Memorandum
To
Re:
Robin Collins, Deputy Director
T.J. Frans - Project Manager
Ky Corder - Land Development Inspector @From:
Date:
Peregrine Estates Subdivision Phase 5 (SUB2l-000001)
October 13,2022
The Engineering Department has reviewed the proposed final plat for Peregrine Estates Subdivision Phase 5 and
provides the following comments regarding the project and the submitted final plat:
1. The following items must be completed before signing of the final plat. These items cannot be bonded for:
a. The water system is not operational. The water system has been constructed and pressure tested.
Clean water samples have been received.
b. All weather surfaces are in place. Compaction test and core sample results have not been submitted,
reviewed or approved for the roadways. The final plat will not be signed, and no certificates of
occupancy will be issued until this emergency requirement is complete.
c.Street signs have been installed.
d. The sewer system is not operational. The sewer system has been constructed, pressure tested and
video has been submitted and approved. Interim as-builts have been approved. The sewer lift station
is not operational. The final plat will not be signed, and no ceftificates of occupancy will be issued
until this emergency requirement is complete.
e. The pressure irrigation system within the public roadway is operational. The pressure irrigation
system has been constructed and pressure tested.
f. The storm drain system located within the public roadway is operational. The storm drain system
has been consffucted and passed a visual inspection by the City. Interim as-builts have been
approved.
2. Construction security will have to be provided for those items which are not ,rmong the items listed above
and not yet completed prior to sigring of the final plat. The City has not agreed on a bond amount for those
improvements not yet constructed.
3. The final plat drawing has been submitted to the City of Caldwell and has been reviewed but not yet
approved. The final plat drawing will have to be done in accordance with City codes, policies, and
ordinances prior to the City signing the final plat.
4. In an effort to expedite the addressing process of the final plat, the Engineering Dept. requests an electronic
copy in AutoCAD format be returned with a revised full set bound copy of the final plat.
Page I of I Qh'{
o o
Memorandum
To Robin Collins, Deputy Director
From: T.J. Frans - Project
Paul Braeger - Land
Date:
Peregrine Estates Subdivision Phase 5 (SUB2l-000001)
August 26,2022
Re:
The Engineering Department has reviewed the proposed final plat for Peregrine Estates Subdivision Phase 5 and
provides the following comments regarding the project and the submitted final plat:
1. The following items must be completed before signing of the final plat. These items cannot be bonded for:
a. The water system is operational. The water system has been constructed and pressure tested. Clean
water samples have not been received. The final plat will not be signed, and no certificates of
occupancy will be issued until this emergency requirement is complete.
b. All weather surfaces are in place. Compaction test and core sample results have not been submitted,
reviewed or approved for the roadways. The final plat will not be signed, and no certificates of
occupancy will be issued until this emergency requirement is complete.
Street signs have not been installed. The final plat will not be signed, and no certificates of
occupancy will be issued untilthis emergency requirement is complete.
d. The sewer system is operational. The sewer system has been constructed, pressure tested and video
has been submitted and approved. Interim as-builts have been approved.
The pressure inigation system within the public roadway is operational. The pressure irrigation
system has been constructed and pressure tested.
f. The storm drain system located within the public roadway is operational. The storm drain system
has been constructed and passed a visual inspection by the City. Interim as-builts have been
approved.
2. Construction security will have to be provided for those items which are not among the items listed above
and not yet completed prior to signing of the final plat. The City has not agreed on a bond amount for those
improvements not yet constructed.
3. The final plat drawing has been submitted to the City of Caldwell and has been reviewed but not yet
approved. The final plat drawing will have to be done in accordance with City codes, policies, and
ordinances prior to the City signing the final plat.
4. In an effort to expedite the addressing process of the final plat, the Engineering Dept. requests an electronic
copy in AutoCAD format be returned with a revised full set bound copy of the final plat.