HomeMy WebLinkAboutVallivue Academy Master Plan_SitePlan_2024-04-17F
GMTR
XXEPEPXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
XXXXXXXXXXXXXXXXXX XXX X XXXX XXXXXEPEPEPEPXXXXXXXXXXXXXX30'
F
IVIV
IVIVIV
IV
IVIVIV
IV
IVIV IV IV IV IVIV
IV
IV
IV IVGMTR
FO
M
B
M
B
FOMBMBMBMBBOLBOLBOLBOLBOLBOLFPFF:2428.2'FF:±2428.2'FF:2425.6'FF:2426.6'FF:2427.1'G
M
T
R
IV IVIVIV
TT
T
T
TT TTTT T
TXX WMTR WV
W
V
WW
WVWWV
W
WW
W
WVBFPW W IRRMODULARCLASSROOMEXISTING BUILDINGEXISTING BUILDING
EXISTING BUILDINGMODULARCLASSROOM
MODULARCLASSROOMASSEMBLY BUILDINGEXISTING BUILDINGTYP.OF 9TYP.OF 9TYP. OF 9TYP. OF 91.22.32.22.12.44.14.14.1566555Overall Programing Keynotes:CALLOUT NUMBERS COORDINATEDTO NUMBERED NOTES BELOW.Fence Legend:6' CHAIN LINK FENCESYNTHETIC TURFMaterial Legend:LARGE BOULDERS,3'-4' DIA. TYP.EXISTING CHAIN LINK FENCEDECIDUOUS TREEEVERGREEN TREE·THREE (3) NEW MODULAR CLASSROOM BUILDINGS·ONE LARGE MULTI-USE ASSEMBLY BUILDING (4,000SF):§CAPABLE OF ASSEMBLY OF 200- 1,400 SF§2 CLASSES OF 30 STUDENTS- 1,800 SF§100 STUDENT LUNCH AT TABLES- 1,500 SF§CATERING KITCHEN- 1,000 SF§STORAGE SPACE- 250 SF§COMMERCIAL BATHROOM- 480 SF·PARKING:··32 STALLS CURRENT ( 4 ADA)··9 STALLS BEING DEMOED (2 ADA)··24 NEW SPOTS PROPOSED (3 ADA)··47 TOTAL STALLS (5 ADA)·PATHWAYS·OUTDOOR AMENITY SPACE: GRASS, BENCHES, “QUAD”·ACTIVE SPACE1.STEEL STRUCTURE1.1.CANTILEVER SHADE STRUCTURE1.2.SQUARE STRUCTURE2.ACTIVE SPACE2.1.ACCESSIBLE HAND CYCLE2.2.RECUMBENT BICYCLE2.3.BASKETBALL BALL COURT2.4.MURAL WALL3.OUTDOOR CLASSROOM3.1.FLEXIBLE SEATING3.2.WHITE BOARD3.3.SCREEN WALL4.BENCH SEATING4.1.CANTILEVER BENCH4.2.FREE STANDING BENCH5.ACCESSIBLE OUTDOOR TABLE6.BIKE RACK#Horizontal Scale: 030'60'1" = 30'Site PlanFile Location:g:\2024\124008\cad\_exhibit\124008 ex site plan.dwgLast Plotted By:kira wiseDate Plotted:Tuesday, April 9 2024 at 08:42 AM
04/09/24Vallivue Academy
Vallivue School District No. 139
5207 S. Montana Avenue
Caldwell, ID 83607 124008EX1Site PlanRevisions1.Date of Issuance:Project No.:Project Milestone:----1CONSTRUCTIONNOT FOR