To: Community Development
From: Brent Orton, Assistant City Engineer
Tim King, Engineering Tech II ',4e
Re: SUP 320-08 / ZON 63-08 (Tom Needham)
Date: October 6, 2008
The Engineering Department provides the following comments on a request by Tom Needham for
a rezone of 0.36 acres from R-2 Medium Density Residential to M-1 Light Industrial, a
comprehensive plan map amendment from Medium Density Residential to Industrial, a
development agreement and a special use permit approval for an automobile/vehicle storage yard.
The site is located at 109 W. Freeport.
Rights -of -Way
1. Freeport Ave is classified as a Collector. The applicant shall be required to dedicate as public
right-of-way a thirty-three (33) foot one half width right-of-way along the Freeport Ave frontage
(minus existing) to meet City of Caldwell requirements.
2. Boise Ave is a Residential Street. The applicant shall be required to dedicate as public right-of-
way a twenty-eight (28) foot one half width right-of-way along the Boise Ave frontage (minus
existing) to meet City of Caldwell requirements.
Street
1. Future development shall require the applicant to improve Boise Ave to include an 18.5 foot
half- width street section center -line to back of curb and 4 foot sidewalk. The street shall feature
standard vertical curb and gutter, 4 foot sidewalks, sub -base and asphalt paving and required
storm water drainage facilities. These improvements are to extend the entire length of the
subject property.
2. Any approaches on Freeport Ave will be required to comply with ACHD intersection and
driveway spacing and alignment standards as adopted by the City of Caldwell at a minimum.
3. Any sections of the existing curb gutter & sidewalk along the Freeport Ave frontage that is in
disrepair shall be replaced / repaired to city standards as a condition of approval of this
application.
Water
Page 1 of 2
v
1. Future Development shall require the applicant to connect to the City of Caldwell Municipal
Water System and comply with the City of Caldwell Water Master Study in its most current
form at the time of any development.
Sewer
1. Future development shall require the applicant to extend and connect to the City of Caldwell
Municipal Sewer System.
Storm Drain
1. Future development will require compliance with the City of Caldwell Storm Water
Management Manual. On site detention/retention facilities shall be required for
management of site storm water (including street frontage) for future development.
,Irrigation
Irrigation water for any and all landscaping shall be obtained from applicable Irrigation
District sources.
2. The developer shall maintain any existing upstream drainage rights and downstream
irrigation water supply rights across the property. Appropriate facilities to convey irrigation
and drainage water across the property to take care of any offsite needs shall be included
with the proposed construction drawings.
3. Conveyance systems are subject to irrigation district and City of Caldwell design review and
approval.
Page 2 of 2
rr Page 1 of 1
Anne Marie. Skinner
From:
Dennis C. Wilson
Sent:
Wednesday, October 15, 2008 9:01 AM
To:
Anne Marie. Skinner
Cc:
Dennis C. Wilson
Subject: ZON-63 & SUP-320
ZON-63 & SUP-320
Wednesday, October 15, 2008
8:55 AM
Anne Marie,
The CFD has no objections or concerns as to this SUP other than those expressed during the
Round Table meeting. Our standard requirements will be iterated at the Plan Review
concerning access, fire hydrants, etc.
Thank you.
Dennis.
10/15/08
Created with Microsoft Office OneNote 2003
One place for all your notes
10/15/2008
t
Page 1 of 1
Anne Marie. Skinner
From: Adele Adams
Sent: Wednesday, October 08, 2008 8:35 AM
To: Anne Marie. Skinner
Subject: Case # ZON-63-08 & SUP-320-08
Anne Marie,
A building permit is required for all fencing over 6' in height. Fences over 8' in height may need to be engineered
depending on the fencing material. Any structures added to the site will need a building permit and a certificate of
occupancy prior to using the building.
Thank you,
Adele J. Adams
Plans Examiner
City of Caldwell