HomeMy WebLinkAboutArrowrock_ChecklistCommunities in Motion 2050 Development Review
The Community Planning Association of Southwest Idaho (COMPASS) is the metropolitan planning organization (MPO) for Ada and Canyon Counties. COMPASS has developed this review as a tool for local governments to evaluate whether land developments are consistent with the goals of Communities in Motion 2050 (CIM 2050), the regional long-range transportation plan for Ada and Canyon Counties. This checklist is not intended to be prescriptive, but rather a guidance document based on CIM 2050 goals.
Development Name:
CIM Vision Category:
CIM Corridor:
Safety
Level of Stress measures how
safe and comfortable a bicyclist
or pedestrian would feel on a
corridor and considers multimodal
infrastructure number of vehicle
lanes, and travel speeds.
Pedestrian level of stress
Bicycle level of stress
Economic Vitality
These tools evaluate whether the
location of the proposal supports
economic vitality by growing near
existing public services.
Activity Center Access
Farmland Preservation
Net Fiscal Impact
Within CIM Forecast
ConvenienceResidents who live or work less than 1/2 mile from critical services have more transportation choices, especially for vulnerable populations.
Nearest bus stop
Nearest public school
Nearest public park
Quality of LifeChecked boxes indicate that additional information is attached.
Active Transportation
Automobile Transportation
Public Transportation
Roadway Capacity
New Jobs:
Improves performance
Comments:Communities in Motion 2050
2020 Change in Motion Report
Development Review Process
Web: www.compassidaho.org
Email: info@compassidaho.org
New Households:
Reduces performanceDoes not improve or reduce performance
Bicycle and Pedestrian Infrastructure
An individual’s trip is the entire journey from beginning to end. In many cases, a trip may combine a
number of modes. While motorized vehicles will provide longer trips, users complete the first and last
portion on their own. For example, almost every vehicle trip includes a walk or bike trip to the parking lot
or transit stop. Good street connectivity increase the number of travel options and reduces the distances
traveled to reach destinations. One way to measure route directness is take the ratio of the route distance to the straight line-distance. The closer the ratio is to 1, the better for connectivity of the area. Some steps that can be taken to improve walk/bike infrastructure include:
Providing sidewalks, crosswalks, and micropaths to connect
destinations
✓ Providing an improved pathway along a canal as a transportation and recreational option
Siting pathways and sidewalks as directly as conditions
allow or provide wayfinding signs
Reducing street lengths to discourage speeding on local roads
Providing sufficient and covered bike parking near
destinations
Fiscal Impact Analysis Supplemental for the
Development Review Checklist
The purpose of the fiscal impact analysis is to better estimate expected revenues and costs to local
governments as a result of new development so that the public, stakeholders, and the decision-
makers can better manage growth. Capital and operating expenditures are determined by various
factors that determine service and infrastructure needs, including persons per household, student
generation rates, lot sizes, street frontages, vehicle trip and trip adjustment factors, average trip
lengths, construction values, income, discretionary spending, and employment densities.
The COMPASS Development Checklist considers the level of fiscal benefits, how many public agencies
benefit or are burdened by additional growth, and how long the proposal will take to achieve a fiscal
break-even point, if at all. More information about the COMPASS Fiscal Impact Tool is available at:
www.compassidaho.org/prodserv/fiscalimpact.htm.
Overall Net Fiscal Impact
Net Fiscal Impact, by Agency
City
Highway District
Break Even:
County
School District