Loading...
HomeMy WebLinkAbout08 28 2023 Punch List Items Passero Ridge Phase 1CANYON HIGHWAY DISTRICT NO. 4 15435 HIGHWAY 44 CALDWELL, ID 83607 TELEPHONE 208/454-8135 FAX 208/454-2008 August 28, 2023 City of Caldwell Engineering Department 621 Cleveland Blvd Caldwell, ID 83605 Attn: Robb MacDonald, P.E. ESE Consultants, Inc. 3103 W Sheryl Drive, Ste 100 Meridian, ID 83642 Attn: Justin Bozovich, P.E. RE: Passero Ridge, Phase 1 Construction Punch List – August 28, 2023 Walkthrough Dear Mr. MacDonald, Canyon Highway District No. 4 (CHD4) has performed a preliminary inspection of the public road improvements for Passero Ridge, Phase 1, and offers the following preliminary construction punch list from the site inspection conducted August 28, 2023: 1. Installation of all street signage as detailed below: a. Installation of type 2 barricades complete with ADA requirements at the end of the sidewalk. b. Installation of the OM3-R sign in place of the Type 3 barricade at the end of the paving improvements along western property limits. Barricade has been corrected to allow for visibility concerns for traffic exiting Mallard Park to the west and limit sight obstructions. 2. Provide copies of all reporting data for material testing along CHD4 right of way. This shall include all concrete, asphalt, ¾” road mix, pit run, and subgrade inspections. Additional punch list items may be identified in subsequent inspections as in conjuction with future inspections with city of Caldwell. Sincerely, Tyler Hannes Engineering Technician File: Subdivision – Passero Ridge, Phase 1