 W1 W1 W1 A A A B - --- - --- METAL WALL PANELS OVER METAL BUILDING STRUCTURE METAL GIRT FRAMING W/ R-19 MBI INSULATION w/ WMP-50 FACING 3/4" T&G OSB 8'-0" A.F.F. W/ WMPVR VAPOR BARRIER ABOVE OSB TYPICAL STANDARD EXTERIOR PEMB WALLW1 5/8" GYP. B.D EA. SIDE PRIME, PAINT & FINISH, EACH SIDE. 3 5/8" 20 GA. STEEL STUD AT 16" O.C. TO UNDERSIDE OF DECK OR CEILING FRAMING ACOUSTIC BATT INSULATION STANDARD 3 5/8" MTL STUD WALL NOTE: AT ALL RESTROOM OR PLUMBING FIXTURE SIDE SURFACES, INSTALL 5/8" W.P. GYP. BD. PROVIDE EPOXY PAINT ON ALL RESTROOM SIDE WALLS W2 5/8" GYP. B.D EA. SIDE PRIME, PAINT & FINISH, EACH SIDE. 6" 20 GA. STEEL STUD AT 24" O.C. TO UNDERSIDE OF DECK OR CEILING FRAMING ACOUSTIC BATT INSULATION STANDARD 6" MTL STUD WALL NOTE: AT ALL RESTROOM OR PLUMBING FIXTURE SIDE SURFACES, INSTALL 5/8" W.P. GYP. BD. PROVIDE EPOXY PAINT ON ALL RESTROOM SIDE WALLS W3 PROFESSIONAL SEAL PROJECT NAME:PLOT DATE: JOB NO: DATE: DRAWN BY: SHEET NUMBER: COPYRIGHT ALL RIGHTS RESERVED. THIS DRAWING AND ALL INFO. CONTAINED HEREIN, IS THE PROPERTY OF ARCHITECTURE DESIGNS PLUS P.A., AND MAY NOT BE REUSED WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT 4/16/2021 12:36:27 PMAIR FILTER SUPERSTOREBOISE, ID 83713569 N. CLOVERDALE RD.FLOOR PLANSA-1.0 BPB Project Number 3/16" = 1'-0"1 FIRST FLOOR PLAN NO.REVISIONSDATE FINISH FLOOR 100' -0" EAVE 120' -0" AB 1.9 1.111.111.11 1.1 1.3 1.5 1.4 1.10 1.6 1.7 FINISH FLOOR 100' -0" EAVE 120' -0" 12 1.9 1.4 1.10 1.2 1.10 FINISH FLOOR 100' -0" EAVE 120' -0" 1 2 1.4 1.10 1.5 1.9 1.3 1.8 1.11 1.7 1.6 FINISH FLOOR 100' -0" EAVE 120' -0" A B 1.9 1.5 1.4 1.2 1.8 1.10 PROFESSIONAL SEAL PROJECT NAME:PLOT DATE: JOB NO: DATE: DRAWN BY: SHEET NUMBER: COPYRIGHT ALL RIGHTS RESERVED. THIS DRAWING AND ALL INFO. CONTAINED HEREIN, IS THE PROPERTY OF ARCHITECTURE DESIGNS PLUS P.A., AND MAY NOT BE REUSED WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT 4/16/2021 12:36:28 PMAIR FILTER SUPERSTOREBOISE, ID 83713569 N. CLOVERDALE RD.ELEVATIONSA-2.0 BPB Project Number 04/16/21 1/8" = 1'-0"1EAST 1/8" = 1'-0"2NORTH 1/8" = 1'-0"3SOUTH 1/8" = 1'-0"4WEST NO.REVISIONSDATEKEYNOTES #NOTE 1.1 ALUMINUM STOREFRONT DOOR - REFER TO SCHEDULE 1.2 INSULATED HOLLOW METAL DOOR - REFER TO SCHEDULE 1.3 INSULATED OVERHEAD DOOR - REFER TO SCHEDULE 1.4 METAL ROOF ATTACHED TO GIRTS/ PEMB STRUCTURE PER MFR. 1.5 PRE-FINISHED METAL FACIA 1.6 METAL AWNING 1.7 STONE VENEER BASE 1.8 CONCRETE FILLED STEEL BOLLARD 1.9 METAL SIDING BY PEMB MFR. 1.10 PREFINISHED GUTTER/ DOWNSPOUT 1.11 METAL FRAMED WINDOW- REFER TO SCHEDULE FINISH FLOOR 100' -0" MEZZANINE 110' -0" EAVE 120' -0" A B FINISH FLOOR 100' -0" MEZZANINE 110' -0" EAVE 120' -0" A B FINISH FLOOR 100' -0" MEZZANINE 110' -0" EAVE 120' -0" 1 2 1 A-3.0 2 A-3.0 PROFESSIONAL SEAL PROJECT NAME:PLOT DATE: JOB NO: DATE: DRAWN BY: SHEET NUMBER: COPYRIGHT ALL RIGHTS RESERVED. THIS DRAWING AND ALL INFO. CONTAINED HEREIN, IS THE PROPERTY OF ARCHITECTURE DESIGNS PLUS P.A., AND MAY NOT BE REUSED WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT 4/16/2021 12:36:28 PMAIR FILTER SUPERSTOREBOISE, ID 83713569 N. CLOVERDALE RD.SECTIONSA-3.0 BPB Project Number 04/16/21NO.REVISIONSDATE1" = 10'-0"1 SECTION A 1" = 10'-0"2 SECTION B 1/8" = 1'-0"3SECTION C