Loading...
HomeMy WebLinkAboutPublic Agencyr Memorandum To: Steve Hasson From: Ben Weymouth, Assistant City Engineer Re: Case No. ZON-41-04 Applicant: Harold Guenthner Date: May 10, 2004 The Engineering Department provides the following comments concerning a request by Harold Guenther to rezone an approximately 12,880 square foot lot from R-1 (Low Density Residential) zone to an R-2 (Medium Density Residential) zone. The subject property: Lot 3, Block 4 of Terrace Addition No.2 physical address is 1507, 1509, 1511 Teton Ave. 1. Currently there is a 25-foot one-half right-of-way along Teton Ave. The applicant will be required to provide an additional 3 feet to meet City requirements of a 28-foot one-half right-of-way width for a residential roadway. A sample form for this deed may be obtained from our office. 2. This property is currently zoned R-1 (low density residential), which should generate approximately 9.57 vehicle trips per day. The current actual use of the site is generating approximately 28.71 trips per day (information obtained from the institute of transportation engineers " Trip Generation", 61h addition, volumes 1 & 2). 3. Both domestic water and sanitary sewer are available to the site. The applicant will be required to connect to City services if not already connected. Connection fees (if applicable) will be assessed with any Change of Use, Change of Occupancy or Building Permit Application. 4. Provision is to be made for the disposal of stormwater drainage that may occur from the addition of impervious surfaces in accordance with the City Stormwater Management Policy. A copy of this policy is available upon request. 5. All traffic control for the project shall meet the requirements of the Manual on Uniform Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide a traffic control plan to the City Engineer for review prior to any construction within the right-of-way. 6. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation District sources. City municipal water may be used if the criteria specified in the Landscape Ordinance Section 10-07-12 are met. 7. Prior to commencement of construction in any dedicated right-of-way, the City Engineering staff is to be notified. Appropriate City personnel are to be notified in advance of all required inspections. 8. Appropriately licensed public works contractors shall perform all construction within public right-of-way.