Loading...
HomeMy WebLinkAboutAD24-000004_Solstice Subdivision (2) May 2, 2024 Pontifex Capital, LLC 1775 W. state St. #259 Boise, ID 83702 lee@pontifexcapital.com RE: Administrative Determination AD24-000004 – 3411 Solstice Subdivision Dear Mr. Gientke, I have reviewed your request for administrative approval of the minor plat changes proposed for Solstice Subdivision. The minor changes include removal of an alley, to convert the 40-foot wide lots from rear access to front access, clarifying a footnote, adjusting a secondary access easement location to accommodate requirements from the Fire Department, and modifications to the landscape and amenity plan. The proposed changes to the landscaping plan include relocating the 6 foot pathway along the north edge of the park slightly to the south to accommodate additional landscape screening between the pathway and the rear yards to the north. The City’s PUD code requires four amenities and the applicant’s four required amenities of a basketball court, energy-star certified housing, a playground/tot lot, and rear entry garages are not proposed to change. The DA included a 5th amenity of tennis courts, however, the applicant had never included tennis courts in any of the original plans and the applicant is proposing to remove the tennis court from the required amenities as it was included in error. They are also proposing to reduce the proposed two pickleball courts to one pickleball court, and removing the barbeque and ramada with picnic tables. The trellis, bench seating, bike racks, pathways, youth sports field, and sundial art piece are still proposed to remain as additional amenities well as No changes are proposed to the number of residential lots or density, minimum lot sizes or percentage mix of lot types, required off street parking, commercial use or lot, open space provided, four code required amenities, phasing, or project timing. After review by the planning, engineering, and fire departments, I find that the request for minor plat changes do not significantly change the intent of the approved preliminary plat and are hereby approved. Please note that construction drawings and final plat approvals will still be required and any conditions by building, fire, and engineering will still need to be met. Sincerely, Morgan Bessaw, AICP, CFM Deputy Director City of Caldwell Planning and Zoning 621 Cleveland Blvd. Caldwell, ID, 83605