PUBLIC AGENCY
ITEM DATE SUBMITTED BY
Ir
Memorandum
To: Jarom Wagner, Senior Planner
From: Robb MacDonald, City Engineer
Re: SUP-18-10NAR-18-02 Temporary Jail
Date: August 10, 2018
The Engineering Department provides the following comments on a request by Paul Navarro and
Canyon County Sheriff's Office for a special -use permit to construct and operate a temporary jail
facility for up to 122 inmates within the T-N (Traditional Neighborhood) Zone. Also requested is a
variance to allow a fence height of up to 12 feet. The subject property is located at the southwest
comer of Chicago Street and 121h Avenue (Parcel R0502100000/R0478600000) in Caldwell, ID.
Development Plans
1. Development Plans — Prior to commencing construction, plans must be prepared by the
developer's engineer and approved by the City Engineering Department which shall include the
following items where applicable:
a. Street section and alignment (including curb and gutter);
b. Sidewalk (5 foot minimum on Chicago Street and 12t' Ave.);
c. Sanitary sewer (per City and DEQ requirements);
d. Potable water (per City and DEQ requirements);
e. Stormwater facilities (per City requirements/manual);
f. Street lighting (per City standards);
g. Street signage (per City and MUTCD requirements);
h. Vertical Datum based on NAVD 88 Datum.
General
1. All utilities within the development shall be located and/or relocated underground.
2. Appropriate easements for emergency access, transmission lines and/or other utilities shall be
clearly indicated, with recorded instrument numbers provided for said easements, on the face
of the final plat (visually and in writing).
Page 1 of 3
r
3. Construction of facilities to be dedicated and/or within public right-of-way shall be performed by
an appropriately licensed public works contractor and constructed to City of Caldwell
specifications.
4. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre -construction
conference scheduled by the engineer of record in which all appropriate personnel and utilities
are present. Appropriate City personnel are to be notified in advance of all testing (including
compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of
the testing. The engineer of record or his designated representative is to witness all tests and a
log of inspection visits and testing results is to be kept by the engineer of record or his
representative.
5. The developer is to employ a responsible design professional, preferably the engineer of
record, to oversee and inspect construction, to perform and/or observe all requisite testing of
completed facilities, and to certify that improvements have been constructed according to
approved plans and in compliance with applicable City, State, and Federal standards.
6. The engineer of record shall be held responsible to ensure that developments improvements
are in substantial compliance with said engineer's design. Following the construction of the
developments improvements, the developers engineer shall provide the City of Caldwell
Engineering Department with electronic dwg. format record drawings spatially referenced to the
Idaho State Plane Coordinate System -West Zone, North America Datum (NAD) 83. Vertical
control shall be referenced to the North America Datum (NAVD) 88 for future reference and to
establish that the engineer of record has caused construction to occur in substantial
compliance with the design of said engineer of record.
7. Any note, item or drawing element on the construction drawings, engineering drawings and/or
design drawings related to the property inconsistent with City Codes, Policies and/or
Ordinances shall not be construed as approved unless specifically addressed and granted by
City Council.
Rights-of-Wav
1. No right-of-way dedication will be require on Chicago Street or 121 Avenue. Sufficient right-of-
way already exists.
Streets
1. Access points shall adhere to the City's Access Control Standards for State Administered
Highways and City Administered Surface Streets Ordinance. Any access point that will be
eliminated or become obsolete, shall be removed and replaced with curb, gutter and sidewalk
per City standards.
Page 2 of 3
r
2. Streetlights shall be provided along Chicago Street and 121' Avenue per City requirements set
forth in the City of Caldwell Supplemental Specifications to the 2015 ISPWC and shall
additionally meet new City LED lighting standards. Information for new LED standards will be
provided upon request.
3. All sidewalks, pedestrian ramps and driveway approaches, new or existing, within the public
right-of-way shall meet requirements specified in the United States Access Board's Proposed
Accessibility Guidelines for Pedestrian Facilities in the Public Right -of -Way, I.S.P.W.C. (2012
edition) and City of Caldwell Supplemental Specifications to the 2012 I.S.P.W.C.. When in
conflict the more restrictive specifications shall apply.
4. An actuated pedestrian crossing signal may be required on the SE leg of the intersection,
crossing Chicago Street, to provide safer passage. Applicant shall coordinate with the City
Engineering Department for planning and identifying specific needs at that location.
Water
1. All on site water mains intended for dedication to the City shall be looped into existing mains for
fire flow and water quality purposes. Appropriate easements for any such dedicated water
system shall be provided to the City for review and approval.
2. The location of water service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans.
Sanitary Sewer
1. Sewer is available from an 8" main line located in the alley adjacent to the site. Said main line
falls within a sixteen (16) public right-of-way alley. No permanent structures are allowed within
said right-of-way.
2. It shall be the responsibility of the applicant's engineer to verify that connection to existing sewer
mainlines will not exceed the functional capacity of said mainlines.
Storm Drain
1. No additional storm drainage requirement will need to be met in conjunction with this project
due to the nature of the proposed facility to be constructed. Current drainage patterns shall be
maintained.
Page 3 of 3
Memorandum
To: Jarom Wagner, Senior Planner
From: Robb MacDonald, City Engineer
Re: SUP-18-10NAR-18-02 Temporary Jail
Date: August 10, 2018
The Engineering Department provides the following comments on a request by Paul Navarro and
Canyon County Sheriffs Office for a special -use permit to construct and operate a temporary jail
facility for up to 122 inmates within the T-N (Traditional Neighborhood) Zone. Also requested is a
variance to allow a fence height of up to 12 feet. The subject property is located at the southwest
comer of Chicago Street and 1201 Avenue (Parcel R0502100000/R0478600000) in Caldwell, ID.
Development Plans
1. Development Plans — Prior to commencing construction, plans must be prepared by the
developer's engineer and approved by the City Engineering Department which shall include the
following items where applicable:
a. Street section and alignment (including curb and gutter);
b. Sidewalk (5 foot minimum on Chicago Street and 121 Ave.);
c. Sanitary sewer (per City and DEQ requirements);
d. Potable water (per City and DEQ requirements);
e. Stormwater facilities (per City requirements/manual);
f. Street lighting (per City standards);
g. Street signage (per City and MUTCD requirements);
h. Vertical Datum based on NAVD 88 Datum.
General
1. All utilities within the development shall be located and/or relocated underground.
2. Appropriate easements for emergency access, transmission lines and/or other utilities shall be
clearly indicated, with recorded instrument numbers provided for said easements, on the face
of the final plat (visually and in writing).
Page 1 of 3
3. Construction of facilities to be dedicated and/or within public right-of-way shall be performed by
an appropriately licensed public works contractor and constructed to City of Caldwell
specifications.
4. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre -construction
conference scheduled by the engineer of record in which all appropriate personnel and utilities
are present. Appropriate City personnel are to be notified in advance of all testing (including
compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of
the testing. The engineer of record or his designated representative is to witness all tests and a
log of inspection visits and testing results is to be kept by the engineer of record or his
representative.
5. The developer is to employ a responsible design professional, preferably the engineer of
record, to oversee and inspect construction, to perform and/or observe all requisite testing of
completed facilities, and to certify that improvements have been constructed according to
approved plans and in compliance with applicable City, State, and Federal standards.
6. The engineer of record shall be held responsible to ensure that developments improvements
are in substantial compliance with said engineer's design. Following the construction of the
developments improvements, the developers engineer shall provide the City of Caldwell
Engineering Department with electronic dwg. format record drawings spatially referenced to the
Idaho State Plane Coordinate System -West Zone, North America Datum (NAD) 83. Vertical
control shall be referenced to the North America Datum (NAVD) 88 for future reference and to
establish that the engineer of record has caused construction to occur in substantial
compliance with the design of said engineer of record.
7. Any note, item or drawing element on the construction drawings, engineering drawings and/or
design drawings related to the property inconsistent with City Codes, Policies and/or
Ordinances shall not be construed as approved unless specifically addressed and granted by
City Council.
Rights -of -Way
1. No right-of-way dedication will be require on Chicago Street or 120, Avenue. Sufficient right-of-
way already exists.
Streets
1. Access points shall adhere to the City's Access Control Standards for State Administered
Highways and City Administered Surface Streets Ordinance. Any access point that will be
eliminated or become obsolete, shall be removed and replaced with curb, gutter and sidewalk
per City standards.
Page 2 of 3
r e-1-
2. Streetlights shall be provided along Chicago Street and 121' Avenue per City requirements set
forth in the City of Caldwell Supplemental Specifications to the 2015 ISPWC and shall
additionally meet new City LED lighting standards. Information for new LED standards will be
provided upon request.
3. All sidewalks, pedestrian ramps and driveway approaches, new or existing, within the public
right-of-way shall meet requirements specified in the United States Access Board's Proposed
Accessibility Guidelines for Pedestrian Facilities in the Public Right -of -Way, I.S.P.W.C. (2012
edition) and City of Caldwell Supplemental Specifications to the 2012 I.S.P.W.C.. When in
conflict the more restrictive specifications shall apply.
4. An actuated pedestrian crossing signal may be required on the SE leg of the intersection,
crossing Chicago Street, to provide safer passage. Applicant shall coordinate with the City
Engineering Department for planning and identifying specific needs at that location.
Water
1. All on site water mains intended for dedication to the City shall be looped into existing mains for
fire flow and water quality purposes. Appropriate easements for any such dedicated water
system shall be provided to the City for review and approval.
2. The location of water service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans.
Sanitary Sewer
1. Sewer is available from an 8" main line located in the alley adjacent to the site. Said main line
falls within a sixteen (16) public right-of-way alley. No permanent structures are allowed within
said right-of-way.
2. It shall be the responsibility of the applicant's engineer to verify that connection to existing sewer
mainlines will not exceed the functional capacity of said mainlines.
Storm Drain
1. No additional storm drainage requirement will need to be met in conjunction with this project
due to the nature of the proposed facility to be constructed. Current drainage patterns shall be
maintained.
Page 3 of 3