HomeMy WebLinkAboutPreliminary Master Plan11
FULL TURN FULL T r..• FULL TURN FULL TURN — FULL TURN — FUTURE SKYWAY ROAD
ACCESS ACCESS ACCESS ACCESS ACCESS EXTENSION BY CITY OF
1W-D' �CALDWELL
Is
1 OVERALL SITE PLAN OPTION B
-1.
FULLTURN
ACCESS
FULL TURN
ACCESS
yb
6
FULL TURN
ACCESS
FULL TURN
ACCESS
FULL TURN
ACCESS
SITE UTILIZATION
TOTAL SITE ACREAGE:
55.63 ACRES
SITE ACCESS
CURB CUTS ON SKYWAY ST. ALLOWED AT
150'-0" SPACING
CURB CUTS ON KCID RD. ALLOWED AT
220'-0" SPACING
BUILDING USAGE
DRY WAREHOUSE: 87,877
CONDITIONED WAREHOUSE: 77,740
TOTAL WAREHOUSE: 16&617
OFFICE: 18,960
DOCK OFFICES: 3,931
ENGINE ROOM: 4,934
MISC: 10,993
PH._1 TOTAL BUILDNG SF: 204A35
TOTAL EXPANSION SHOWN: 217,700
OVERALL BUILDING SF: 422,135
ZONING & SETBACKS
CURRENT ZONING:
AGRICULTURE
URBAN RENEWAL DISTRICT
FUTURE ZONING:
AS NECESSARY TO SUPPORT USES AS PER
CONFIDENTIAL LETTER OF INTENT
MAX HEIGHT;
NONE
SETBACKS':
FRONT: 20'-0"
REAR: 0'-0"
SIDE: 0'-0"
STREET SIDE: 20'-0"
*60'-0" MIN. REQUIRED FOR UNLIMITED
BUILDING SQUARE FOOTAGE WITH FIRE
PROTECTION PER 2012 IBC. (507.3)
Al
HONSEN-RISE
CD N ST 4 r 01 k 0 N
In 7 K CW,holm I
Nampa, ID 93687
F'20R 46S 0200
' 0272
WWWAANSEN-WittV
DO NOT acAL6 DRAMM
COMTRAG IMALL VgN"ALL
CONpgDa AND dNluuDNe
AT ,+NS J,4 ,, M. or
RDAI'!
MONA1IN M.
OR DATCR@ R CIUFAR SEPME
ICAT
YEDtllq ANUR ►AOgCAI,Np
ANYYADNK
Z
4
W
OC ct
Lu a
W a
S
17001210 V■121rr
JRH 212MD17
OVERALL
SITE PLAN
UTILIZATION
E A-101