Brian and Brent:
Brent, I appreciate you taking the time yesterday to meet me at the site and discuss the possibilities regarding the
Indian Creek crossing. I did look at the crossings on Stock Trail and Georgia to give me some guidance
regarding what we would need to do.
As I discussed with Brent, there are a couple changes to the Development Agreement that we would request and
one of them carries over to the Staff Report. At the time that we were applying for the change in zoning, we had
included both New Beginnings Housing, LLC and our personal names under the applicant line. We were just
forming New Beginnings Housing, LLC. Cathy and I will actually not ever be in title on this property, only New
Beginnings Housing, LLC. As such, it seems more appropriate and we have asked that the Development
Agreement be clarified to show New Beginnings Housing, LLC as the "Applicant". We would ask that this also be
reflected that way on the Staff Report to clarify the appropriate party for the development agreement signatures
and application.
Brent, thank you for working to clarify the other question on Page 7.
We appreciate your help as we move forward on this project and look forward to the City Council meeting on
Monday.
Greg Urrutia
New Beginnings Housing, LLC
10525 Perch Road
Caldwell, ID 83607
(208) 455-9661 phone
(208) 459-4543 fax
greg@crestavento.com
From: Brian Billingsley[mailto:bbillingsley@ci.caldwell.id.us]
Sent: Wednesday, October 11, 2006 3:06 PM
To: greg@crestavento.com
Subject: Staff Report
Greg:
Here is the staff report. Please call me if you have any questions...
Brian Billingsley
455-4666
10/16/2006 P 0
Page 1 of 1
David Richey
From: Greg Urrutia [greg@crestavento.com]
Sent: Wednesday, September 13, 2006 5:19 PM
To: Brian Billingsley; David Richey
Subject: 3511 E. Linden St. Zone Change
Brian and Dave:
Thank you for your report and presentation on our request to rezone the property at 3511 E. Linden Street. I
especially appreciate the clarification on the APO-2 overlay. We are confident that we can meet the noise
mitigation requirements of this overlay, and this designation is necessary for us to be able to continue with our
proposal.
If there is anything that we can provide or clarify for the City Council Meeting please don't hesitate to ask.
Greg Urrutia
New Beginnings Housing, LLC
10525 Perch Road
Caldwell, ID 83607
(208) 455-9661 phone
(208) 459-4543 fax
greg@crestavento.com
9/ 14/2006 _�
Memorandum
To: Community Development
From: Gordon Law, City Engineer
Tim King, Engineering Tech II
Re: Case No. ZON-46-06 (New Beginnings Housing LLC)
Date: September 7, 2006
The Engineering Department provides the following comments concerning a request by New
Beginnings Housing LLC to rezone the property located at 3511 E. Linden Street from M-1 Light
Industrial to R-3 Multi Family High Density Residential.
Rights-of-Wav
1. East Linden Street is classified as a Minor Arterial Roadway which requires a minimum forty
(40) foot one half width right-of-way. The applicant shall be required to dedicate as public
right-of-way a forty (40) foot one-half width right-of-way along the East Linden Street frontage
(minus existing) to meet City of Caldwell requirements.
Street
1. Future development will require the applicant to improve East Linden Street to include a 24.5
foot one- half width street section from centerline to back of curb. The street shall feature
standard vertical curb and gutter, 5 foot sidewalks, sub -base and asphalt paving, required
storm water drainage facilities and streetlights.
Sewer & Water
1. Sewer is available from a main line adjacent to the southerly boundary of the subject property
in East Linden Street. Future development will require the applicant to connect to these city
services and comply with the revised Southeast Sewer Study,
2. Water is available from a main line located adjacent to the subject properties southerly
boundary in East Linden Street. Future development will require the applicant to connect to
these city services.
Storm Drain
1. Future development shall require provision is to be made for the disposal of stormwater
drainage in accordance with the City Stormwater Management Policy. A copy of this policy is
available upon request.
Page 1 of 2
FA Z
Irritation
1. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation
District sources. City municipal water may be used only if the criteria specified in the
Landscape Ordinance Section 10-07-12 are met.
General
1. Prior to commencement of construction in any dedicated right-of-way, the City Engineer
staff is to be notified. Appropriate City personnel are to be notified in advance of all required
inspections.
2. Appropriately licensed public works contractors shall perform all construction of public
facilities.
3. All traffic control for the project shall meet the requirements of the Manual on Uniform
Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide a
traffic control plan to the City Engineer for review and secure an appropriate right-of-way
permit prior to any construction within the right-of-way.
4. The applicant shall construct pathways on Indian Creek consistent with City Code.
Page 2 of 2
07/31/2006 07:59 FAX 2084594491 PIONEER IRRIGATION LDWELL P Z 0 001/003
1
Pioneer Irrigation District
JEFF SCOTT'
Superintendent
MARK ZIRSCHKY
Asst. Superintendent
July 28, 2006
City of Caldwell Community Development Department
Fax: 455-3050
Attn: Brian Billingsley
Re: Case No. ZON-46-06 (New Beginnings Housing, LLC)
TO WHOM IT MAY CONCERN:
P.O. BOX 426 + CALDW ELL, IDAHO 83606
(208) 459-3617
NAIDA KELLEHER
SecretaryTreasurer
Please be advised there is a delivery point in place for the property being proposed for development.
Pioneer Irrigation District's main concem is that all water rights within the District be honored, and that
access to irrigation water be provided to every parcel of land. Delivery point for said property is
gate 1 — Stockyard Lateral.
All existing easements, right-of-ways, and other means used to honor the water rights to
downstream waterusers must be maintained and allowed to continue to exist. It is imperative that no
one disrupt the delivery of water to a downstream water user.
Any lateral, canal, drain or other means used to deliver water, along which there is a right-of-way or
easement, must have the same kept clear of all obstructions at all times. No fences, structures, or
other materials are allowed on any of the District's easements or right-of-ways AND they must be
recorded on the final plat. The Stockyard Lateral has a 20 foot recorded easement, 10 feet from
centerline of pipe on each side.
Any discharge or run-off into a federal drain must meet the approval of Mr. John Caywood of the
Bureau of Reclamation. Pioneer Irrigation District does not assume any responsibility for such an
approval. His telephone number is 383-2219.
Note: Indian Creek is not a Bureau of Reclamation facility or a Pioneer Irrigation District
facility. Please contact the US Army Corps of Engineers regarding setbacks along said
facility.
Please be advised that in order to satisfy the City of Caldwell and Canyon County requirements and
IF it is the intent of the developer to put in a pressurized irrigation system and have Pioneer take Over
said system once the development is completed, the following steps are necessary:
07/31/2006 07:59 FAX 2084594491 PIONEER IRRIGATION -+ TWELL P Z Q 002/003
1. Said system must be put in according to the current Standards and Specifications of
Pioneer Irrigation District.
2. A Construction, Operation and Maintenance Agreement must be written up and recorded
at the expense of the Developer and/or owner. All agreements must be reviewed by and
approved by the District's Attorney, Scott Campbell, of Moffatt Thomas in Boise. The
least expensive way to have an agreement drawn up which meets the needs of the District
is by having Mr. Campbell himself draw it up. Otherwise there will be two attorney fees for
said developer and/or owner to pay. Mr. Campbell may be contacted at 345-2000. A
deposit of $1000.00 must be paid to Moffatt Thomas to cover the attorney fees before the
work can begin. Any unexpended portion of the deposit will be refunded. Pioneer
Irrigation District will recommend disapproval of final plat approval until the necessary
agreement has been executed and recorded.
3. The engineering fees will be the responsibility of the developer and/or owner, and a
deposit must be paid in advance to Pioneer Irrigation District before the District will
authorize Mason & Stanfield, Inc. to review engineering plans. Plans must be received
by Pioneer Irrigation District by December 15th 2006. All construction which may
impact district facilities must be completed prior to the March le 2007 deadline.
The construction time frame which Pioneer allows is November 15t of the current
year to March 15th of the following year. Estimated costs for the District's engineering
fees are $500 plus $5.00 per lot. If that amount fails to cover the costs involved due to the
necessity to revise plat maps, etc., additional costs will be billed out and paid prior to the
District's signing off on the final plat.
4. If it is the developers plan to have Pioneer Irrigation District take over a pressurized
irrigation system for the subdivision, it will be necessary that the pump site be designed at
the District's current point of delivery. Service to the subdivision from the pump site must
have its own private delivery line from the delivery point to the subdivision.
5. The developer must contact the office of Mason & Stanfield, Inc. to make arrangements
for on -site inspections to be made at various points of construction. An engineer from
Mason & Stanfield, Inc. must be involved in the inspections as they are the engineers for
Pioneer Irrigation District and are familiar with the requirements of Pioneer_
6. Mason & Stanfield, Inc must walk through the site and develop a punch list to be
completed prior to recommending that Pioneer Irrigation Dlstdct take over the pressurized
irrigation system.
If it is NOT the Intent of the developer to request Pioneer Irrigation District to take over a pressurized
irrigation system within their completed development, then the above six steps do not apply to their
planned development.
07,31/2006 07:59 FAX 2084594491 PIONEER IRRIGATION -►, ALDWELL P Z 1@003/003
Any proposed development which will have downstream waterusers using gravity flow irrigation must
develop their irrigation system in a manner which will insure the downstream waterusers the ability to
acquire at least as much irrigation water for gravity flow irrigation as what they received prior to any
development or construction taking place. The gravity flow irrigation system must be totally separate
from the proposed pressurized irrigation system within a subdivision.
Please be advised, the developer shall submit detailed drawings of any proposed relocations of
Pioneer Irrigation District's facilities, prior to preliminary plat approval. Any said relocations are
subject to approval from the Superintendent and/or the Board of Directors of Pioneer Irrigation District
Any construction that impacts Waters of the United States may require obtaining a 404 permit from
the Corp of Engineers. Greg Martinez of the Corp of Engineers can be contacted at 345-2154.
Prior to finalization of any Agreements with Pioneer Irrigation District, Pioneer Irrigation District must
receive a copy of a 404 permit that has been properly executed. If it is determined by the Corp of
Engineers that a 404 permit is not required, Pioneer Irrigation District must be notified in writing by the
Corp of Engineers that said 404 permit is not required.
NOTE: This letter does not authorize any construction to commence until all the necessary
agreements with Pioneer Irrigation District have been executed and recorded.
If you have any questions, please feel free to call.
Sincerely,
Mark F. Zirschky
Assistant Superintendent
cc: Gordon Law — City of Caldwell Engineering via fax 455-3012