Loading...
HomeMy WebLinkAboutFinal Plat Memo_Passero 3_OCT 262023 _Caldwell Engineering Dept. Final Plat Memo Page 1 of 2 City of Caldwell: Engineering Department Memorandum To: Morgan Beesaw - Caldwell Planning & Zoning; Deputy Director From: TJ Frans - Caldwell Engineering Department; Project Manager II Jeremy Crowhorn - Caldwell Engineering Department; Land Development Inspector Re: Passero Ridge Subdivision, Phase No. 1 (SUB23-000030) Date: October 26, 2023 The Engineering Department provides the following comments concerning the final plat for the above referenced development: 1. The following items shall be completed prior to the City Engineer signing the final plat. Said items cannot be deferred by posting a financial security: a. The water system not operational. The water system has been constructed and pressure tested. Clean water samples have not been received. The final plat cannot be signed until this emergency requirement is complete. b. The sewer system is not operational. The sewer system has been constructed and pressure tested and CCTV video have been submitted and approved. Interim as-builts have been approved. The sewer lift station at this time is not operational. The final plat cannot be signed until this emergency requirement is complete. c. The pressure irrigation system within the public roadway is operational. Said portion of the pressure irrigation system has been constructed and pressure tested. d. The storm drain system located within the public roadway is operational. Said portion of the storm drain system has been constructed and has passed a visual inspection by the Engineering Dept. inspector. Interim as-builts have been approved. e. All weather surfaces are in place. Compaction test results have been submitted for the roadways and core sample results have been submitted and approved. f. Street signs have been installed. 2. Construction security (compliant with current City Code requirements) must be provided for all items which are not among the items listed above, and which are not yet completed before the Caldwell Engineering Dept. Final Plat Memo Page 2 of 2 City Engineer can sign the final plat. The City has agreed on a construction security amount for those improvements. 3. The final plat drawing has been submitted to the Engineering Department for review. Said drawing must be completed in accordance with City codes, policies, and ordinances prior to signing the final plat. 4. In an effort the expedite the addressing process of the final plat, Applicant shall submit electronic copies of the final plat, in AutoCAD format, to the Engineering and Mapping departments as soon as possible.