The Engineering Department provides the following comments on a request by Mason &
Associates, on behalf of North 44 Idaho LLC., is requesting approval of a Comprehensive Plan
Amendment (CPM22-000005) on the subject parcel from HC (Highway Corridor) to a future land
use designation of CS (Commercial & Service) along Hwy 55 on the northern portion and a
MDR (Medium Density Residential) future land use designation on the southern portion of the
subject parcel. The request includes a proposed rezone (ZON22-000008) from R-1 (Low
Density Residential) to a split zone of C-2 (Community Commercial) on the northern portion and
R-2 (Medium Density Residential) on the southern portion of the parcel. Concurrently, the
applicant is requesting approval for a Planned Unit Development (PUD22-000007) and
Preliminary Plat (SUB22-000027) for West Haven Subdivision, a 55+ mixed-use community with
commercial and residential housing options and amenities, to include approval to amend an
existing Development Agreement (DA-05-07) (AMD-22-04) to change the zoning, allow for
commercial development opportunities, allow for residential densities of 5.86 units per acre, and
to add any additional conditions specific to the new proposed development plan. Additionally,
the applicant is requests a Special Use Permit (SUP22-000019) to allow for an assisted living
facility within the requested C-2 (Community Commercial) zone. West Haven is proposed to be
constructed in a single phase and will include 221 residential lots, two commercial lots, and 26
common lots. The subject property is located at the southwest corner of Karcher Road and S.
Florida Avenue, parcel number R3284200000, Caldwell, Idaho.
Should the Hearing Examiner/Planning & Zoning Commission advance the application,
the Engineering Dept. recommends the following items, as listed in the staff report, be
listed as conditions of approval:
Street Section, #4
West Haven Subdivision
CPM22-000005 / ZON22-000008 / SUP22-000019 / PUD22-000007 / SUB22-000027 /
AMD-22-04
Page 2 of 9
Development Plans
1. Development Plans – Prior to commencing construction and applying for building permits,
plans must be prepared by the developer’s engineer and approved by the City Engineering
Department which shall include the following items:
a. Street section and alignment (including curb and gutter);
b. Sidewalk (sidewalk width based on street classification);
c. Sanitary sewer (per City and DEQ requirements);
d. Potable water (per City and DEQ requirements);
e. Stormwater facilities (per City requirements/storm water manual);
f. Street lighting (per City standards);
g. Street signage (per City and MUTCD requirements);
h. Vertical Datum based on NAVD 88 Datum.
General
1. Easements for public utilities shall be as listed below. Easements will be required to be larger if
deemed necessary by the City Engineer in order to facilitate future maintenance operations of
utilities.
a. 10 feet wide minimum.
b. Domestic water only,15 feet wide minimum
c. Sanitary sewer only, 20 feet wide minimum
d. Sewer and water combined, 30 feet wide minimum
i. Note: future permanent structures will not be permitted to be constructed
within any easement granted to the City of Caldwell. Applicant shall
ensure that civil design and easements provided to the City
accommodate current and future construction needs of permanent
structures such as covered parking structures, future buildings, etc.
2. Appropriate easements for emergency access, transmission lines and/or other utilities shall be
clearly indicated, with recorded instrument numbers provided for said easements, on the
construction drawings.
3. All utilities on and within the boundaries of the subdivision shall be located and/or relocated
underground.
4. All street, sewer, water, fire protection, and street light facilities must be dedicated to the City.
Some conveyance facilities for stormwater drainage may be eligible for dedication to the City.
West Haven Subdivision
CPM22-000005 / ZON22-000008 / SUP22-000019 / PUD22-000007 / SUB22-000027 /
AMD-22-04
Page 3 of 9
5. Construction of facilities to be dedicated and/or within public right-of-way shall be performed by
an appropriately licensed public works contractor and shall be inspected by and constructed to
City of Caldwell specifications.
6. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre-construction
conference scheduled by the engineer of record in which all appropriate personnel and utilities
are present. Appropriate City personnel are to be notified in advance of all testing (including
compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of
the testing. The engineer of record or his designated representative is to witness all tests (not
covered by City inspectors) and a log of inspection visits and testing results is to be kept by the
engineer of record or his representative.
7. The developer is to employ a responsible design professional, preferably the engineer of
record, to oversee and inspect construction, to perform and/or observe all requisite testing of
completed facilities, and to certify that improvements have been constructed according to
approved plans and in compliance with applicable City, State, and Federal standards.
8. The engineer of record shall be held responsible to ensure that subdivision improvements are
in compliance with said engineer’s design. Following the construction of the subdivision
improvements, the developers engineer shall provide the City of Caldwell Engineering
Department with electronic (.dwg) format record drawings spatially referenced to the Idaho
State Plane Coordinate System-West Zone, North America Datum (NAD) 83. Vertical control
shall be referenced to the North America Datum (NAVD) 88 for future reference and to
establish that the engineer of record has caused construction to occur in substantial
compliance with the design of said engineer of record.
9. Any note, item or drawing element on the plats, construction drawings, engineering drawings
and/or design drawings related to the property inconsistent with City Codes, Policies and/or
Ordinances shall not be construed as approved unless specifically addressed and granted by
City Council.
Rights-of-Way
1. S. Florida Ave. is classified as a Collector. The applicant shall dedicate as public right-of-way a
minimum Thirty-five (35’) foot half width right-of-way (from centerline/section line) along the
entire S. Florida Ave. alignment (per City Standard R-810 C).
2. State Highway 55 is an expressway owned by the Idaho Transportation Department (ITD).
Applicant shall work with ITD directly to establish the required right-of-way along the
frontage of the subject parcel and shall provide said right-of-way to ITD upon approval of
this development. Applicant shall provide the City with written documentation outlining all
ITD requirements prior to the City Council meeting.
3. All internal roadways classified as Residential shall have a minimum fifty-three (53) foot full
width right-of-way (per City Standard R-810E).
West Haven Subdivision
CPM22-000005 / ZON22-000008 / SUP22-000019 / PUD22-000007 / SUB22-000027 /
AMD-22-04
Page 4 of 9
Street
1. Full street improvements shall be completed to all classified roads adjacent to the proposed
project (including S. Florida Ave. and State Highway 55) in accordance with all City of Caldwell
standards and specifications. Improvements shall include (but are not limited to) curb, gutter,
sidewalk, asphalt, streetlights, joint trench, spare communication conduit along classified
roadways, storm drainage facilities, etc.
2. Emergency access, including secondary access, shall meet all Caldwell Fire Department
requirements.
3. Applicant is proposing to construct an offsite access on the southwest corner of the project to
S. Georgia Ave. and shall provide necessary right-of-way to construct said roadway to meet the
requirements of R-810E from the adjacent outparcel to the west prior to submission of civil
construction drawings.
4. The northern approach to this site onto S. Florida at the time of this staff report does not align
with Generations Ln. located on the east side of Florida Ave., creating a turning conflict
between the developments. Said access point shall have 150’ spacing, near edge to near
edges, from Generations Lane.
a. Per the TIS for this site the northern most approach to this site could be reduced to
a right in right out only at full build out of Hwy. 55 (Karcher Rd.) due to the proximity
of this access to Hwy 55 (Karcher Rd.).
5. All private driveways/drive aisles shall fully comply with City of Caldwell standards and be
approved by the Caldwell Fire Marshall, including but not limited to, having a minimum width for
26’ (or meeting Caldwell Fire Department requirement, whichever is greater).
6. No lot/building shall have direct access to/from State Hwy 55 or S. Florida Ave.
7. Applicant shall extend the west half of the bridge understructure and complete the surface
improvements where the Phyllis Canal crosses S. Florida Ave.
8. Provide northbound left turn lanes on Florida at both development access roadways on to S.
Florida Ave. (per the TIS)
9. All proposed future roadways within this development to be dedicated to the City shall be
constructed (per City Standard R-810E)
Outparcels
1. 15815 S. Florida Ave. (R3284300000)
a. If the City is able to obtain sufficient right-of-way along the frontage of this out parcel
located in the southeast corner of the development the applicant shall complete the road
widening improvements referenced in the Street section, item 1 across the S. Florida
West Haven Subdivision
CPM22-000005 / ZON22-000008 / SUP22-000019 / PUD22-000007 / SUB22-000027 /
AMD-22-04
Page 5 of 9
Ave. frontage of said out parcel If the City is not able to acquire the right-of-way, lesser
improvements may still be required that fall within the prescriptive right-of-way on the out
parcel.
2. 15769 S. Florida Ave. (R3284500000)
a. If the City is able to obtain sufficient right-of-way along the frontage of this out parcel
located on the northwest of the development the applicant shall complete the road
widening improvements referenced in the Street section, item 1, across the S. Florida
Ave. frontage of said out parcel. If the City is not able to acquire the right-of-way, lesser
improvements may still be required that fall within the prescriptive right-of-way on those
out parcels.
3. 15753 S. Florida Ave. (R3284400000)
a. If the City is able to obtain sufficient right-of-way along the frontage of this out parcel
located on the northwest of the development the applicant shall complete the road
widening improvements referenced in the Street section, item 1, across the S. Florida
Ave. frontage of said out parcel. If the City is not able to acquire the right-of-way, lesser
improvements may still be required that fall within the prescriptive right-of-way on those
out parcels.
Traffic Mitigation
The following are the required traffic related mitigation measures for the West Haven
Subdivision resulting from the traffic impact study pursuant to City Code Chapter 10, Article 10.
A traffic impact study will be required for this development because of the volume of traffic
produced.
1. Provide a cross-access easement allowing use of approaches and cross-access of the site
by both onsite and adjacent development.
2. Provide northbound left turn lanes on Florida at both development access roadways on to S.
Florida Ave
3. Community Planning Association of Southwest Idaho has computed the average trip length
in Canyon County to be 7.3 mi. Traffic impact mitigation should presumably occur at both
trip ends so ½ of the trip length should be attributed to each end. It is estimated that trips will
encounter a major intersection every half mile along any given path. The capacity of an
average fully improved intersection (assumed to be the intersection of a collector and an
arterial road) is estimated to be 5,080 vehicles/hour.
The estimated traffic resulting from the proposed density in this subdivision based on the
most current Traffic Impact Analysis sets the pm peak hour traffic flow at vehicles for the
entire subdivision.
Following the City of Caldwell’s mitigation equation ((230 veh/hr*7.3 mile/trip*0.5 trip
ends*2inter/mi) / (5080veh/hr)) the total contribution of this development to traffic
mitigation shall be 33% of a fully improved intersection. This percentage represents the
West Haven Subdivision
CPM22-000005 / ZON22-000008 / SUP22-000019 / PUD22-000007 / SUB22-000027 /
AMD-22-04
Page 6 of 9
total capacity utilized from each intersection (once fully improved and possibly
signalized) encountered by trips generated over the development’s half of the generated
trip length.
a) The owner/developer/applicant shall design and construct roughly 33% of the
signalization improvements needed for an average intersection, as defined, at one or
more nearby (within 3.5 miles of the site) deficient locations to be determined by
Engineering staff. The Engineering staff shall have reasonable discretion to determine
the sites of construction and what design and construction equals roughly 33% of the
signalization improvements needed for an average intersection. Engineering staff can
provide information about applications with whose mitigation efforts the
owner/developer/applicant can combine to achieve even units of 100%.
i) The owner/developer/applicant may be allowed, at his option, to contribute monies in
lieu of construction to the City of Caldwell Roadway Trust Fund, but the basis for the
obligation is for construction. Monetary contributions must be made at a level
commensurate with costs to construct the same by the City and as estimated by the
City. This alternate provision for payment of money is not a requirement, is for the
benefit and convenience of the owner/developer/applicant only and does not
constitute an Impact Fee.
ii) The average cost of intersection is estimated at $425,000 for procurement of
design services, construction, and associated costs by the City, of which 33% of that
cost is what needs to be covered by this subdivision.
Water
1. All on site water mains will need to be looped into existing mains and have a minimum of two
points of connection for fire flow and water quality purposes. Internal main sizing and
construction plan approval, will be dependent upon the availability of fire flow.
2. Each buildable lot or building shall be supplied with potable water. If buildings are constructed
to include individual units that could feasibly or will be sold separately, each unit shall be
serviced separately
3. The location of water service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans.
4. This development shall construct any master planned domestic water lines that reside within or
adjacent to this site to be determined during the review of the improvement plans.
Sanitary Sewer
1. It shall be the responsibility of the applicant’s engineer to verify that connection to existing sewer
mainlines will not exceed the functional capacity of said mainlines. Provision for connectivity by
future developments shall be met in accordance with current City standards.
West Haven Subdivision
CPM22-000005 / ZON22-000008 / SUP22-000019 / PUD22-000007 / SUB22-000027 /
AMD-22-04
Page 7 of 9
2. The location of sewer service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans. This
development will be required to install the trunk lines specified within the most current version of
the applicable Sewer Study that reside within the limits of this development.
3. Each buildable lot or building shall be provided with individual sewer service. If buildings are
constructed to include individual units that could feasibly or will be sold separately, each unit shall
be serviced separately.
4. The Developer will be required (where applicable) to extend all sewer and water mainlines to the
center of adjacent roadways for connectivity by future developments. Locations of said
extensions will be decided during the review of the improvement plans.
5. Any easements for sewer lines not in the right-of-way should be at a width sufficient to construct
same and not less than 20 feet in width. Easements for adjacent sewer and water lines not in the
right-of-way shall be at a width sufficient to construct the same and shall be no less than 30 feet
in width.
6. A 20’ wide all-weather surfaces may be required to be constructed over mainlines that fall outside
the public right-of-way. All weather surfaces shall be constructed sufficiently to support heavy
equipment necessary to construct and maintain sewer under all seasonal weather conditions.
Irrigation
1. Existing easements and/or right-of-ways for any irrigation facility shall be determined and
clearly indicated on the construction plans. Construction across or re-routing of these
facilities is subject to approval by the Governing Irrigation District and at their discretion or
their assigns.
2. The Developer shall maintain any existing upstream drainage rights and downstream
irrigation rights across the property. During the design phase of this project, the developer
or his engineer is to contact the appropriate irrigation district to help ascertain these rights.
Appropriate facilities shall be provided by the developer to convey irrigation and drainage
water across the property to take care of these offsite needs. There is to be no discharge
of gravity/pressure irrigation return water into the projects storm water system.
3. The development is to include a non-potable water pressure irrigation system. The design
of this pressure irrigation system is to be reviewed and approved by the Caldwell Municipal
Irrigation District prior to construction plan approval. It shall be required that the system will
be operated and maintained by the Caldwell Municipal Irrigation District.
4. Each lot, or building area, shall be provided with a pressure irrigation service in compliance
with Caldwell Municipal Irrigation District standards and City code.
West Haven Subdivision
CPM22-000005 / ZON22-000008 / SUP22-000019 / PUD22-000007 / SUB22-000027 /
AMD-22-04
Page 8 of 9
5. All pressure irrigation mainlines shall be located in the public right-of-way or private drive
isle within a public utility easement, with a minimum width of 10 feet, centered over said
mainlines as per current City standards.
6. If required applicant shall place the pump station in an area that is easily accessible with a
recorded perpetual easement sufficient for convenient access and maintenance of said
pump station. The lot the pump station is positioned on shall be owned and maintained by
the property owner, a homeowners' or business owners' association.
7. The applicant shall ensure that an adequate continuous irrigation supply flow is available
to meet the pressure irrigation system requirements of CMID.
8. The applicant shall transfer a proportionate share of any existing water right(s), except
those held in trust by an irrigation district, to the City of Caldwell for both irrigation and
domestic water supply for the subject development. If this should occur, The City shall
assist in registering the transfer.
9. All plans and construction drawings submitted to the City of Caldwell for review and
approval for any out-of-season irrigation work to be performed within or across facilities
located within (or owned by) irrigation districts other than CMID shall be submitted to the
Caldwell Engineering Department no later than August 15th. Submittal of plans after this
date may result in Applicant not receiving plan approval in time to complete out-of-season
work.
Storm Drain
1. As noted previously, provision is to be made for the disposal of stormwater drainage in
accordance with the City Stormwater Management Manual and any updates adopted
subsequent to this application. It is to be noted that retention designs will be denied in most
instances. A copy of this policy is available upon request. The engineer of record is to
provide calculations, which indicate that the assumptions in his stormwater drainage plan
comply with the requirements of the stormwater manual. In this case, if a storm water
system is existing, the burden of proof is on the developer to verify the capacity is sufficient
for the proposed development.
2. The applicant shall identify and retain all historical drainage discharge points from the
property for the purpose of draining on-site storm water detention facilities.
3. The applicant shall retain all historic upstream and downstream storm water discharges
and shall not create any adverse impacts pertaining to gravity irrigation water or storm
water runoff to the neighboring properties.
4. Storm water detention basins are required to remain on-site and are to be operated and
maintained by the property owner, a homeowners' or business owners' association.
5. There is to be no discharge of storm water overflow into any irrigation water
return/discharge facility/ditch/pipe/etc.
West Haven Subdivision
CPM22-000005 / ZON22-000008 / SUP22-000019 / PUD22-000007 / SUB22-000027 /
AMD-22-04
Page 9 of 9
Building Permits
1. Prior to submission of building permits, public utilities and infrastructure must be completed or
an appropriate construction security provided. A 20% temporary restriction in the issuance of
building permits will be enforced until all utility construction has been completed, inspected,
tested, approved by the City and certified by the applicants engineer; including completion of all
punch list items.
2. Applicant shall submit an electronic (dwg.) copy of the project site plan suitable for mapping
and addressing purposes no later than 30 days prior to submission of the first building permit.