HomeMy WebLinkAboutPublic Agencyr
PUBLIC AGENCY
ITEM
DATE
SUBMITTED BY
A
APR 0 8 2011
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
The Honorable Garret Nancolas
Mayor, City of Caldwell
Post Office Box 1179
Caldwell, Idaho 83606
Dear Mayor Nancolas:
rDepartment of Homeland Security
C Strcct, SW
Washington, DC '047-1
OEPA��F
FEMA
(0,U6,
NS
CALDWELLlVED CITBY
Y CLERK
APR 1 � 2011
I am writing this letter as an official reminder that the City of Caldwell, Idaho, has until
May 24, 2011, to adopt and have the Department of Homeland Security's Federal Emergency
Management Agency (FEMA) Regional Office approve floodplain management measures that
satisfy 44 Code of Federal Regulations (CFR) Section 60.3(d) of the National Flood Insurance
Program (NFIP) regulations.
The City of Caldwell must adopt floodplain management measures, such as a floodplain
management ordinance, that meet or exceed the minimum NFIP requirements (copy enclosed) by
May 24, 2011, to avoid suspension from the NFIP. If suspended, your community becomes
ineligible for flood insurance through the NFIP, new insurance policies cannot be sold, and existing
policies cannot be renewed.
Under the Flood Disaster Protection Act of 1973, as amended, flood insurance must be purchased by
property owners seeking any Federal financial assistance for construction or acquisition of buildings
in SFHAs. This financial assistance includes certain federally guaranteed mortgages and direct
loans, federal disaster relief loans and grants, as well as other similarly described assistance from
FEMA and other agencies.
In addition, all loans individuals obtain from Federally regulated, supervised, or insured lending
institutions that are secured by improved real estate located in SFHAs are also contingent upon the
borrower obtaining flood insurance coverage on the building. However, purchasing and maintaining
flood insurance coverage on a voluntary basis is frequently recommended for properties located
outside SFHAs.
Your NFIP State Coordinator and FEMA would like to assist the City of Caldwell to ensure it
remains in good standing with the NFIP and avoids suspension from the Program. If your
community is suspended, it may regain its eligibility in the NFIP by enacting the floodplain
management measures established in 44 CFR Section 60.3 of the NFIP regulations. As stated in my
previous correspondence, I recommend you contact your NFIP State Coordinator or the FEMA
Regional Office if the City of Caldwell is encountering difficulties in enacting its measures.
www1ema.go.,
r r
The Honorable Garret Nancolas
APR 0 8 2011
Page 2
I recognize that your community may be in the final adoption process or may have recently adopted
the appropriate floodplain management measures. Please submit these measures to the Floodplain
Management Program at the Idaho Department of Water Resources. Mary McGown, CFM, the
NFIP State Coordinator, is accessible by telephone at (208) 287-4928, in writing at
322 East Front Street, Boise, Idaho 83720, or by electronic mail at mary.mcgown@idwr.idaho.gov.
The FEMA Regional staff in Bothell, Washington, is also available to assist you with your floodplain
management measures. The FEMA Regional Office may be contacted by telephone at
(425) 487-4600 or in writing. Please send your written inquiries to the Director, Federal Insurance
and Mitigation Division, FEMA Region X, at 130 228th Street, Southwest, Bothell, Washington
98201-9796.
In the event your community does not adopt and/or submit the necessary floodplain management
measures that meet or exceed the minimum NFIP requirements, I must take the necessary steps to
suspend your community from the NFIP. This letter is FEMA's final notification before your
community is suspended from the Program.
Sincerely,
Sandra K. Knight, PhD, PE
Deputy Federal Insurance and
Mitigation Administrator, Mitigation
Enclosure
cc: Kenneth Murphy, Regional Administrator, FEMA Region X
Mary McGown, CFM, NFIP State Coordinator, Idaho Department of Water Resources
Brent Orton, Floodplain Administrator/Director of Public Works, City of Caldwell
r
FEDERAL EMERGENCY MANAGEMENT AGENCY
Revised Oct. 21, 2002
This document. which is in two parts. contains a reprint of the National Flood Insurance
Program (NFW)'s regulations (44 CFR Parts 59-78), revised as of October 1, 2001, as
well as final NFIP rules that became effective between October 1, 2001 and October 21,
2002.
Part I contains the NFIP final regulations revised as of October 1, 2001.
Part II contains the following NFIP rules published after that date:
• A final rule published on February 27, 2002, which increases
premium rates charged under the NFIP for -pre -FIRM,"V-zone
properties. (Those revisions became effective May 1.2002.)
■ A finale rule published on March 22.2002, launching a pilot project
to enable up to six intergovernmental resit pools to sell flood
insurance under the Write Your Own (WYO) program. (Those
revisions became effective on April 22, 2002.)
• A final rule published on August 9. 2002. revising the effective
date of the WYO arrangement for the 2002-3 arrangement year. .
(The change took effect October I, 2002.)
■ An interim final rule published on September 30. 2002. permitting
States to extend coverage under Group Flood Insurance Policies by
paying premiums for the coverage. (The rule became effective
October 15, 2002.)
Federal Emergency C."Anagement Agency r
0 59.24 Suspension of community eligi-
bility.
(a) A community eligible for the sale
of flood insurance shall be subject to
suspension from the Program for fail-
ing to submit copies of adequate flood
plain management regulations meeting
the minimum requirements of para-
graphs (b), (c), (d), (e) or (f) of §60.3 or
paragraph (b) of §60.4 or §60.5, within
six months from the date the Adminis-
trator provides the data upon which
the flood plain regulations for the ap-
plicable paragraph shall be based.
Where there has not been any submis-
sion by the community, the Adminis-
trator shall notify the community that
90 days remain in the six month period
in order to submit adequate flood plain
management regulations. Where there
has been an inadequate submission, the
Administrator shall notify the commu-
nity of the specific deficiencies in its
submitted flood plain management reg-
ulations and inform the community of
the amount of time remaining within
the six month period. If, subsequently,
copies of adequate flood plain manage-
ment regulations are not received by
the Administrator, no later than 30
days before the expiration of the origi-
nal six month period the Administrator
shall provide written notice to the
community and to the state and assure
publication in the FEDERAL REGISTER
under part 64 of this subchapter of the
community's loss of eligibility for the
sale of flood insurance, such suspension
to become effective upon the expira-
tion of the six month period. Should
the community remedy the defect and
the Administrator receive copies of
adequate flood plain management regu-
lations within the notice period, the
suspension notice shall be rescinded by
the Administrator. If the Adminis-
trator receives notice from the State
that it has enacted adequate flood
plain management regulations for the
community within the notice period,
the suspension notice shall be re-
scinded by the Administrator. The
community's eligibility shall remain
terminated after suspension until cop-
ies of adequate flood plain manage-
ment regulations have been received
and approved by the Administrator.
(b) A community eligible for the sale
of flood insurance which fails to ade-
§ 69.24
quately enforce flood plain manage-
ment regulations meeting the min-
imum requirements set forth in §§60.3,
60.4 and/or 60.5 shall be subject to pro-
bation. Probation shall represent for-
mal notification to the community
that the Administrator regards the
community's flood plain management
program as not compliant with NFIP
criteria. Prior to imposing probation,
the Administrator (1) shall inform the
community upon 90 days prior written
notice of the impending probation and
of the specific program deficiencies and
violations relative to the failure to en-
force, (2) shall, at least 60 days before
probation is to begin, issue a press re-
lease to local media explaining the rea-
sons for and the effects of probation,
and (3) shall, at least 90 days before
probation is to begin, advise all policy-
holders in the community of the im-
pending probation and the additional
premium that will be charged, as pro-
vided in this paragraph, on policies
sold or renewed during the period of
probation. During this 90-day period
the community shall have the oppor-
tunity to avoid probation by dem-
onstrating compliance with Program
requirements, or by correcting Pro-
gram deficiencies and remedying all
violations to the maximum extent pos-
sible. If, at the end of the 90-day period,
the Administrator determines that the
community has failed to do so, the pro-
bation shall go into effect. Probation
may be continued for up to one year
after the community corrects all Pro-
gram deficiencies and remedies all vio-
lations to the maximum extent pos-
sible. Flood insurance may be sold or
renewed in the community while it is
on probation. Where a policy covers
property located in a community
placed on probation on or after October
1, 1986, but prior to October 1, 1992, an
additional premium of $25.00 shall be
charged on each such policy newly
issued or renewed during the one-year
period beginning on the date the com-
munity is placed on probation and dur-
ing any successive one-year periods
that, begin prior to October 1, 1992.
Where a community's probation begins
on or after October 1, 1992, the addi-
tional premium described in the pre-
ceding sentence shall be $50.00, which
231
9 0Y.'L4 r
shall also be charged during any suc-
cessive one-year periods during which
the community remains on probation
for any part thereof. This $50.00 addi-
tional premium shall further be
charged during any successive one-year
periods that begin on or after October
1, 1992, where the preceding one-year
probation period began prior to Octo-
ber 1, 1992.
(c) A community eligible for the sale
of flood insurance which fails to ade-
quately enforce its flood plain manage-
ment regulations meeting the min-
imum requirements set forth in §§ 60.3,
60.4 and/or 60.5 and does not correct its
Program deficiencies and remedy all
violations to the maximum extent pos-
sible in accordance with compliance
deadlines established during a period of
probation shall be subject to suspen-
sion of its Program eligibility. Under
such circumstances, the Administrator
shall grant the community 30 days in
which to show cause why it should not
be suspended. The Administrator may
conduct a hearing, written or oral, be-
fore commencing suspensive action_ If
a community is to be suspended, the
Administrator shall inform it upon 30
days prior written notice and upon
publication in the FEDERAL REGZSTFR
under part 64 of this subchapter of its
loss of eligibility for the sale of flood
insurance. in the event of impending
suspension, the Administrator shall
issue a press release to the local media
explaining the reasons and effects of
the suspension. The community's eligi-
bility shall only be reinstated by the
Administrator upon his receipt of a
local legislative or executive measure
reaffirming the community's formal
intent to adequately enforce the flood
plain management requirements of this
subpart, together with evidence of ac-
tion taken by the community to cor-
rect Program deficiencies and remedy
to the maximum extent possible those
violations which caused the suspen-
sion. In certain cases, the Adminis-
trator, in order to evaluate the com-
munity's performance under the terms
of its submission, may withhold rein-
statement for a period not to exceed
one year from the date of his receipt of
the satisfactory submission or place
the community on probation as pro-
44 CFR Q , i (10-1- 99 Edition)
vided for in paragraph (b) of this sec-
tion.
(d) A community eligible for the sale
of flood insurance which repeals its
flood plain management regulations,
allows its regulations to lapse, or
amends its regulations so that they no
longer meet the minimum require-
ments set forth in §§60.3, 60.4 and/or
60.5 shall be suspended from the Pro-
gram. If a community is to be sus-
pended, the Administrator shall inform
it upon 30 days prior written notice and
upon publication in the FEDERAL REG-
ISTER under part 64 of this subchapter
of its loss of eligibility for the sale of
flood insurance. The community eligi-
bility shall remain terminated after
suspension until copies of adequate
flood plain management regulations
have been received and approved by the
Administrator.
(e) A community eligible for the sale
of flood insurance may withdraw from
the Program by submitting to the Ad-
ministrator a copy of a legislative ac-
tion that explicitly states its desire to
withdraw from the National Flood In-
surance Program. Upon receipt of a
certified copy of a final legislative ac-
tion, the Administrator shall withdraw
the community from the Program and
publish in the .FEDERAI, REG[ST.ER under
part 64 of this subchapter its loss of eli-
gibility for the sale of flood insurance.
A community that has withdrawn from
the Program may be reinstated if its
submits the application materials spec-
ified in § 59.22(a).
(f) If during a period of ineligibility
under paragraphs (a), (d), or (e) of this
section, a community has permitted
actions to take place that have aggra-
vated existing flood plain, mudslide
(i.e., mudflow) and/or flood related ero-
sion hazards, the Administrator may
withhold reinstatement until the com-
munity submits evidence that it has
taken action to remedy to the max-
imum extent possible the increased
hazards. The Administrator may also
place the reinstated community on
probation as provided for in paragraph
(b) of this section..
' (g) The Administrator shall promptly
notify the servicing company and any
insurers issuing flood insurance pursu-
ant to an arrangement with the Ad-
ministrator of those communities
232
Federal Emergencyrinagement Agency
whose eligibility has been suspended or
which have withdrawn from the pro-
gram. Flood insurance shall not be sold
or renewed in those communities, Poli-
cies sold or renewed within a commu-
nity during a period of ineligibility are
deemed to be voidable by the Adminis-
trator whether or not the parties to
sale or renewal had actual notice of the
ineligibility.
(41 FR 46968, Oct. 26, 1976. Redesignated at 44
FR 31177, May 31, 1979, and amended at 48 FR
44543 and 44552, Sept. 29, 1983; 49 FR 4751, Feb.
8, 1984; 50 FR 36023, Sept. 4, 1985; 57 FR 19540,
May 7, 1992; 59 FR 53598, Oct. 25, 1994; 62 FR
55715, Oct. 27, 19971
PART 60—CRITERIA FOR LAND
MANAGEMENT AND USE
Subpart A —Requirements for Flood Plain
Management Regulations
SEC.
60.1 Purpose of subpart.
60.2 Minimum compliance with flood plain
management criteria.
60.3 Flood plain management criteria for
flood -prone areas.
60.4 Flood plain management criteria for
m.udalide (i.e., mudflow)-prone areas.
60.5 Flood plain management criteria for
flood -related erosion -prone areas.
60.6 Variances and exceptions.
60.7 Revisions of criteria for flood plain
management regulations.
60.8 Definitions.
Subpart 8--Requirements for State Flood
Plain Management Regulations
60.11 Purpose of this subpart.
60.12 Flood plain management criteria for
State-owned properties in special hazard
areas.
60.13 Noncompliance.
Subpart C—Additional Considerations In
Managing Flood -Prone, Mudslide (i.e.,
Mudflow)-Prone, and Flood -Related
Erosion -Prone Areas
60.21 Purpose of this subpart.
60.22 Planning considerations for flood -
prone areas.
60.23 Planning considerations for mudslide
(i.e., mudflow)-prone areas,
60.24 Planning considerations for flood -re-
lated erosion -prone areas.
60.25 Designation, duties, and responsibil-
ities of State Coordinating Agencies.
60.26 Local coordination.
AUTHOpiTy: 42 U.S.C. 4001 et seq.; Reorga-
nization Plan No. 3 of 1978, 43 FR 41943, 3
§ 60.1
C1i R, 1978 Comp., p. 329; E.O. 12127 of Mar. 31,
1979, 44 FR 19367, 3 CFR, 1979 Comp., p. 376.
SouRCE: 41 FR 46975, Oct. 26, 1976, unless
otherwise noted. Redesignated at 44 FR 31177,
May 31, 1979.
Subpart A —Requirements for
Flood Plain Management
Regulations
§ 60.1 Purpose of subpart.
(a) The Act provides that flood insur-
ance shall not be sold or renewed under
the program within a community, un-
less the community has adopted ade-
quate flood plain management regula-
tions consistent with Federal criteria.
Responsibility for establishing such
criteria is delegated to the Adminis-
trator.
(b) This subpart sets forth the cri-
teria developed in accordance with the
Act by which the Administrator will
determine the adequacy of a commu-
nity's flood plain management regula-
tions. These regulations must be le-
gally -enforceable, applied uniformly
throughout the community to all pri-
vately and publicly owned land within
flood -prone, mudslide (i.e., mudflow) or
flood -related erosion areas, and the
community must provide that the reg-
ulations take precedence over any leas
restrictive conflicting local laws, ordi-
nances or codes. Except as otherwise
provided in § 60,6, the adequacy of such
regulations shall be determined on the
basis of the standards set forth in § 60.3
for flood -prone areas, § 60.4 for mudslide
areas and § 60.5 for flood -related erosion
areas.
(c) Nothing in this subpart shall be
construed as modifying or replacing
the general requirement that all eligi-
ble communities must take into ac-
count flood, mudslide (i.e., mudflow)
and flood -related erosion hazards, to
the extent that they are known, in all
official actions relating to land man-
agement and use.
(d) The criteria set forth in this sub-
part are minimum standards for the
adoption of flood plain management
regulations by flood -prone, mudslide
(i.e., 'znudflow)-prone and flood -related
erosion -prone communities. Any com-
munity may exceed the minimum cri-
teria under this part by adopting more
comprehensive flood plain management
233
S 0u.t r
regulations utilizing the standards
such as contained in subpart C of this
part. In some instances, community of-
ficials may have access to information
or knowledge of conditions that re-
quire, particularly for human safety,
higher standards than the minimum
criteria set forth in subpart A of this
part. Therefore, any flood plain man-
agement regulations adopted by a
State or a community which are more
restrictive than the criteria set forth
in this part are encouraged and shall
take precedence.
[41 FR 46975, Oct. 26, 1976. Redesignated at 44
FR 31177. May 31, 1979, as amended at 48 FR
44552, Sept. 29, 1983; 49 FR 4751, Feb. 8, 1984)
§ 60.2 Minimum compliance with flood
plain management criteria.
(a) A flood -prone community apply-
ing for flood insurance eligibility shall
meet the standards of �60.3(a) in order
to become eligible if a FHBM has not
been issued for the community at the
time of application. Thereafter, the
community will be given a period of six
months from the date the Adminis-
trator provides the data set forth in
§60.3(b), (c), (d), (e) or (f), in which to
meet the requirements of the applica-
ble paragraph. If a community has re-
ceived a FHBM, but has not yet applied
for Program eligibility, the community
shall apply for eligibility directly
under the standards set forth in
§60.3(b). Thereafter, the community
will be given a period of six months
from the date the Administrator pro-
vides the data set forth in §60.3(c), (d),
(e) or (f) in which to meet the require-
ments of the applicable paragraph.
(b) A mudslide (i.e., mudflow)-prone
community applying for flood insur-
ance eligibility shall meet the stand-
ards of § 60.4(a) to become eligible.
Thereafter, the community will be
given a period of six months from the
date the mudslide (i.e., mudflow) areas
having special mudslide hazards are de-
lineated in which to meet the require-
ments of § 60.4(b).
(c) A flood -related erosion -prone
community applying for flood insur-
ance eligibility shall meet the stand-
ards of § 60.5(a) to become eligible.
Thereafter, the community will be
given a period of six months from the
date the flood -related erosion areas
" CFR (r l (10-1-99 Edi#1on)
having special erosion hazards are de-
lineated in which to meet the require-
ments of § 60.5(b).
(d) Communities identified in part 65
of this subchapter as containing more
than one type of hazard (e.g., any com-
bination of special flood, mudslide (i.e.,
mudflow), -and flood -related erosion
hazard areas) shall adopt flood plain
management regulations for each type
of hazard consistent with the require-
ments of §§ 60.3, 60.4 and 60.5.
(e) Local flood plain management
regulations may be submitted to the
State Coordinating Agency designated
pursuant to § 60.25 for its advice and
concurrence. The submission to the
State shall clearly describe proposed
enforcement procedures.
(f) The community official respon-
sible for submitting annual or biennial
reports to the Administrator pursuant
to §59.22(b)(2) of this subchapter shall
also submit copies of each annual or bi-
ennial report to any State Coordi-
nating Agency.
(g) A community shall assure that its
comprehensive plan is consistent with
the flood plain management objectives
of this part.
(h) The community shall adopt and
enforce flood plain management regu-
lations based on data provided by the
Administrator. Without prior approval
of the Administrator, the community
shall not adopt and enforce flood plain
management regulations based upon
modified data reflecting natural or
man-made physical changes.
[41 FR 46975, Oct. 26, 1976. Redesignated at 44
FIR 31177, May 31, 1979, as amended at 48 FR
29318, June 24, 1983, 48 FR 44552, Sept. 29, 1983;
49 FR 4751, Feb. 8, 1984; 50 FR 36024, Sept. 4,
1985; 59 FR 53598, Oct. 25, 1994; 62 FR 55716,
Oct. 27, 1997]
§ 60.3 Flood plain management criteria
for flood -prone areas.
The Administrator will provide the
data upon which flood plain manage-
ment regulations shall be based. If the
Administrator has not provided suffi-
cient data to furnish a basis for these
regulations in a particular community,
the community shall obtain, review
and reasonably utilize data available
from other Federal, State or other
sources pending receipt of data from
234
Federal Emergency r.nagement Agency r § 60.3
the Administrator. However, when spe-
cial flood hazard area designations and
water surface elevations have been fur-
nished by the Administrator, they
shall apply. The symbols defining such
special flood hazard designations are
set forth in § 64.3 of this subchapter. In
all cases the minimum requirements
governing the adequacy of the flood
plain management regulations for
flood -prone areas adopted by a par-
ticular community depend on the
amount of technical data formally pro-
vided to the community by the Admin-
istrator. Minimum standards for com-
munities are as follows:
(a) When the Administrator has not
defined the special flood hazard areas
within a community, has not provided
water surface elevation data, and has
not provided sufficient data to identify
the floodway or coastal high hazard
area, but the community has indicated
the presence of such hazards by sub-
mitting an application to participate
in the Program, the community shall:
(1) Require permits for all proposed
construction or other development in
the community, including the place-
ment of manufactured homes, so that
it may determine whether such con-
struction or other development is pro-
posed within flood -prone areas;
(2) Review proposed development to
assure that all necessary permits have
been received from those governmental
agencies from which approval is re-
quired by Federal or State law, includ-
ing section 404 of the Federal Water
Pollution Control Act Amendments of
1972, 33 U.S.C. 1334;
(3) Review all permit applications to
determine whether proposed building
sites will be reasonably safe from
flooding. If a proposed building site is
in a flood -prone area, all new construc-
tion and substantial improvements
shall (i) be designed (or modified) and
adequately anchored to prevent flota-
tion, collapse, or lateral movement of
the structure resulting from hydro-
dynamic and hydrostatic loads, includ-
ing the effects of buoyancy, (ii) be con-
structed with materials resistant to
flood damage, (iii) be constructed by
methods and practices that minimize
flood damages, and (iv) be constructed
with electrical, heating, ventilation,
plumbing, and air conditioning equip -
meat and other service facilities that
are designed and/or located so as to
prevent water from entering or accu-
mulating within the components dur-
ing conditions of flooding.
(4) Review subdivision proposals and
other proposed new development, in-
cluding manufactured home parks or
subdivisions, to determine whether
such proposals will be reasonably safe
from flooding. If a subdivision proposal
or other proposed new development is
in a flood -prone area, any such pro-
posals shall be reviewed to assure that
W all such proposals are consistent
with the need to minimize flood dam-
age within the flood -prone area, (ii) all
public utilities and facilities, such as
sewer, gas, electrical, and water sys-
tems are located and constructed to
minimize or eliminate flood damage,
and (iii) adequate drainage is provided
to reduce exposure to flood hazards;
(5) Require within flood -prone areas
new and replacement water supply sys-
tems to be designed to minimize or
eliminate infiltration of flood waters
into the systems; and
(6) Require within flood -prone areas
(i) new and replacement sanitary sew-
age systems to be designed to minimize
or eliminate infiltration of flood wa-
ters into the systems and discharges
from the systems into flood waters and
(ii) onsite waste disposal systems to be
located to avoid impairment to them
or contamination from them during
flooding.
(b) When the Administrator has des-
ignated areas of special flood hazards
(A zones) by the publication of a com-
munity's FHBM or FIRM, but has nei-
ther produced water surface elevation
data nor identified a floodway or coast-
al high hazard area, the community
shall:
(1) Require permits for all proposed
construction and other developments
including the placement of manufac-
tured homes, within Zane A on the
community's FHBM or FIRM;
(2) Require the application of the
standards in paragraphs (a) (2), (3), (4),
(5) and (6) of this section to develop-
ment within Zone A on the commu-
nity's FHBM or FIRM;
235
9 ou.,s r
(3) Require that all new subdivision
proposals and other proposed develop-
ments (including proposals for manu-
factured home parks and subdivisions)
greater than 50 lots or 5 acres, which-
ever is the lesser, include within such
proposals base flood elevation data;
(4) Obtain, review and reasonably uti-
lize any base flood elevation and
floodway data available from a Fed-
eral, State, or other source, including
data developed pursuant to paragraph
(b)(3) of this section, as criteria for re-
quiring that new construction, sub-
stantial improvements, or other devel-
opment in Zone A on the community's
FHBM or FIRM meet the standards in
paragraphs (c)(2), (c)(3), (c)(5), (c)(6),
(c)(12), (c)(14), (d)(2) and (d)(3) of this
section;
(5) Where base flood elevation data
are utilized, within Zone A on the com-
munity's FHBM or FIRM:
W Obtain the elevation (in relation
to mean sea level) of the lowest floor
(including basement) of all new and
substantially improved structures, and
(ii) Obtain, if the structure has been
floodproofed in accordance with para-
graph (c)(3)(ii) of this section, the ele-
vation (in relation to mean sea level)
to which the structure was
floodproofed, and
(iii) Maintain a record of all such in-
formation with the official designated
by the community under § 59.22
(a)(9)(iii);
(6) Notify, in riverine situations, ad-
jacent communities and the State Co-
ordinating Office prior to any alter-
ation or relocation of a watercourse,
and submit copies of such notifications
to the Administrator;
(7) Assure that the flood carrying ca-
pacity within the altered or relocated
portion of any watercourse is main-
tained;
(8) Require that all manufactured
homes to be placed within Zone A on a
community's FHBM or FIRM shall be
installed using methods and practices
which minimize flood damage. For the
purposes of this requirement, manufac-
tured homes must be elevated and an-
chored to resist flotation, collapse, or
lateral movement. Methods of anchor-
ing may include, but are not to be lim-
ited to, use of over -the -top or frame
ties to ground anchors. This require-
44 C;FK (r1 (W-1--99 Edition)
meat is in addition to applicable State
and local anchoring requirements for
resisting wind forces.
(c) When the Administrator has pro-
vided a notice of final flood elevations
for one or more special flood hazard
areas on the community's FIRM and, if
appropriate, has designated other spe-
cial flood hazard areas without base
flood elevations on the community's
FIRM, but has not identified a regu-
latory floodway or coastal high hazard
area, the community shall:
(1) Require the standards of para-
graph (b) of this section within all Al--
30 zones, AE zones, A zones, AH zones,
and AO zones, on the community's
FIRM;
(2) Require that all new construction
and substantial improvements of resi-
dential structures within Zones Al--30,
AB and AH zones on the community's
FIRM have the lowest floor (including
basement) elevated to or above the
base flood level, unless the community
is granted an exception by the Admin-
istrator for the allowance of basements
in accordance with § 60.6 (b) or (c);
(3) Require that all new construction
and substantial improvements of non-
residential structures within Zones Al-
30, AB and AH zones on the commu-
nity's firm (i) have the lowest floor (in-
cluding basement) elevated to or above
the base flood level or, (ii) together
with attendant utility and sanitary fa-
cilities, be designed so that below the
base flood level the structure is water-
tight with walls substantially imper-
meable to the passage of water and
with structural components having the
capability of resisting hydrostatic and
hydrodynamic loads and effects of
buoyancy;
(4) Provide that where a non-residen-
tial structure is intended to be made
watertight below the base flood level,
(i) a registered professional engineer or
architect shall develop and/or review
structural design, specifications, and
plans for the construction, and shall
certify that the design and methods of
construction are in accordance with ac-
cepted standards of practice for meet-
ing the applicable provisions of para-
graph (c)(3)(ii) or (c)(8)(ii) of this sec-
tion, and (fi) a record of such certifi-
cates which includes the specific ele-
vation (in relation to mean sea level)
236
Federal Emergencrlanagement Agency r
to which such structures are
floodproofed shall be maintained with
the official designated by the commu-
nity under § 59.22(a)(9)(iii);
(5) Require, for all new construction
and substantial improvements, that
fully enclosed areas below the lowest
floor that are usable solely for parking
of vehicles, building access or storage
in an area other than a basement and
which are subject to flooding shall be
designed to automatically equalize hy-
drostatic flood forces on exterior walls
by allowing for the entry and exit of
floodwaters. Designs for meeting this
requirement must either be certified
by a registered professional engineer or
architect or meet or exceed the fol-
lowing minimum criteria: A minimum
of two openings having a total net area
of not less than one square inch for
every square foot of enclosed area sub-
ject to flooding shall be provided. The
bottom of all openings shall be no high-
er than one foot above grade. Openings
may be equipped with screens, louvers,
valves, or other coverings or devices
provided that they permit the auto-
matic entry and exit of floodwaters.
(6) Require. that manufactured homes
that are placed or substantially im-
proved within Zones Al-30, AH, and AE
on the community's FIRM on sites
(i) Outside of a manufactured home
park or subdivision,
(ii) In a new manufactured home
park or subdivision,
(iii) In an expansion to an existing
manufactured home park or subdivi-
sion, or
(iv) In an existing manufactured
home park or subdivision on which a
manufactured home has incurred "sub-
stantial damage" as the result of a
flood, be elevated on a permanent foun-
dation such that the lowest floor of the
manufactured home is elevated to or
above the base flood elevation and be
securely anchored to an adequately an-
chored foundation system to resist
floatation collapse and lateral move-
ment.
(7) Require within any AO zone on
the community's FIRM that all new
construction and substantial improve-
ments of residential structures have
the lowest floor (including basement)
elevated above the highest adjacent
grade at least as high as the depth
§ 60.3
number specified in feet on the commu�:
nity's FIRM (at least two feet if no
depth number is specified);
(8) Require within any AO zone on
the community's FIRM that all new
construction and substantial improve-
ments of nonresidential structures (i)
have the lowest floor (including base-
ment) elevated above the highest adja-
cent grade at least as high as the depth
number specified in feet on the commu-
nity's FIRM (at least two feet if no
depth number is specified), or (ii) to-
gether with attendant utility and sani-
tary facilities be completely
floodproofed to that level to meet the
floodproofing standard specified in
§ 60.3(c)(3)(ii);
(9) Require within any A99 zones on a
community's FIRM the standards of
paragraphs (a)(1) through (a)(4)(i) and
(b)(5) through (b)(9) of this section;
(10) Require until a regulatory
floodway is designated, that no new
construction, substantial improve-
ments, or other development (including
fill) shall be permitted within Zones
AI-30 and AE on the community's
FIRM, unless it is demonstrated that
the cumulative effect of the proposed
development, when combined with all
other existing and anticipated develop-
ment, will not increase the water sur-
face elevation of the base flood more
than one foot at any point within the
community.
(11) Require within Zones AH and AO,
adequate drainage paths around struc-
tures on slopes, to guide floodwaters
around and away from proposed struc-
tures.
(12) Require that manufactured
homes to be placed or substantially im-
proved on sites in an existing manufac-
tured home park or subdivision within
Zones A--1-30, AH, and AE on the com-
munity's FIRM that are not subject to
the provisions of paragraph (c)(6) of
this section be elevated so that either
(i) The lowest floor of the manufac-
tured home is at or above the base
flood elevation, or
(ii) The manufactured home chassis
Is supported by reinforced piers or
other foundation elements of at least
equivalent strength that are no less
than 36 inches in height above grade
and be securely anchored to an ade-
quately anchored foundation system to
237
§ 60.3 E
resist floatation, collapse, and lateral
movement.
(13) Notwithstanding any other provi-
sions of § 60.3, a community may ap-
prove certain development in Zones Al-
30, AE, and AH, on the community's
FIRM which increase the water surface
elevation of the base flood by more
than one foot, provided that the com-
munity first applies for a conditional
FIRM revision, fulfills the require-
ments for such a revision as estab-
lished under the provisions of § 65.12,
and receives the approval of the Ad-
ministrator.
(14) Require that recreational vehi-
cles placed on sites within Zones Al--30,
AH, and AE on the community's FIRM
either
(i) Be on the site for fewer than 180
consecutive days,
(h) Be fully licensed and ready for
highway use, or
(iii) Meet the permit requirements of
paragraph (b)(1) of this section and the
elevation and anchoring requirements
for "manufactured homes" in para-
graph (c)(6) of this section.
A recreational vehicle is ready for
highway use if it is on its wheels or
jacking system, is attached to the site
only by quick disconnect type utilities
and security devices, and has no per-
manently attached additions.
(d) when the Administrator has pro-
vided a notice of final base flood ele-
vations within Zones Al-30 and/or AE
on the community's FIRM and, if ap-
propriate, has designated AO zones, AH
zones, A99 zones, and A zones on the
community's FIRM, and has provided
data from which the community shall
designate its regulatory floodway, the
community shall:
(1) Meet the requirements of para-
graphs (c) (1) through (14) of this sec-
tion;
(2) Select and adopt a regulatory
floodway based on the principle that
the area chosen for the regulatory
floodway must be designed to carry the
waters of the base flood, without in-
creasing the water surface elevation of
that flood more than one foot at any
point;
(3) Prohibit encroachments, includ-
ing fill, new construction, substantial
improvements, and other development
within the adopted regulatory
44 CFR r. 1 (10-1-99 Edition)
floodway unless it has been dem-
onstrated through hydrologic and hy-
draulic analyses performed in accord-
ance with standard engineering prac-
tice that the proposed encroachment
would not result in any increase in
flood levels within the community dur-
ing the occurrence of the base flood
discharge;
(4) Notwithstanding any other provi-
sions of § 60.3, a community may per-
mit encroachments within the adopted
regulatory floodway that would result
in an increase in base flood elevations,
provided that the community first ap-
plies for a conditional FIRM and
floodway revision, fulfills the require-
ments for such revisions as established
under the provisions of § 65.12, and re-
ceives the approval of the Adminis-
trator.
(e) When the Administrator has pro-
vided a notice of final base flood ele-
vations within Zones Al-30 and/or AE
on the community's FIRM and, if ap-
propriate, has designated AH zones, AO
zones, A99 zones, and A zones on the
community's FIRM, and has identified
on the community's FIRM coastal high
hazard areas by designating Zones Vl-
30, VE, and/or V, the community shall:
(1) Meet the requirements of para-
graphs (c)(1) through (14) of this sec-
tion;
(2) Within Zones V1-30, VE, and V on
a community's FIRM, (i ) obtain the
elevation (in relation to mean sea
level) of the bottom of the lowest
structural member of the lowest floor
(excluding pilings and columns) of all
new and substantially improved struc-
tures, and whether or not such struc-
tures contain a basement, and (ii)
maintain a record of all such informa-
tion with the official designated by the
community under § 59.22(a)(9)(iii);
(3) Provide that all new construction
within Zones V1-30, VE, and V on the
community's FIRM is located landward
of the reach of mean high tide;
(4) Provide that all new construction
and substantial improvements in Zones
Vl-30 and VE, and also Zone V if base
flood elevation data is available, on the
community's FIRM, are elevated on
pilings and columns so that (i) the bot-
tom of the lowest horizontal structural
member of the lowest floor (excluding
the pilings or columns) is elevated to
238
Federal Emergency Management Agency
or above the base flood level; and 00
the pile or column foundation and
structure attached thereto is anchored
to resist flotation, collapse and lateral
movement due to the effects of wind
and water loads acting simultaneously
on all building components. Water
loading values used shall be those asso-
ciated with the base flood. Wind load-
ing values used shall be those required
by applicable State or local building
standards. A registered professional en-
gineer or architect shall develop or re-
view the structural design, specifica-
tions and plans for the construction,
and shall certify that the design and
methods of construction to be used are
In accordance with accepted standards
of practice for meeting the provisions
of paragraphs (e)(4) (i) and (ii) of this
section.
(5) Provide that all new construction
and substantial improvements within
Zones V1-30, VE, and V on the commu-
nity's FIRM have the space below the
lowest floor either free of obstruction
or constructed with non -supporting
breakaway walls, open wood lattice-
work, or insect screening intended to
collapse under wind and water loads
without causing collapse, displace-
ment, or other structural damage to
the elevated portion of the building or
supporting foundation system. For the
purposes of this section, a breakway
wall shall have a design safe loading re-
sistance of not less than 10 and no more
than 20 pounds per square foot. Use of
breakway walls which exceed a design
safe loading resistance of 20 pounds per
square foot (either by design or when
so required by local or State codes)
may be permitted only if a registered
professional engineer or architect cer-
tifies that the designs proposed meet
the following conditions:
(i) Breakaway wall collapse shall re-
sult from a water load less than that
which would occur during the base
flood; and,
(A) The elevated portion of the build-
ing and supporting foundation system
shall not be subject to collapse, dis-
placement, or other structural damage
due to the effects of wind and water
loads acting simultaneously on all
building components (structural and
non-structural). Water loading values
used shall be those associated with the
§ 60.3
base flood. Wind loading values used
shall be those required by applicable
State or local building standards.
Such enclosed space shall be useable
solely for parking of vehicles, building
access, or storage.
(6) Prohibit the use of fill for struc-
tural support of buildings within Zones
V1-30, VE, and V on the community's
FIRM;
(7) Prohibit man-made alteration of
sand dunes and mangrove stands with-
in Zones V1--30, VS, and V on the com-
munity's FIRM which would increase
potential flood damage.
(8) Require that manufactured homes
placed or substantially improved with-
in Zones V1--30, V, and VE on the com-
munity's FIRM on sites
(i) Outside of a manufactured home
park or subdivision,
(ii) In a new manufactured home
park or subdivision,
(iii) In an expansion to an existing
manufactured home park or subdivi-
sion, or
(iv) In an existing manufactured
home park or subdivision on which a
manufactured home has incurred "sub-
stantial damage" as the result of a
flood, meet the standards of paragraphs
(e)(2) through (7) of this section and
that manufactured homes placed or
substantially improved on other sites
in an existing manufactured home park
or subdivision within Zones VI 30, V,
and VE on the community's FIRM
meet the requirements of paragraph
(c)(12) of this section.
(9) Require that recreational vehicles
placed on sites within Zones V1-30, V,
and VE on the community's FIRM ei-
ther
(i) Be on the site for fewer than 180
consecutive days,
(H) Be fully licensed and ready for
highway use, or
(iii) Meet the requirements in para-
graphs (b)(1) and (e) (2) through (7) of
this section.
A recreational vehicle is ready for
highway use if it is on its wheels or
jacking system, is attached to the site
only by quick disconnect type utilities
and security devices, and has no per-
manently attached additions.
(f) When the Administrator has pro-
vided a notice of final base flood ele-
vations within Zones A130 or AE on
239
§ 60.4 r
the community's FIRM, and, if appro-
priate, has designated AH zones, AO
zones, A99 zones, and A zones on the
community's FIRM, and has identified
flood protection restoration areas by
designating Zones AR, ARlA1-30, ARJ
AE, AR/AH, AR/AO, or ARIA, the com-
munity shall:
(1) Meet the requirements of para-
graphs (c)(1) through (1.4) and (d)(1)
through (4) of this section.
(2) Adopt the official map or legal de-
scription of those areas within Zones
AR, AR/A1-30, AR/AE, ARIAH, ARIA, or
AR/AO that are designated developed
areas as defined in §59.1 in accordance
with the eligibility procedures under
§65.14.
(3) For all new construction of strue.,
tunes in areas within Zone AR that are
designated as developed areas and in
other areas within. Zone Aid where the
AR flood depth is 5 feet or less:
(i) Determine the lower of either the
AR base flood elevation or the ele-
vation that is 3 feet above highest adja-
cent grade; and
(h) Using this elevation, require the
standards of paragraphs (c)(1) through
(14) of this section.
(4) For all new construction of struc-
tures in those areas within Zone AR
that are not designated as developed
areas where the AR flood depth is
greater than 5 feet:
(i) Determine the AR base flood ele-
vation; and
(h) Using that elevation require the
standards of paragraphs (c)(1) through
(14) of this section.
(5) For all new construction of struc-
tures in areas within Zone AR/A1-30,
AR/AE, AR/AH, AR/AO, and AR/A:
(i) Determine the applicable ele-
vation for Zone AR from paragraphs
(a)(3) and (4) of this section;
(ii) Determine .the base flood ele-
vation or flood depth for the under-
lying Al--30, AE, AH, AO and A Zone;
and
(iii) Using the higher elevation from
paragraphs (a)(5)(i) and (ii) of this sec-
tion require the standards of para-
graphs (c)(1) through (14) of this sec-
tion.
(6) For all substantial improvements
to existing construction within Zones
AWA1-30, AR/AE, AR/AH, AR/AO, and
AR/A:
44 CFR Cori. 10 0-1-99 Edition)
(i) Determine the Al--30 or AE, AH,
AO, or A Zone base flood elevation; and
00 Using this elevation apply the re-
quirements of paragraphs (c)(1)
through (14) of this section.
(7) Notify the permit applicant that
the area has been designated as an AR,
AR/A1-30, AR/AE, AR/AH, AR/AO, or
AR/A Zone and whether the structure
will be elevated or protected to or
above the AR base flood elevation.
(41 FR 46975, Oct. 26, 19761
EDITORI,AI, NOTE: For FEDERAL REGISTER Ci-
tations affecting §60.3, see the List of Sec-
tions Affected in the Finding Aids section of
this volume.
§ 60.4 Flood plain management criteria
for mudslide (i.e., mudflow)-prone
areas.
The Administrator will provide the
data upon which flood plain manage-
ment regulations shall be based. If the
Administrator has not provided suffi-
cient data to furnish a basis for these
regulations in a particular community,
the community shall obtain, review,
and reasonably utilize data available
from other Federal, State or other
sources pending receipt of data from
the Administrator. However, when spe-
cial mudslide (i.e., mudflow) hazard
area designations have been furnished
by the Administrator, they shall apply.
The symbols defining such special
mudslide (i.e., mudflow) hazard des-
ignations are set forth in § 64.3 of this
subchapter. In all cases, the minimum
requirements for mudslide (i.e., mud -
flow) -prone areas adopted by a par-
ticular community depend on the
amount of technical data provided to
the community by the Administrator.
Minimum standards for communities
are as follows:
(a) When the Administrator has not
,yet identified any area within the com-
munity as an area having special
mudslide (i.e., mudflow) hazards, but
the community has indicated the pres-
ence of such hazards by submitting an
application to participate in the Pro-
gram, the community shall
(1) Require permits for all proposed
donstruction or other development in
the community so that it may deter-
mine whether development is proposed
within mudslide (i.e., mudflow)-prone
areas;
240
Anne Marie. Skinner
From:
Eddy Thiel [eddy@nampahighwayl.coml
Sent:
Monday, May 02, 2011 4.10 PM
To:
Anne Marie. Skinner
Subject:
Case #OA-141-11
Good Afternoon Anne Marie,
The Nampa Highway District #1 has no objection to the City of Caldwell concerning adoption of the Flood
Damage Prevention Ordinance as it is not within our Jurisdiction.
If you have any questions feel free to contact me.
Thank you,
Eddy
Eddy Thiel
ROW
eddy2a n_ ampahi_ghwoyl.com
1507 HIGHWAY 45. • NAMPA, ID 83686
TEL 208.467.6576 + FAX 208.467.9916
This message may contain confidential and/or pnvrleged information_ If you are not the addressee or authorized to receive this for the addressee. you
must not use, copy, disclose, or take any action based on this message or any information herein. if you have received this message in error, please
advise the sender immediately by reply e-mail and delete this message Thank you for your cooperation
A
Anne Marie. Skinner
From:
Eddy Thiel [eddy@nampahighwayl.comj
Sent:
Thursday, April 14, 2011 8:16 AM
To:
Anne Marie. Skinner
Subject:
Case #OA-141-11
Good Morning Anne Marie,
The Nampa Highway District #1 has no objection to the Proposed Adoption of the Flood Damage Prevention
Ordinance as it is not within our Jurisdiction.
If you have any questions feel free to contact me.
Thank you,
Eddy
Eddy Thiel
ROW
eddy@nompohighwayl.com
47i17 HIGHWAY 45. • NAMPA, ID 83686
TEL 208.467.6576 • FAX 208.467.9916
This message may contain confidential and/or privileged infonnation. if you are not the addressee or authorized to receive this for the addressee. you
must not use, copy, disclose, or take any action based on this message or any infomation herein. if you have received this message in error, please
advise the sender immediately by reply e-mail and delete this message. Thank you for your cooperation
Anne Marie. Skinner
From: Larry Strough [Larry.Strough@itd.idaho.gov]
Sent: Tuesday, April 12, 2011 9:20 AM
To: Anne Marie. Skinner
Cc: Pam Golden
Subject: OA-141-11
Attachments: img-412082025-0001.pdf
ITD has no comment on the enclosed notice.
Thank You
Larry Strough
3348924