August 21, 2003
Ciry of Caldwell Community Dcvclopment Scnrices
Fax: 455-3050
Re: Casc No- ZON-34-03 (Rezonc from singic farrrily to corm'nercial)
(Rrueell Smw)
TO WHOM TT MAY CONCERN
plcasc bc adviscd thcre is a delivcry point in place for the propcrty being proaoscd for dev'dopmcnt'
pioneer Inigation Disldct's rrain oo;Ecrn is ihat alt wslcr rigtrts witlin the Dirtrict bc hor.ored and
that access io inieation wetar bc providcd to evcry pucel of land. Delivery point for thiti poperty
is ttc 10il St, Lrttnl
All adsting Gsfertrstrtl, right of.ways, and othcr mcans ured to honor the warcr rights to
downstsearn *"t*rr"rt'ausi bc main-tainsd and allo*td to continuc to acist. It is impa'ative that
no oBe disrupt thc delivcry of warer to e doumstrEaE watcr user'
Any latcral, canal, drain or other ucans ued to delivsr welsr, along which tfre_is a dght'of'way
o, "rr..rrr, mut havc the samc kept clear of etl obEtructiotrs Bt all tifitcs. No fbnccs, :iElrctures.
or othEr marerials arq allowed ou any of the Distict's assemcnts or right-of-ruaysAND they must
be rcaordod on thp final plat Plsrrc bc edvircd tlrt irrigrtio[ llnct thrt rcrTe tbh property rre
privrte irigrtion lin:r.
Any discharge or ruD.off iato a fcdeffit drain rnust mcct the approval of Mr. John cayw,:od of the
Burcau of Rcclamariou Pioneer kridoa Oistrict does not as$Elc any resporu^ !b$W fi', sucb an
upprovaf. His telepbone uunbcr is 3i4-1453. Attcntlou YYcst End Dnln (Ifi) foot c;$encnt -
t0 ft fhom ccnler)
plea*e be advised that IF it is thc intcnt of thc develoPer to Put irl a prcssurized u-drytion I !'stcm and
have pioueer take over said system oncc the dcvelopment is complcte{ thc fbllouing, stePs arE
ileoEsEsry:
,AUG 2t
V/E
2003
0 I
7A"l
08/21r200i 14:31 FAX 4t94491 PIONEER IRRIG @ 01i oJ
I
oo
PioneEr Irrigation District
I
I
1
t
tEi2tt200X L4:34 FAX 4t84481 PIONEER IRRIG @ozrol
o
1. Said systcrn muct bc ptt in Eocordhg to thc cument Standards and Specifications of
Pioueer lni gdim Disnict
2. The developcr must coBtact the office of Esd Msson & Stadleld to make erral:Eemcnts
for on.sitc-inspccions to be oade at variotrs poinu of construction. An cugioeet tom
Esd Mason & Suuficld must bc involvod in tha inspections as ttrey are the agincus
for Pionecr Inieation District and src familisr with the requircments of Pione ;r.
3. Thc enginccrins fccs will bc the respotuibility of tbs dcvcloper and/or ow)cr, and a
deposit must be patd ir advaoce to Piouccr Inigation Distict bcforE tttc District will
authorizc Errl Mason & Sunficld to mricw cnginccdng plans. Estifiatld costs frr the
Distict's mgimering fees are $500 plus $5.00 pcr lot If tlnt amount fails to covcr the
costs involved dus to thc neccssity to rcvise plat maps, eE., additional costs tvill
bG billd or$ and paid prior to thc DisEist's signing ofr on the final plu.
4. If it is rhe developers plan to bff're Piouerr Iniqntion Distrist take over a prcsstEized
irrigation sysrem-for the subdivision, it will be uccassary thEt thc pumP site k: designcd
at ths District's cuEcnt point of detivrry. Service to the suMivision from the prirp site
must have its onm privatc detivsry linc from thc dclivery poiot to thc subdivision.
5. A Maintenance Agreement must be written up ard rccorrdcd at the erpense of ths
Developcr and/or owBcr, All Mairtcnance Agreanents nrust be rcvieucd by aud
approved by the Distric,t's Anoroey, Scon Carapbell, of lvloffan Thomas in Eoise, The
tiist expcusivc w&y !o have r Mriatenmce Agreement &arrnr up ufiich mecu the nceds
of the pisrict ie by hrving Mr. Campbell himcclf &aw it up. CIherwise ttrerc will be
two attorney fees for said dcvcloper and/or owngr to pay- Mr- Campbell may be
contacted at 34$2000. A dcposit of $10{i0.00 aust bc paid to Moffan Thomr,g to cover
rhe attorney fccs bcfotE the work can bcgin. Aay uocrqcnded portion of tlrc dcposit
will bc rrftndcd-
6. Earl Masoa aod Stanficld must qalk tbrough thc sitc aad dcvclop a punch list to bc
completed pmor to recommcmdiug that Pionecr lrrigatim Distritrt takc over the
pressurized inigntion systeo.
If it is NOT the intcnt of the devcloper to rcquGst Pionccr Inigetioa Distict b tsltc ovcr I
pressurizcd inigation systErn within their oompleted dweloplnGnq thcn the above six stt:PE do not
apply to their planned dcvelopmcot,
Any proposcd development which will have dowrrsu€aflr watezrrsers usiag gravity florv irrigatiorr
**t a""itop thck irrigadou systcm in a manncr qtich will instne thc downstrsm watcrus6rs thc
abiliry ro acquire st hr&t es much inigation wctcr for grf,vity flow imganon as wtrat rhe,' aeceived
prior'to any ihrclopment or consmrctisn taking plase. The graviry flow irrfi.atiof, systlltr fiust bc
Lt ttv s€parato from tbs proposcd prcssruizcd irrigation systcm within a subdivision.
o
.,
0822121003 14:3.1 FAX 4584491 PIONEER IRRIG @ ca/ 03
o o
NOTE: This httcr docr not luthorizc tly courtruction to sot[lDGECG u[til dl tLc uccermry
rgrccmcntr witl Plouecr lrrigrtion llirtrlct hrvc bccn crccutcd rnd rtcordcd.
If you have auy quastioas, pleasc fccl ftee to catl.
Sincerely
Muk F. Zirsctrky
As sistant Superintcndent
Cc: Scott Campbell - Mofttt Thomis, Banctt Rmk & Fietds via fax 385-5384
3
o o
Memorandum
To:
From
Re:
Date:
Steve Hasson
Ben Weymouth, Assistant City Engineer
Case No. ZON-34-03
July 7, 2003
The Engineering Department does not appose the request by Russell Snow to rezone three (3) parcels of
land from R-1 (single family residential) to C-1 (neighborhood commercial), but does provide the following list
of comments concerning future development of this site:
2
1 Future development of the site will require compliance with the City of Caldwell Sewer & Water Master
Plans.
Future development will require adherence to the City's lnfrastructure lmprovement Policy in regards to
curb, gutter and sidewalk improvements.
3. Currently there is only a 2S-foot one-half width right-of-way along Logan St. The applicant will be
required to dedicate an additional S-foot of right-of-way to meet the City standards for a Major Collector
which is 3OJoot one-half width right-of-way.
4. Future development of the site will require compliance with the City of Caldwell Storm Water
Management Policy dated December 1998.
5. During the future design phases of this project, the developer or his engineer is to contact any
applicable irrigation District to ascertain all existing upstream drainage rights and downstream irrigation
rights that need to be maintained across the property. Appropriate facilities shall be provided to convey
irrigation and drainage water across the property to take care of these offsite needs at the time of
development. There is to be no discharge of irrigation return water into the subdivision storm water
system with new development. A letter is to be obtained from applicable lrrigation District indicating
their concurrence with the design and facilities that preserve these existing rights before any future
construction will commence.