Loading...
HomeMy WebLinkAboutLand SurveyW RUN—OFF FROM NORTH SIDE OF - APPROACH: combine with run—off from UsticK fill slope (work with ITD), or add to multi —use retention area D D O Z PAVING ALIGNMENT DESIGN BY ITD D (40.0' q RAD.) ITD RE —CONSTRUCTION OF USTICK RD OVERPASS (and this approach) IS SCHEDULED FOR APRIL 2021 _ _ _ ...... USTICK ROAD_I. \_ N8932 . — NEW FoW -- 3322r S86'01 06.- q M Existing gravel paved area. Perform minor re —grading to form PROPOSED MULTI —USE RETENTION AREA for run—off from asphalt —paved parking Existing trees and grass. Perform minor — re —grading and landscaping to receive and treat sheet flow from the parking area en route to the retention area. 1 -- = 20.0 \ / + approach within 1�84_03' — _ ._ ...._._..._..............._...— I NEW Ro—�S83.29 07 W \\ I NEW 36" CULVERT (by ITD) \ i i' NEW GRASS—LINVED \ six. i DRAIN PATH\Rd'• i NEW PAVING BY OWNER x\\ (approach berm; by ITD) \ ±8100 sq ft,,,-f3.7% of \ property \ I �\ I I I 1 1 UN —DEVELOPED LAND I (for paintb III adventures) I I 1 — — 1 I I I I 1 I r I p 1 � as O F V-10 y' 10 9 I Y c, I 1 I o I PROPERTY PLAN (4.85 acre) N SCALE: 1 "= 50.0' 1 1 I FOR CONCEPT REVIEW. (Improvements to Ustick Rd by ITD require the approach for this property to be moved f 130 ft to the east.) As requirements for use of this property by PYRRHIC PAINTBALL: 1. A paved area has been requested with (15) spaces — one of which is to be suitable for a wheelchair van; 2. Paving has been requested from the Utstick RoW line to the parking area. maragement of increases in run—off caused by the paving. Con act Inform 91A Rodney Clark rodney.clark®outlook.com 208 455 2112 -PYRRHIC PAINTBALL VICINITY PLAN SCALE: 1 " = 1000' C�