HomeMy WebLinkAboutPublic Agencyr _J Memorandum To: Jarom Wagoner, Senior Planner, Planning and Zoning Department From: T.J. Frans, Project Manager, Engineering Dept. Re: SUP-19-01 (Caldwell Fire Station No. 3) Date: January 24, 2019 The Engineering Department provides the following comments on Case Number SUP-19-01: A request by Mark Wendelsdorf and the City of Caldwell for a special -use permit to construct and operate a public facility/building (Fire Station No. 3) with the R-q (Low Density Residential zone. The subject property is located at the southeast comer of KCI D Road and Skyway Street (Parcel R3432500000) in Caldwell, Idaho. General 1. Easements for Public Utilities shall be 15 feet wide for domestic water, 10 feet wide for pressure irrigation and 20' wide for sewer should any of these services be extended within the site with the intent of dedication to the City. 2. All proposed utilities within the boundaries of the development shall be located underground. 3. Water & fire protection facilities must be dedicated to the City. 4. Construction of facilities to be dedicated and/or within public right-of-way shall be performed by an appropriately licensed public works contractor and shall be inspected by and constructed to City of Caldwell specifications. 5. Prior to commencement of construction in any dedicated right-of-way, or construction of any improvement intended for dedication to the City or connected to a City facility, the City Engineering staff is to be notified. This preferably will take place in a pre -construction conference scheduled by the engineer of record in which all appropriate personnel and utilities are present. Appropriate City personnel are to be notified in advance of all testing (including compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of the testing. The engineer of record or his designated representative is to witness all tests (not covered by City inspectors) and a log of inspection visits and testing results is to be kept by the engineer of record or his representative. 6. The applicant is to employ a responsible design professional, preferably the engineer of record, to oversee and inspect construction, to perform and/or observe all requisite testing of completed facilities, and to certify that improvements have been constructed according to approved plans and in compliance with applicable City, State, and Federal standards. Page 1 of 2 po- Street 1. Approaches shall meet requirements as specified in the Caldwell Access Control Standards for State Administered Highways and City Administered Surface Streets Ordinance and shall be approved by the City. Water 1. The location of water service, service sizing and providing of easements, if necessary, are to be decided during review of improvement plans. 2. Water is available from a 12-inch mainline in Skyway Street and KCID Road. Sanitary Sewer 1. Sewer is available from a 10-inch mainline KCID Road. Irrigation 1. The applicant shall maintain any existing upstream drainage rights and downstream irrigation rights across the property. During the design phase of this project, the applicant or their engineer is to contact the appropriate irrigation district to help ascertain these rights. Appropriate facilities shall be provided by the applicant to convey irrigation and drainage water across the property to take care of these offsite needs. 2. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation District sources. City municipal water may be used only if the criteria specified in the Landscape Ordinance Section 10-07-12 are met. Storm Drain 1. Provisions are to be made for the disposal of stormwater drainage in accordance with the City Stormwater Management Manual and any updates adopted subsequent to this application. Page 2of2