Loading...
HomeMy WebLinkAboutPreliminary Master Plan11 FULL TURN FULL T r..• FULL TURN FULL TURN — FULL TURN — FUTURE SKYWAY ROAD ACCESS ACCESS ACCESS ACCESS ACCESS EXTENSION BY CITY OF 1W-D' �CALDWELL Is 1 OVERALL SITE PLAN OPTION B -1. FULLTURN ACCESS FULL TURN ACCESS yb 6 FULL TURN ACCESS FULL TURN ACCESS FULL TURN ACCESS SITE UTILIZATION TOTAL SITE ACREAGE: 55.63 ACRES SITE ACCESS CURB CUTS ON SKYWAY ST. ALLOWED AT 150'-0" SPACING CURB CUTS ON KCID RD. ALLOWED AT 220'-0" SPACING BUILDING USAGE DRY WAREHOUSE: 87,877 CONDITIONED WAREHOUSE: 77,740 TOTAL WAREHOUSE: 16&617 OFFICE: 18,960 DOCK OFFICES: 3,931 ENGINE ROOM: 4,934 MISC: 10,993 PH._1 TOTAL BUILDNG SF: 204A35 TOTAL EXPANSION SHOWN: 217,700 OVERALL BUILDING SF: 422,135 ZONING & SETBACKS CURRENT ZONING: AGRICULTURE URBAN RENEWAL DISTRICT FUTURE ZONING: AS NECESSARY TO SUPPORT USES AS PER CONFIDENTIAL LETTER OF INTENT MAX HEIGHT; NONE SETBACKS': FRONT: 20'-0" REAR: 0'-0" SIDE: 0'-0" STREET SIDE: 20'-0" *60'-0" MIN. REQUIRED FOR UNLIMITED BUILDING SQUARE FOOTAGE WITH FIRE PROTECTION PER 2012 IBC. (507.3) Al HONSEN-RISE CD N ST 4 r 01 k 0 N In 7 K CW,holm I Nampa, ID 93687 F'20R 46S 0200 ' 0272 WWWAANSEN-WittV DO NOT acAL6 DRAMM COMTRAG IMALL VgN"ALL CONpgDa AND dNluuDNe AT ,+NS J,4 ,, M. or RDAI'! MONA1IN M. OR DATCR@ R CIUFAR SEPME ICAT YEDtllq ANUR ►AOgCAI,Np ANYYADNK Z 4 W OC ct Lu a W a S 17001210 V■121rr JRH 212MD17 OVERALL SITE PLAN UTILIZATION E A-101