Loading...
HomeMy WebLinkAboutShadow Glen_ITD_2020-10 IDAHO TRANSPORTATION DEPARTMENT P.O. Box 8028 • Boise, ID 83707-2028 (208) 334-8300 • itd.idaho.gov Page 1 of 1 October 2, 2020 Eric Scheck Hayden Homes escheck@hayden-homes.com VIA EMAIL RE: Shadow Glen Subdivision – ITD Development Condition Memo Dear Mr. Check, I really appreciate the work you are doing to help those who are living in this beautiful area of Caldwell, ID. The Shadow Glen Subdivision Traffic Impact Study (TIS) provided by CR Engineering has been reviewed. The trips generated by your development adds congestion to US 20/26. ITD is working with the city of Caldwell to enter into an agreement to collect a proportionate share contribution from each new development for impacts to the State highway system. As two agencies we will work together to accelerate highway construction on US 20/26 to accommodate new development growth. ITD values your contribution to the transportation system so we can help keep goods, services and the public moving efficiently. ITD determined Shadow Glen Subdivision’s proportionate share contribution to be $373,512 (2.3%). This is based off the development’s site trips through the intersection of US 20/26 and Middleton Road in comparison to total 2040 traffic volumes. The US 20/26 Corridor plan has identified that the future intersection configuration shall be a half- continuous flow intersection. Details of the proportionate share calculation are included in the attached ITD Staff Technical Report. Thank you again for your partnership. If there are any questions or concerns please don’t hesitate to email me at Justin.Price@itd.idaho.gov or give me a call at 208-334-8340. Sincerely, Justin Price Justin Price ITD District 3 Traffic Engineer Cc: Deb Root – City of Caldwell Page 1 of 17 Staff Technical Report 9/25/2020 10/2/2020 REVISED Development: Shadow Glen Subdivision Lead Agency: City of Caldwell Deb Root Senior Planner droot@cityofcaldwell.org Phone: 208-455-4662 Location: South of US 20/26 at the NE corner of Ward Road and Linden Road. US 20/26 MP 27.25 Applicant: Eric Scheck Hayden Homes escheck@hayden-homes.com Consultant: Chhang Ream CR Engineering 181 East 50th Street Garden City, ID 83714 Rbeckman@whpacific.com Phone: 208-275-8715 Staff Contact: Erika Bowen Traffic Technical Engineer Erika.Bowen@itd.idaho.gov Phone: 208-265-4312 ext. #7 Page 2 of 17 Traffic Findings for Consideration 1. Proposed Development The proposed Shadow Glen Subdivision includes 257 single-family homes, a gym and daycare center. The expected buildout is 2026. 2. Vicinity Map 3. Trip Generation: Page 3 of 17 4. Trip Distribution: 5. Traffic Impact Study Dated: January 3, 2020 a. Executive Summary CR Engineering prepared a traffic impact study for the proposed Shadow Glen Subdivision. Below is an executive summary of the findings as presented by CR Engineering. The following executive summary is not the opinion of ITD staff. ITD Staff has reviewed the submitted traffic impact study for consistency with ITD policies and practices and may have additional and/or varied requirements beyond what is noted in the summary. Page 4 of 17 Page 5 of 17 Page 6 of 17 6. ITD Policy Review a. Proportionate Share Contribution ITD District 3 has issued Memo 39-Development Proportionate Share Contribution as a means to request equitable contribution from developers to improve public facilities needed to serve new growth and development. Page 7 of 17 b. Jurisdictional Authority ITD does not have jurisdictional authority to require improvements from the developer. A formal letter of request will be sent to the City of Caldwell requesting them to include any mitigation to the State highway system in their development agreement. 7. Staff Comments Recommendations Intersection of US 20/26 and Ward Road The Shadow Glen TIS shows that the intersection of US 20/26 and Ward Road has failing movements and v/c ratios exceeding 0.90 at 2026 buildout (AM and PM Peak) for specific movements. The overall intersection operates at a LOS B. Analysis included improvements that are to be constructed by ITD’s project: KN 22165 Smeed to Middleton Widening. See Appendix A. The deficient movements are eastbound left, westbound left, northbound right and southbound right. KN 22165 is building out US 20/26 to the ultimate configuration of the US 20/26 corridor. See Strip Map image below. The eastbound left and westbound left turning movements show a 95th percentile queue length of 46ft (AM) / 86ft (PM) and 116ft (AM) / 128ft (PM), respectively. The turn bays can accommodate these storage lengths. See Appendix B and C for details. Staff does not recommend requesting proportionate share for any mitigation improvements at the intersection of existing US 29/26 and Ward Road. Intersection of US-20/26 and Middleton Road The Shadow Glen TIS shows that the intersection of US 20/26 and Middleton Road has failing movements and v/c ratios exceeding 0.90 at 2026 buildout (AM and PM Peak) for specific movements. The overall intersection operates at a LOS D. Analysis included improvements that are to be constructed by ITD’s project: KN 22165 Smeed to Middleton Widening. See Appendix A. The deficient movements are eastbound left, southbound left, northbound thru. KN 22165 is only partially widening the US 20/26 and Middleton Road intersection. ITD estimated the design and construction costs of a half-continuous flow intersection to be $16,239,692. See attached estimate in Appendix D. Page 8 of 17 2026 Site Traffic (Original TIS Traffic Volumes) *Per Chhang Ream’s email. ITD shall use 168 PM Peak hour trips through the US 20/26 and Middleton Road intersection to calculate proportionate share. AM PM Page 9 of 17 2040 Total Traffic (KN 07826…Only PM totals analyzed in study) Staff recommends the developer pay a total proportionate share of $373,512 (2.3%) towards future CFI improvements at the intersection of US 20/26 and Middleton Road. Proportionate share needs to be provided prior to occupancy of the development. *ITD Staff Recommendations are intended to assure that the proposed development will not place an undue burden on the existing State Highway system within the vicinity impacted by the proposed development. ** Recommendations included in ITD’s Staff Technical Report along with any development conditions (see associated Permit Committee Agenda/Minutes) is only valid for the period of one year from the date of the TIS report. ITD reserves the right to request an updated TIS to reflect current traffic conditions if an approved encroachment application and/or proportionate share contribution are not obtained/provided within one year. 8. Appendices Appendix A 2026 Buildout Year Total Traffic Appendix B 2026 Buildout Ward Road HCM Analysis Appendix C KN 22165 Ward Road Preliminary Pavement Striping Plans Appendix D Cost Estimate: Middleton Road and US 20/26 Half-CFI PM Site = 168 PM Total = 7,343 PM % = 2.3 Proportionate Share for US 20/26 and Middleton Road half-CFI Intersection Improvements Avg % = 2.3 Page 10 of 17 Appendix A 2026 Buildout Year Total Traffic Page 11 of 17 Page 12 of 17 Appendix B 2026 Buildout Ward Road HCM Analysis Page 13 of 17 Page 14 of 17 Appendix C KN 22165 Ward Road Preliminary Pavement Striping Plans Page 15 of 17 Page 16 of 17 Appendix D Cost Estimate: Middleton Road and US 20/26 Half-CFI Page 17 of 17