Loading...
HomeMy WebLinkAboutPublic Agencyr� PUBLIC AGENCY DATE SUBMITTED BY ITEM IAA e i*,,o ��Ia �D 1 : w K" ml ng i ne-c Memorandum To: Community Development From: Gordon Law, City Engineer Tim King, Engineering Tech II Re: Case No. ZON-44-06 (John Green 1 GB Redi-Mix) Date: May 10, 2006 The Engineering Department provides the following comments concerning a request by John Green to rezone the property located at 211 North Kit Avenue. Rights-of-WaX 1. Kit Avenue is classified as a Collector Roadway which requires a minimum forty (40) foot one half width right-of-way. Currently a fifty (50) foot one-half width right-of-way exists along the Kit Avenue frontage. Additional right-of-way dedication will not be required at this time. Street 1. The existing curb & gutter along the Kit Avenue frontage is non City Standard and has some areas of disrepair. Future development may require the replacement of said curb & gutter. Sewer & Water The nearest existing sewer is located at the intersection of Simplot Blvd and Kit Avenue approximately 350 feet south of the subject property. Extension of these services is available but will not be required at this time. 2. Water is available from a 10" line located in Kit Avenue adjacent to the subject property. Future development will require the applicant to connect to the City's Municipal Water system if not already connected. Storm Drain 1. Future development shall require provision is to be made for the disposal of stormwater drainage in accordance with the City Stormwater Management Policy. A copy of this policy is available upon request. Page 1 of 2 1 Irri ation 1. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation District sources. City municipal water may be used only if the criteria specified in the Landscape Ordinance Section 10-07-12 are met. General 1. Prior to commencement of construction in any dedicated right-of-way, the City Engineer staff is to be notified. Appropriate City personnel are to be notified in advance of all required inspections. 2. Appropriately licensed public works contractors shall perform all construction of public facilities. 3. All traffic control for the project shall meet the requirements of the Manual on Uniform Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide a traffic control plan to the City Engineer for review prior to any construction within the right- of-way. Page 2 of 2