HomeMy WebLinkAboutPublic AgencyeI
PUBLIC AGENCY
ITEM DATE SUBMITTED BY
(to I rz- lot ^l
lc,'- lt -a',1
ruurn-o tl'zz-o(
O
fu)rc
I o
(Dffire fi @.itgffrrgtnaer&
ffirfulicW*h"ptre*ur
Ca-e. No,
(a-q1 -/b3
GORDON N. LAW, P.E.
City of Coldwell
P.O. Box I177
Coldwell. ldoho 83606-'l I77
BUS. 208/455-3006
November 28,2001
CIW OF CALDWELT
62i'Clevelond Blvd.
Coldwell. ldoho 83605
PHONE (208) 45s-30@
FAX (208) 455-3m3
Brian D. Huffacker
Hawkins Co.
8645 W. Franklin Rd.
Boise, ID 83709
Re: Alley Vacation for Walgreens
Dear Mr. Huffacker
The City of Caldwell has reviewed your request for vacation of the alleyway in Block 26
of Dorman's Addition. We have also received letters from the effected utilities indicating
that they do not object to this vacation.
The public hearing for this vacation is scheduled for December l'1, 2001. We will
forward a copy ofthe council agenda for that night at your request. A copy ofthe
proposed ordinance is enclosed or your information.
As a matter of clarification, we do need Intermountain Gas Co. to indicate that they are
willing to relocate the 2-inch gas main down this alleyway.
Please do not hesitate to contact me if you have any further questions or concerns- I can
be reached at 455-3006 during normaliusiness hours
Sincerely,
#^z
Ben L. Weymouttr, P.E.
Assistant City Engineer
BLWjs
Joan Holmes
Community Development
CC
ao
DATE:October 16,2001
TO:Steve Hasson, Community Development Director
FROM:Douglas Brown, Assistant Chief / Fire Marshal
SUBJECT: Comments for Caldwell Hearing Examiner
O.@
The Caldwell Fire Department (CFD) offers the following comments regarding these cases to come
before the Caldwell Hearing Examiner meeting for October 24,2001:
Case No: Al[N-59-01
Applicant: Earl Tuclcress
Location: E. of krdiana%mi. S. of Homedale and %mi.N. of Hwy 55
The CFD has no objections to this arurexation. Specific or special requirements will be made
during plan review for any change of use of this property, SUP, CUP or similar proceedings.
Case No:
Applicant:
Location:
zoN-l6-01
Willis Hubler
SE corner of Kimball and Linden
The CFD has no objections to this arurexation or change of zoning. Specific or special
requirements will be made during plan review for any change of use of this properfy, SUP, CUP or
similar proceedings.
(
Case No:
Applicant:
Location:
AtlN-60-01
Vallivue School District
W. side ofFlorida and%mi. south of Homedale,*l-2000'N. of Hwy. 55
The CFD has no objections to this annexation or change of zoning. Specific or special
requirements will be made during plan review for any change of use of this property, SLIP, CUP or
similar proceedings.
P h'z
ao
The CFD has no objections to this change of zoning. Specific or special requirements will be made
during plan review for any change of use of this properry, SUP, CUP or similar proceedings.
Case No:
Applicant:
Location:
zoN-17-01
Hawkins Companies
NW corner of 1lth and Dearborn
oI
Memorandum
To
Re:
From:
Date:
Steve Hasson
Gordon Law, City
ZON-17-01 for Hawkins Companies
October 12,2001
1
The Engineering Department does not oppose the above referenced rezone from R-3 to C-2
The Engineering Department does offer the following comments on the above referenced
development. These comments will apply to the proposed development at this site.
Future development will require adherence to the City's lnfrastructure lmprovement Policy
with regard to curb, gutter, and sidewalk improvements. This requirement shall extend to
existing curb, gutter, and sidewalk that is in need of repair and/or replacement.
2. Development Plans - Prior to any proposed use or commencing any construction, plans
must be prepared by the developer's engineer and approved by the City Engineering
Department which include the following items:
a. Site plans showing existing and proposed development;
b. Sidewalk (S-foot width);
c. Sanitary sewer (per City and DEQ requirements);
d. Potable water (per City and DEQ requirements);
e. Stormwater facilities (per City Policy);
3. The developer is to employ a responsible design professional, preferably the engineer of
record, to oversee and inspect construction, to perform and/or observe all requisite testing of
completed facilities, and to certify that improvements have been constructed according to
approved plans and in compliance with applicable City, State, and Federal standards.
4. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre-construction
conference scheduled by the engineer of record in which all appropriate personnel and
utilities are present. Appropriate City personnel are to be notified in advance of all testing
(including compaction, pressure and coliform, etc.) and given opportunity to be present
during conduct of the test. The engineer of record or his designated representative is to
witness alltests and a log of inspection visits and testing results is to be kept by the engineer
of record or his representative.
5. As noted previously, provision is to be made for the disposal of stormwater drainage in
accordance with the City Stormwater Management Policy. A copy of this policy is available
upon request. The engineer of record is to provide calculations, which indicate that the
Page 1 of 2 r\
ensineefu
eI
assumptions in his stormwater drainage plan comply with the requirements of the stormwater
policy.
6. lrrigation water for any and all landscaping shall be obtained from Caldwell lrrigation Lateral
District sources.
7. All street, sewer, water, and street light facilities must be dedicated to the City
L The need for any additional sewer and water connection fees will be assessed during the
Build Permit process.
9. Appropriately licensed public works contractors shall perform all construction of dedicated
facilities.
10. The ldaho Transportation Department (lTD) has jurisdiction over Cleveland Boulevard rights-
of-way and any improvements made in these rights-of-way must be permitted through lTD.
11. The proposed locations of the driveway approaches appear to be acceptable. However, the
Engineering Department will review and approve the locations during the Build Permit
process.
12. Hawkins Companies is actively pursuing vacation of the existing alley and the associated re-
route of the existing sewer main line and other utilities within the alley. lf approved, vacation
of this alley will be contingent upon approval of construction drawings for the proposed
reroute(s) and the construction of said reroute(s). The applicant should be award that the
existing sewer main line may not have adequate fallto allow the proposed reroute.
Page 2 of 2