Loading...
HomeMy WebLinkAboutPublic AgencyeI PUBLIC AGENCY ITEM DATE SUBMITTED BY (to I rz- lot ^l lc,'- lt -a',1 ruurn-o tl'zz-o( O fu)rc I o (Dffire fi @.itgffrrgtnaer& ffirfulicW*h"ptre*ur Ca-e. No, (a-q1 -/b3 GORDON N. LAW, P.E. City of Coldwell P.O. Box I177 Coldwell. ldoho 83606-'l I77 BUS. 208/455-3006 November 28,2001 CIW OF CALDWELT 62i'Clevelond Blvd. Coldwell. ldoho 83605 PHONE (208) 45s-30@ FAX (208) 455-3m3 Brian D. Huffacker Hawkins Co. 8645 W. Franklin Rd. Boise, ID 83709 Re: Alley Vacation for Walgreens Dear Mr. Huffacker The City of Caldwell has reviewed your request for vacation of the alleyway in Block 26 of Dorman's Addition. We have also received letters from the effected utilities indicating that they do not object to this vacation. The public hearing for this vacation is scheduled for December l'1, 2001. We will forward a copy ofthe council agenda for that night at your request. A copy ofthe proposed ordinance is enclosed or your information. As a matter of clarification, we do need Intermountain Gas Co. to indicate that they are willing to relocate the 2-inch gas main down this alleyway. Please do not hesitate to contact me if you have any further questions or concerns- I can be reached at 455-3006 during normaliusiness hours Sincerely, #^z Ben L. Weymouttr, P.E. Assistant City Engineer BLWjs Joan Holmes Community Development CC ao DATE:October 16,2001 TO:Steve Hasson, Community Development Director FROM:Douglas Brown, Assistant Chief / Fire Marshal SUBJECT: Comments for Caldwell Hearing Examiner O.@ The Caldwell Fire Department (CFD) offers the following comments regarding these cases to come before the Caldwell Hearing Examiner meeting for October 24,2001: Case No: Al[N-59-01 Applicant: Earl Tuclcress Location: E. of krdiana%mi. S. of Homedale and %mi.N. of Hwy 55 The CFD has no objections to this arurexation. Specific or special requirements will be made during plan review for any change of use of this property, SUP, CUP or similar proceedings. Case No: Applicant: Location: zoN-l6-01 Willis Hubler SE corner of Kimball and Linden The CFD has no objections to this arurexation or change of zoning. Specific or special requirements will be made during plan review for any change of use of this properfy, SUP, CUP or similar proceedings. ( Case No: Applicant: Location: AtlN-60-01 Vallivue School District W. side ofFlorida and%mi. south of Homedale,*l-2000'N. of Hwy. 55 The CFD has no objections to this annexation or change of zoning. Specific or special requirements will be made during plan review for any change of use of this property, SLIP, CUP or similar proceedings. P h'z ao The CFD has no objections to this change of zoning. Specific or special requirements will be made during plan review for any change of use of this properry, SUP, CUP or similar proceedings. Case No: Applicant: Location: zoN-17-01 Hawkins Companies NW corner of 1lth and Dearborn oI Memorandum To Re: From: Date: Steve Hasson Gordon Law, City ZON-17-01 for Hawkins Companies October 12,2001 1 The Engineering Department does not oppose the above referenced rezone from R-3 to C-2 The Engineering Department does offer the following comments on the above referenced development. These comments will apply to the proposed development at this site. Future development will require adherence to the City's lnfrastructure lmprovement Policy with regard to curb, gutter, and sidewalk improvements. This requirement shall extend to existing curb, gutter, and sidewalk that is in need of repair and/or replacement. 2. Development Plans - Prior to any proposed use or commencing any construction, plans must be prepared by the developer's engineer and approved by the City Engineering Department which include the following items: a. Site plans showing existing and proposed development; b. Sidewalk (S-foot width); c. Sanitary sewer (per City and DEQ requirements); d. Potable water (per City and DEQ requirements); e. Stormwater facilities (per City Policy); 3. The developer is to employ a responsible design professional, preferably the engineer of record, to oversee and inspect construction, to perform and/or observe all requisite testing of completed facilities, and to certify that improvements have been constructed according to approved plans and in compliance with applicable City, State, and Federal standards. 4. Prior to commencement of construction in any dedicated right-of-way, or construction of any improvement intended for dedication to the City or connected to a City facility, the City Engineering staff is to be notified. This preferably will take place in a pre-construction conference scheduled by the engineer of record in which all appropriate personnel and utilities are present. Appropriate City personnel are to be notified in advance of all testing (including compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of the test. The engineer of record or his designated representative is to witness alltests and a log of inspection visits and testing results is to be kept by the engineer of record or his representative. 5. As noted previously, provision is to be made for the disposal of stormwater drainage in accordance with the City Stormwater Management Policy. A copy of this policy is available upon request. The engineer of record is to provide calculations, which indicate that the Page 1 of 2 r\ ensineefu eI assumptions in his stormwater drainage plan comply with the requirements of the stormwater policy. 6. lrrigation water for any and all landscaping shall be obtained from Caldwell lrrigation Lateral District sources. 7. All street, sewer, water, and street light facilities must be dedicated to the City L The need for any additional sewer and water connection fees will be assessed during the Build Permit process. 9. Appropriately licensed public works contractors shall perform all construction of dedicated facilities. 10. The ldaho Transportation Department (lTD) has jurisdiction over Cleveland Boulevard rights- of-way and any improvements made in these rights-of-way must be permitted through lTD. 11. The proposed locations of the driveway approaches appear to be acceptable. However, the Engineering Department will review and approve the locations during the Build Permit process. 12. Hawkins Companies is actively pursuing vacation of the existing alley and the associated re- route of the existing sewer main line and other utilities within the alley. lf approved, vacation of this alley will be contingent upon approval of construction drawings for the proposed reroute(s) and the construction of said reroute(s). The applicant should be award that the existing sewer main line may not have adequate fallto allow the proposed reroute. Page 2 of 2