COMMUNITY DEVELOPMENT DEPARTMENT
Land Use and Zoning Services
March 1, 2007
Sandra Arreola
808 S. KCID Rd.
Caldwell, ID 83605
Re: Annexation Request
Dear Ms. Arreola:
Your request for annexation is scheduled to be heard by the Planning and Zoning Commission on
Tuesday, March 13, 2007 at 7:00 p.m. I have enclosed a copy of the staff report for your review.
Someone needs to attend this meeting to speak regarding your request.
Please call me at 455-4662 if you have any questions.
Sincerely,
4Qxt
Anne Marie Skinner
Senior Planner
Encl.
CITY HALL 621 CLEVELAND BLVD. - P.O. BOX 1177 • CALDWELL, 10 83605 - (208) 455-3021 (FAX) (208) 455-3050
Memorandum
To: Community Development
From: Gordon Law, City Engineer
Tim King, Engineering Tech II
Re: Case No. ANN-143-06 Sandra Arreloa
Date: January 8, 2007
The Engineering Department does not oppose the request by Sandra Arreloa to annex
approximately .75 acres into the City with R-1 (Single Family Residential) zoning but provides the
following comments regarding future development of the site. The site is located at 808 S KCID
Road.
This application is s a development agreement.
Rights -of -Way
1. KCID is classified as a Collector. The applicant shall be required to dedicate as public right-of-
way a forty (40) foot one half width right-of-way along the KCID Road frontage to meet City of
Caldwell requirements.
Street
1. Future development will require adherence to the City's Infrastructure improvement policy.
Construction of curb, gutter and sidewalk improvements will be required in accordance with
City standards.
2. Future development will require the applicant to improve KCID Road to include a 24.5 foot
half -width street section center -line to back of curb. The street shall feature standard vertical
curb and gutter, 5 foot sidewalks, sub -base and asphalt paving, required storm water drainage
facilities and streetlights.
3. Future development shall require any approaches on KCID Road to comply with ACHD
intersection spacing and alignment standards at a minimum.
Sewer & Water
The applicant has stated this request to annex is to allow connection to the City's
municipal water services. Applicable fees will be assessed prior to connection.
2. Future development of this parcel will require the applicant to connect to the City of
Caldwell Municipal Sewer System.
Page 1 of 2
r
3. The site will be required to comply with the Franklin Sewer Study as updated.
4. The applicant shall provide a 30 foot easement centered over any required sewer trunk
line extension alignments per master plan requirements to facilitate adjacent
developments. The temporary easement shall be retained until replaced by a permanent
easement or recorded public right-of-way.
Storm Drain
1. Future development shall require the disposal of stormwater drainage in accordance with the
City Stormwater Management Manual including any subsequent updates.
Irrigation
1. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation
District sources. City municipal water may be used only if the criteria specified in the
Landscape Ordinance Section 10-07-12 are met.
General
1. Prior to commencement of construction in any dedicated right-of-way, the City Engineer
staff is to be notified. Appropriate City personnel are to be notified in advance for all
required inspections.
2. The applicant shall maintain the site in keeping with the City's nuisance abatement program
until such time as development occurs. The maintenance will include the semi-annual
mowing of all weeds within the subdivision boundaries and the removal of noxious weeds
when they are identified. The developer will apply all appropriate dust abatement
procedures as part of the construction process.
3. The applicant shall develop the site in keeping with provisions of the City's Landscaping
Ordinance. No. 2428 and Tree Ordinance No.2437.
Page 2 of 2
14/27/2006 17:09 FAX 2084594491 PIONEER IRRIGATION i CALDWELL P Z Q 001/002
Pioneer Irrigation District
JEFF SCOTT
Superintendent
MARK ZIRSCHKY
Asat. Superintendent
December 27, 2006
City of Caldwell Community Development Department
Fax: 455-3050
Attn: Brian Billingsley
P_o. BOX 426 - CALDWELL, IDAHO 83606
(208) 459-3617
Re: Case No. ANN-143-06 (Sandra Arreloa 808 S. KCID Road)
TO WHOM IT MAY CONCERN:
NAIDA KELLEHER
Secretary -Treasurer
Please be advised there is a delivery point in place for the property being proposed for development.
Pioneer Irrigation District's main concern is that all water rights within the District be honored, and that
access to irrigation water be provided to every parcel of land. Delivery point for said property is
gate 15 -- 300 Lateral. Note: Delivery point is quite some distance from the above referenced
project.
All existing easements, right-of-ways, and other means used to honor the water rights to
downstream waterusers must be maintained and allowed to continue to exist. It is imperative that no
one disrupt the delivery of water to a downstream water user.
Any lateral, canal, drain or other means used to deliver water, along which there is a right-of-way or
easement, must have the same kept clear of all obstructions at all times. No fences, structures, or
other materials are allowed on any of the District's easements or right-of-ways AND they must be
recorded on the final plat.
Any discharge or run-off into a federal drain must meet the approval of Lupe Rodriguez of the Bureau
of Reclamation. Pioneer Irrigation District does not assume any responsibility for such an approval.
Her telephone number is 383-2221. Solomon Drain — 110 foot Federal Right of Way, 55 feet from
centerline of drain. There is to be no obstructions, fences, buildings, walk paths, etc. within right of
way.
Please be advised that NO change to or crossing of a District facility can take place unless a License
Agreement or Crossing Agreement between the District and the owner/developer of the property has
been signed and recorded. Please contact the District's Attorney, Scott L. Campbell, in writing if you
need to obtain such an agreement. His contact information is: Scott L. Campbell, Moffatt Thomas
1�/27/2006 17:09 FAX 2084594491 PIONEER IRRIGATION 3 CALDWELL P Z 121 002/002
Barrett Rock & Fields, Chtd., 101 S. Capitol Blvd., 100' Floor, Boise, Idaho 83702, phone: (208) 345-
2000, fax: (208) 385-5384.
A License Agreement or Crossing Agreement must be written up and recorded at the expense of the
Developer and/or owner. All agreements must be reviewed by and approved by Mr. Campbell. The
least expensive way to have an agreement drawn up which meets the need of the District is by
having Mr. Campbell himself draw it up_ Otherwise there will be two attorney fees for said developer
and/or owner to pay. A deposit of $1000.00 must be paid to Moffatt, Thomas to cover the attorney
fees before the work can begin. Any unexpended portion of the deposit will be refunded. Pioneer
Irrigation District will recommend disapproval of the final play approval, until the agreement has been
executed and recorded. If construction begins without the required agreement, Pioneer Irrigation
District will pursue judicial relief to stop the construction.
Plans must be received by Pioneer Irrigation District by December I eh, 2006. All construction
which may impact District facilities must be completed prior to the March 15th, 2007 deadline.
The construction time -frame which Pioneer Irrigation District allows is November let of the
current year to March 1 Sth of the following year.
Note: December 15, 2006 deadline has already passed.
Any proposed development which will have downstream waterusers using gravity flow irrigation must
develop their irrigation system in a manner which will insure the downstream waterusers the ability to
acquire at least as much irrigation water for gravity flow irrigation as what they received prior to any
development or construction taking place. The gravity flow irrigation system must be totally separate
from the proposed pressurized irrigation system within a subdivision.
Please be advised, the developer shall submit detailed drawings of any proposed relocations of
Pioneer Irrigation District's facilities, prior to preliminary plat approval. Any said relocations are
subject to approval from the Superintendent and/or the Board of Directors of Pioneer Irrigation District
Any construction that impacts Waters of the United States may require obtaining a 404 permit from
the Corp of Engineers. Greg Martinez of the Corp of Engineers can be contacted at 345-2154.
Prior to finalization of any Agreements with Pioneer Irrigation District, Pioneer Irrigation District must
receive a copy of a 404 permit that has been properly executed. If it is determined by the Corp of
Engineers that a 404 permit is not required, Pioneer Irrigation District must be notified in writing by the
Corp of Engineers that said 404 permit is not required.
NOTE: This letter does not authorize any construction to commence until all the necessary
agreements with Pioneer Irrigation District have been executed and recorded.
If you have any questions or comments, please do not hesitate to call.
Since ly,
Mark F. Zi c. ky
Assistant Superintendent