Loading...
HomeMy WebLinkAboutPublic AgencyL r PUBLIC AGENCY ITEM DATE SUBMITTED BY 4v l c7f2-t I� Dep� "� r [ Memorandum To: Jarom Wagoner, Senior Planner Planning and Zoning Department From: T.J. Frans, Project Manager Engineering Department Re: ANN-19-13 (Ceric Annexation) Date: October 21, 2019 The Engineering Department provides the following comments on Case Number ANN-19-13; A request by Samed Ceric to annex 3.4 acres, more or less, with an M-1 (Light Industrial) Zoning designation. The subject property is located at 1321 Andy Lane (Parcel R0069201000) in Caldwell, Idaho. Right -of -Way 1. Andy Lane is a non -classified roadway. Applicant shall dedicated a 53' full -width right-of-way section along the Andy Lane alignment to the City of Caldwell upon approval of this annexation request. Roadway 1. Applicant shall construct the full -width road section for Andy Lane per City of Caldwell standards and standard drawing R-810E. Improvements shall include, but not limited to, curb, gutter, sidewalk, asphalt paving, street lighting, storm drainage, etc. 2. Applicant may enter into a deferral agreement for the completiontconstruction of the required Andy Lane street section should they desire to do so. 3. All future access points shall comply with the City of Caldwell Access Manual and be approved by the City of Caldwell Engineering Department prior to placement/construction of said access. ANN-19-13 (Ceric Annexation) Page Iof1 '-pp % r r Lori Colli an From: Mark Zirschky <mark@pioneerirrigation.com> Sent: Tuesday, October 22, 2019 3:29 PM To: P&Z Cc: Kirk Meyers Subject: FW: ANN-19-13 Ceric Annexation - Public Agency Memo Attachments: ANN-19-13 Ceric Annexation - Public Agency Memo.pdf Greetings, The attached referenced project may impact Pioneer Irrigation District's 500 (Canyon Hill) Lateral. The 500 Lateral has a 16 foot easement from top of bank, along both sides of the lateral. The easement for the 500 Lateral must be referenced on all plats. Per Idaho Code, 42-1209, written permission must be obtained from Pioneer Irrigation District, prior to any encroachment or modification to the 500 Lateral. Should you have any questions or comments, please do not hesitate to contact me. Mark Zirschky - Superintendent Pioneer Irrigation District 208-459-3617 208-250-8481 www.pioneerirrigation.com From: Lori Colligan <Iolligan@cityofcaldwell.org> Sent: Wednesday, October 16, 2019 9:28 AM To: Robb MacDonald<rmacdonald@cityofcaldwell.org>; Andy Cater<acater@cityofcaldwell.org>; Chris Bryant <cbryant@cityofcaldwell.org>; Dave Wright <dwright@cityofcaldwell.org>; nfrench@caldwellschools.org; Mark Zirschky <mark@pioneerirrigation.com>; Amber O'Neal <amber@pioneerirrigation.com>; trichard@canyonhd4.org; chopper@canyonhd4.org; sarah.arjona@itd.idaho.gov; d3development.services@itd.idaho.gov; jalmeida@canyonco.org; CMiller@compassidaho.org; eadolfson@compassidaho.org Subject: ANN-19-13 Ceric Annexation - Public Agency Memo Hello, Please see the attached public agency memo. Please direct all responses or questions to P&Z,'O'cityofcaldivell.or� Thank you, Lori r A Memorandum To: Jarom Wagoner, Senior Planner Planning and Zoning Department From: T.J. Frans, Project Manager Engineering Department Re: ANN-19-13 (Ceric Annexation) Date: October 21, 2019 The Engineering Department provides the following comments on Case Number ANN-19-13; A request by Samed Ceric to annex 3A acres, more or less, with an M-1 (Light Industrial) zoning designation. The subject property is located at 1321 Andy Lane (Parcel R0069201000) in Caldwell, Idaho. Right -of -Way 1. Andy Lane is a non -classified roadway. Applicant shall dedicated a 53' full -width right-of-way section along the Andy Lane alignment to the City of Caldwell upon approval of this annexation request. Roadway 1. Applicant shall construct the full -width road section for Andy Lane per City of Caldwell standards and standard drawing R-810E. Improvements shall include, but not limited to, curb, gutter, sidewalk, asphalt paving, street lighting, storm drainage, etc. 2. Applicant may enter into a deferral agreement for the completion/construction of the required Andy Lane street section should they desire to do so. 3. All future access points shall comply with the City of Caldwell Access Manual and be approved by the City of Caldwell Engineering Department prior to placement/construction of said access. ANN-19-13 (Ceric Annexation) Page 1 of 1