Loading...
HomeMy WebLinkAboutArbor phase 5 - Final Plat Memo 7.14.2022Memorandum To: Emma Hill, Associate Planner From: T.J. Frans – Project Manager Ky Corder – Land Development Inspector Re: Arbor Subdivision Phase 5 (SUB22-000035) Date: July 14, 2022 The Engineering Department has reviewed the proposed final plat for Arbor Subdivision Phase 5 and provides the following comments regarding the project and the submitted final plat: The following items must be completed before signing of the final plat. These items cannot be bonded for: The water system is not operational. The water system has been constructed but not pressure tested. Clean water samples have not been received. The final plat will not be signed, and no certificates of occupancy will be issued until this emergency requirement is complete. All weather surfaces are not in place. Compaction test and core sample results have not been submitted, reviewed or approved for the roadways. The final plat will not be signed, and no certificates of occupancy will be issued until this emergency requirement is complete. Street signs have not been installed. The final plat will not be signed, and no certificates of occupancy will be issued until this emergency requirement is complete. The sewer system is not operational. The sewer system has been constructed but not pressure tested and video has not been submitted or approved. Interim as-builts have not been approved. The final plat will not be signed, and no certificates of occupancy will be issued until this emergency requirement is complete. The pressure irrigation system within the public roadway is not operational. The pressure irrigation system has been constructed but not pressure tested. The final plat will not be signed, and no certificates of occupancy will be issued until this emergency requirement is complete. The storm drain system located within the public roadway is not operational. The storm drain system has been constructed and passed a visual inspection by the City. Interim as-builts have not been approved. The final plat will not be signed, and no certificates of occupancy will be issued until this emergency requirement is complete. Construction security will have to be provided for those items which are not among the items listed above and not yet completed prior to signing of the final plat. The City has not agreed on a bond amount for those improvements not yet constructed. The final plat drawing has been submitted to the City of Caldwell and has been reviewed but not yet approved. The final plat drawing will have to be done in accordance with City codes, policies, and ordinances prior to the City signing the final plat. In an effort to expedite the addressing process of the final plat, the Engineering Dept. requests an electronic copy in AutoCAD format be returned with a revised full set bound copy of the final plat.