HomeMy WebLinkAboutSUP22-000030 Westview Lofts FCO updated - SignedCITY OF CALDWELL CASE NO: SUP22-000030 Westview Lofts 2
FINDINGS OF FACT, CONCLUSIONS OF LAW AND ORDER
BEFORE THE CALDWELL HEARING EXAMINER
CITY OF CALDWELL, CANYON COUNTY, IDAHO
IN THE MATTER OF AN APPLICATION
FOR THE CONSTRUCTION OF 2
APARTMENT BUILDINGS WITH 30 UNITS
ON APPROXIMATELY 1.53 ACRES IN A C-3
(SERVICE COMMERCIAL) ZONE.
Property Owner: SRB Seven LLC
)
)
)
)
)
)
)
)
)
)
)
FINDINGS OF FACT,
CONCLUSIONS OF LAW
AND ORDER
Case No. SUP22-000030
This matter came before the Caldwell Hearing Examiner (Examiner) for hearing and consideration
on the 26 day of April 2023, upon a request filed by applicant Greg Urrutia (“Applicant”), on behalf of
New Beginnings Housing, pursuant to all applicable Caldwell City Codes and Idaho Codes.
The Caldwell Zoning Ordinance (Ord. 1451, 12-13-1977) and the Idaho Land Use Planning Act
were used in evaluating the applications. The following standards applied to the subject application
proposals:
Code Code Callout Title
Caldwell City Code 10-01-02 Authority and Purpose
Caldwell City Code 10-01-03 Zoning Districts Purpose Statements
Caldwell City Code 10-02-01 General Regulations
Caldwell City Code 10-02-02 Land Use Schedule
Caldwell City Code 10-02-03 Height, Setback, and Area Schedule
Caldwell City Code 10-02-05 Parking, Loading, and Pedestrian Amenity Standards
Caldwell City Code 10-03-04 Special User Permit Procedures
Caldwell City Code 10-03-12 Neighborhood Meeting
Caldwell City Code Chapter 10, Article 7 Caldwell Landscaping Ordinance
Caldwell City Code 10-01-01 Traffic Impact Study Requirements
Idaho Code Title 67, Chapter 65 Local Land Use Planning
City of Caldwell 2040 Comprehensive Plan
CITY OF CALDWELL CASE NO: SUP22-000030 Westview Lofts 2
FINDINGS OF FACT, CONCLUSIONS OF LAW AND ORDER
Treasure Valley Tree Selection Guide
City of Caldwell 2040 Bicycle and Pedestrian Master Plan
Examiner having heard and taken oral and written testimony, and having duly considered the
matter, hereby makes the following findings, conclusions of law and decision on this matter.
I
RECORD
The record includes, but is not limited to all public testimony, evidence, staff reports,
presentations, exhibits, findings, minutes of the hearing(s); and all applications, plans, and documents
within the official case files.
II
FINDINGS OF FACT, CONCLUSIONS OF LAW
Regarding the request for a Special Use Permit in a C-3 (Service Commercial) zone approximately
1.53 acres on Parcel R1489512700, located in the 25-4N-3W NE SKY RANCH BUS PH 2 LT 7 BLK 3,
the Examiner received and reviewed the record and finds and concludes the following:
A neighborhood meeting was held by the applicant on November 21, 2022, in compliance with
Chapter 10 Article 3 Section 12 of Caldwell City Code.
A public hearing on the requested Special Use Permit were held before the Examiner on April 26,
2023, at which time city staff presented a staff report along with an analysis of the application and all
pertinent information on the case to the Examiner. The applicant then presented the requests; and oral
testimony in opposition, neutral, and in favor were taken and made a part of the permanent record.
Based upon the testimony, information received, and record of evidence presented, the Examiner
APPROVED the request for a Special Use Permit, subject to the conditions herein; and
In approving the request for a Special Use Permit, Examiner concluded the following:
The application decision process has complied with the public notice and hearing requirements of
Idaho Code and Caldwell City Codes; and
SPECIAL USE PERMIT APPROVAL CRITERIA
1. The Examiner has the authority to approve or deny the application;
2. The proposed use would not or will not cause any damage, hazard, nuisance or other detriment to
persons or properties in the vicinity;
3. The proposed use is conditionally permitted by the City of Caldwell ordinances;
4. The proposed use in not in conflict with the comprehensive plan;
CITY OF CALDWELL CASE NO: SUP22-000030 Westview Lofts 2
FINDINGS OF FACT, CONCLUSIONS OF LAW AND ORDER
5. The proposed use does not impact the ability of political subdivisions, including school districts, to
provide services for the proposed use; and
6. The proposed special use meets the required approval criteria and standards as set forth in Caldwell
City Codes.
III
CONDITIONS OF APPROVAL
The approval of the application requests for (SUP22-000030), are subject to the adherence with
the following conditions.
1. Development of the subject property shall be consistent with all requirements, codes, policies,
standards, and regulations of the City of Caldwell, unless specifically stated otherwise in the
development agreement or in the Order of Decision.
2. The development, design, and construction of the Westview Lofts Phase 2 shall be in substantial
compliance with the submitted site plan and elevations (See Exhibit A attached hereto) of Case
File SUP22-000030, or as amended to reflect requirements by City Engineering Department. Any
substantial deviations, as determined by the Planning & Zoning Director, from said Case File
Exhibit, shall require City Council approval, through a public hearing.
3. Any changes to the plans and specifications upon which this approval is based, other than those
required by the above conditions, will require submittal of an application for modification and
approval of that application prior to commencing any change.
4. All improvements and operations shall comply with applicable local, state and federal requirements
and procedures whether specifically addressed in the analysis of this application or not.
5. All requirements from the Fire Department for access, turnarounds, emergency access, water
supply, fire hydrants, etc. shall be met in the development and/or platting of the subject property.
Final approval of the location and number of fire hydrants within the development shall be
determined by the Fire Marshal and take place by phase at the time of submittal of applicable
construction drawings for each phase. In addition, all other conditions as listed in Exhibit 1
Attachment C) must be met.
6. The development shall utilize cluster mailboxes for delivery of mail. Individual mailboxes shall
not be allowed. A cluster mailbox placement plan shall be submitted to the Planning and Zoning
department showing coordination with the United States Postal Services prior to submitting the
construction drawings.
7. The applicant shall post and maintain a “Rules and Regulations” sign at the entryways to the
residential development until it is fully developed. The signs would be intended for subcontractors
performing work and should include: 1) no dogs; 2) no loud music; 3) no alcohol or drugs; 4) no
abusive language; 5) dispose of personal trash and site debris; 6) clean up any mud and/or dirt that
is deposited from the construction parcel onto streets; 7) installation of a temporary construction
fence that would keep debris from being blown off site by the wind; 8) no burning of construction
or other debris on the Property.
8. The applicant shall comply with all landscaping requirements based on Caldwell City Code,
Chapter 10, Article 7.
CITY OF CALDWELL CASE NO: SUP22-000030 Westview Lofts 2
FINDINGS OF FACT, CONCLUSIONS OF LAW AND ORDER
9. Proposed fencing must comply with Caldwell City Code Section 10-02-07.
10. This approval is for this application only. Additional permits, licenses and approvals may be
necessary.
11. The property owner is responsible for the maintenance of all landscaping and screening devices
required.
12. Within twelve (12) months of the date of signature of the Order of Decision of the approved
Special Use Permit, a building permit application shall be submitted for the special use otherwise
the Special Use Permit shall become null and void.
13. If the City of Caldwell has established a design review process at the time of submittal of
development application(s) for the subject property, the applicant will be required to go through
the design review process.
14. The development may not exceed 30 residential units.
15. Provide screening of on-site trash enclosures.
16. If any term or provision of this decision, to any extent, is held invalid or unenforceable, the
remaining terms and provisions hereof shall not be affected thereby, but each such remaining term
and provision shall be valid and enforced to the fullest extent permitted by law.
17. Developer will be responsible for installing sidewalk in compliance with code section 10-07-08
along Hwy 20/26 if ITD does not install one during widening construction.
18. All drive aisles and access must be paved.
CITY OF CALDWELL CASE NO: SUP22-000030 Westview Lofts 2
FINDINGS OF FACT, CONCLUSIONS OF LAW AND ORDER
IV
ORDER OF DECISION AND/OR RECOMMENDATION
The Examiner, based upon the testimony and evidence in record in this matter and upon findings
of fact and conclusions of law set forth herein DOES HEREBY DETERMINE AND DECIDE AS
FOLLOWS: the request for a Special Use Permit in a C-3 (Service Commercial) zone approximately
1.53 acres on Parcel R1489512700, located in the 25-4N-3W NE SKY RANCH BUS PH 2 LT 7 BLK 3,
is APPROVED, SUBJECT TO THE CONDITIONS OF APPROVAL LISTED HEREIN.
These Findings of Fact, Conclusions of Law and Recommendation are approved and adopted by
the Caldwell Hearing Examiner on this 26th day of April 2023
_____________________________________ __________________
Hearing Examiner Date
ATTEST:
______________________
Director
5-31-23
CITY OF CALDWELL CASE NO: SUP22-000030 Westview Lofts 2
FINDINGS OF FACT, CONCLUSIONS OF LAW AND ORDER
Exhibit 1 - Attachment A
Site Plans, Plats, Elevations, and Landscape Plans
8''S8''S 8''S 8''S 8''S8''S8''S8''S8''SSSSWMYDH WM8''W 8''W 8''W 8''W 8''W 8''W 8''W8''W8''W8''W8''W8''W8''W8''WSDSDSDSD SDSDSD SDSDSDSDSDSDSDSDSDSDSDSDPI
PI
PI
PI
PI
PI
PI
PI
PI
PI
PI PIPIPIPIPIPIPIPIPIPIPIPIPIPIPI
PI
PI
PI
PI
PI
PI PIPIPIPIPIPIPIPIPIPIPIPIPIPIPIPIPIPIPIPIPI PI PI PI
SD
EXISTINGSIDEWALKEXISTING SANDAND GREASE TRAPAND EXISTINGSEEPAGE BEDSTORM DRAINLINE AND INLETSSTORM DRAINLINE AND INLETSEXISTINGSIDEWALKEXISTINGVERTICAL CURBCOVERED PARKINGCOVERED PARKINGCOVERED PARKINGCOVERED PARKINGCOVERED PARKINGCOVERED PARKINGAPARTMENT BUILDINGAPARTMENT BUILDINGPROPOSED SEEPAGE BED WITH SAND AND GREASE TRAPPROPOSED SEEPAGE BED WITH SAND AND GREASE TRAPSWATER AND FIRE SERVICESWATER AND FIRE SERVICESHYDRANTSEWER SERVICESEWER SERVICEEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEP EPEP8''W8''W8''W8''W8''W8''W8''W8''S8''S8''S8''S8''S8''S8''SSSEXISTINGBUILDINGSEXISTINGBUILDINGSCONNECTION TO EXISTING SEWER AND WATER LINES IN PHASE 1PROPOSED WATER MAINPROPOSED SEWER MAINSPACE RESERVED FOR THE TURN AROUNDSITE PLAN
102010604022"x34"
CONSULTING ENGINEERS, SURVEYORS & PLANNERS
C 2019 T-O ENGINEERS. THIS INSTRUMENT IS THE PROPERTY OF T-O ENGINEERS. ANY REPRODUCTION, REUSE OR MODIFICATION OF THIS INSTRUMENT OR ITS CONTENTS WITHOUT SPECIFIC WRITTEN PERMISSION OF T-O ENGINEERS IS STRICTLY PROHIBITED.
DESIGNED
DRAWN
CHECKED
APPROVED
BORDER SIZE
DATE
REVISIONS
PROJECT:DATE:NO.
332 N. BROADMORE WAY
NAMPA, IDAHO 83687-5123
WWW.TO-ENGINEERS.COMPHONE: (208) 442-6300
L:\220682\03_CAD\SHEETS\EXHIBITS\220682-C-1.0-SITE DISPLAY.DWG, 2/27/2023
101/2ATTENTION:IF THIS BAR DOES NOT MEASURE1" ON 22x34 SHEET or 1/2" ON11x17 SHEET, THEN DRAWING ISNOT TO SCALESHEET:BOISE ♦ CODY ♦ COEUR D'ALENE ♦ HEBER CITY
MERIDIAN ♦ NAMPA ♦ SPOKANEFeb 27, 2023J. McMULLIN
J. McMULLIN
L. BOND
L. BOND220682WESTVIEW LOFTS 2
DISPLAY FOR:DISPLAY
BUILDING TYPE 1BUILDING TYPE 2US HWY 20/26GENERAL NOTESKEYNOTESSSSITE PLAN1SCALE: 1" = 20'-0"SHEETThis document is the property of THE ARCHITECTSOFFICE, PLLC and is not to be duplicated withoutwritten authorization.REVISIONSDRAWNTHE ARCHITECTS OFFICE, PLLCFEBRUARY 27, 2023FILEFILE NO.DATESEALWESTVIEW LOFTSEXPANSIONCALDWELL, IDPROJECT499 MAIN STREET(208) 343-2931BOISE, IDAHO 83702TAOIDAHO.COMDAVID RUBY, AIAA1.022-605 A1.0SITE PLANOVERALL SITE PLAN2SCALE: NOT TO SCALE BUILDING AREA:BUILDING TYPE 1: . . . . . . . . . . . . . . . . . . . .18,273 S.F.BUILDING TYPE 2: . . . . . . . . . . . . . . . . . . . . 13,926 S.F.TOTAL:. . . . . . . . . . . . . . . . . . . . . . . . . . . . 32,199 S.F.NUMBER OF DWELLING UNITS PROPOSED: . . . . . . 30 UNITS3 BEDROOM UNITS . . . . . . . . . . . . . . . . . . . . . . . . . . . 122 BEDROOM UNITS . . . . . . . . . . . . . . . . . . . . . . . . . . . 121 BEDROOM UNITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6GENERAL SITE NOTESZONE: C-1AREA: 1.81 ACRES (78,844 SF)DENSITY PROPOSED: 16.6 UNITS/ACREPARCEL NO.: R14895127FRONT YARD SETBACK: . . . . . . . . . . . . . . . . . . . . . . . . .0(DUE TO FLAG LOT)REAR YARD SETBACK: . . . . . . . . . . . . . . . . . . . . . . . . 15INTERIOR SIDE YARD SETBACK: . . . . . . . . . . . . . . . . . . 0PARKING:TOTAL SPACES REQUIRED: (1.5 PER UNIT) 30 X 1.5 = 45TOTAL SPACES PROVIDED: . . . . . . . . . . . . . . . . . . . . . 41COVERED: . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 OPEN: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10ACCESSIBLE: . . . . . . . . . . . . . . . . . . . . .1BICYCLE PARKING PROVIDED (1 PER 2 UNITS): . . . . . . . . 15PHASE 1 PARKING:TOTAL SPACES PROVIDED: . . . . . . . . . . . . . . . . . . . . . 89PHASE 1 UNITS:NUMBER OF DWELLING UNITS: . . . . . . . . . . . . . . 50 UNITS3 BEDROOM UNITS . . . . . . . . . . . . . . . . . . . . . . 62 BEDROOM UNITS . . . . . . . . . . . . . . . . . . . . . . 201 BEDROOM UNITS . . . . . . . . . . . . . . . . . . . . . . 24TOTAL COMBINED UNITS:NUMBER OF DWELLING UNITS: . . . . . . . . . . . . . . 80 UNITS3 BEDROOM UNITS . . . . . . . . . . . . . . . . . . . . . . 182 BEDROOM UNITS . . . . . . . . . . . . . . . . . . . . . . 321 BEDROOM UNITS . . . . . . . . . . . . . . . . . . . . . . 30PROJECT SUMMARY
101UNIT2x2-A-1103UNIT2x2-1105UNIT1x1-1107UNIT1x1-A-2111UNIT3x2-1111UNIT3x2-1101UNIT2x2-A-1
103UNIT2x2-1
111UNIT3x2-1
109UNIT3x2-A-118'30'18'30'SHEETThis document is the property of THE ARCHITECTSOFFICE, PLLC and is not to be duplicated withoutwritten authorization.REVISIONSDRAWNTHE ARCHITECTS OFFICE, PLLCNOVEMBER 8, 2022FILEFILE NO.DATESEALPROJECTJBA 2248KCSL1.0LANDSCAPE SITECONCEPT PLANWESTVIEW LOFTSEXPANSIONCALDWELL, ID499 MAIN STREET(208) 343-2931BOISE, IDAHO 83702TAOIDAHO.COMP
RE
LIMIN
A
RYNOT FORC
O
NSTRUC
TIO
N0'20'40'60'1 CITY COMMENTS 12-9-20222 CITY COMMENTS 2-14-2023
CITY OF CALDWELL CASE NO: SUP22-000030 Westview Lofts 2
FINDINGS OF FACT, CONCLUSIONS OF LAW AND ORDER
Exhibit 1 - Attachment B
Engineering Memo and Conditions of Approval
Westview Lofts Phase II
SUP22-000030
Page 1 of 6
Memorandum
To: Alex Jones, Associate Planner
Caldwell P & Z Department
From: TJ Frans, Project Manager
Steven Pendleton, Plans Examiner II
Re: Case Number SUP22-000030 Westview Lofts Phase II
Date: April 14, 2023
The Engineering Department provides the following comments on a request by Greg Urrutia of
New Beginnings Housing, on behalf of SRB Seven LLC @@, for approval of a special use permit
for the 2nd phase of the Westview Lofts Family Community. This second phase will include two (2)
three-story walk-up buildings comprised of 30 total housing units (26 units of affordable workforce
rental housing and four (4) units of market rate housing), with twelve (12) 3-bedrooom units, twelve
(12) two-bedroom units, and six (6) 1-bedroom units. The site is located at 4713 Enterprise Way
(Parcel R1489512700) in Caldwell, Idaho. This application is Phase II of a project started back in
2019, during which time residential was a specially permitted use in a C-3 Zone.
* Due to the nature, complexity and many civil improvements required of multi-family land
development projects the Engineering Department recommends that this project be required to
complete the land development process in the same manner as a standard subdivision and that
said recommendation be made a condition of approval of this application.
Development Plans
1. Development Plans – Prior to commencing construction and applying for building permits,
plans must be prepared by the developer’s engineer and approved by the City Engineering
Department which shall include the following items:
a. Street section and alignment (including curb and gutter);
b. Sidewalk (sidewalk width based on street classification);
c. Sanitary sewer (per City and DEQ requirements);
d. Potable water (per City and DEQ requirements);
e. Stormwater facilities (per City requirements/storm water manual);
f. Street lighting (per City standards);
g. Street signage (per City and MUTCD requirements);
h. Vertical Datum based on NAVD 88 Datum.
Westview Lofts Phase II
SUP22-000030
Page 2 of 6
General
1. Applicant shall follow the requirements and processes of the subdivision ordinance for the
development of this project. For the purposes of this project, all conditions outlined in the
subdivision ordinance pertaining to receiving the City Engineers signature on, or the
recordation of, a final plat shall be applied to the submission of building permits.
2. Easements for public utilities shall be as listed below. Easements will be required to be larger if
deemed necessary by the City Engineer in order to facilitate future maintenance operations of
utilities.
a. 10 feet wide minimum.
b. Domestic water only,15 feet wide minimum
c. Sanitary sewer only, 20 feet wide minimum
d. Sewer and water combined, 30 feet wide minimum
i. Note: future permanent structures will not be permitted to be constructed
within any easement granted to the City of Caldwell. Applicant shall
ensure that civil design and easements provided to the City
accommodate current and future construction needs of permanent
structures such as covered parking structures, future buildings, etc.
3. Appropriate easements for emergency access, transmission lines and/or other utilities shall be
clearly indicated, with recorded instrument numbers provided for said easements, on the
construction drawings.
4. All utilities on and within the boundaries of the subdivision shall be located and/or relocated
underground.
5. All street, sewer, water, fire protection, and street light facilities must be dedicated to the City.
Some conveyance facilities for stormwater drainage may be eligible for dedication to the City.
6. Construction of facilities to be dedicated and/or within public right-of-way shall be performed by
an appropriately licensed public works contractor and shall be inspected by and constructed to
City of Caldwell specifications.
7. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre-construction
conference scheduled by the engineer of record in which all appropriate personnel and utilities
are present. Appropriate City personnel are to be notified in advance of all testing (including
compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of
the testing. The engineer of record or his designated representative is to witness all tests (not
covered by City inspectors) and a log of inspection visits and testing results is to be kept by the
engineer of record or his representative.
8. The developer is to employ a responsible design professional, preferably the engineer of
record, to oversee and inspect construction, to perform and/or observe all requisite testing of
completed facilities, and to certify that improvements have been constructed according to
approved plans and in compliance with applicable City, State, and Federal standards.
Westview Lofts Phase II
SUP22-000030
Page 3 of 6
9. The engineer of record shall be held responsible to ensure that subdivision improvements are
in compliance with said engineer’s design. Following the construction of the subdivision
improvements, the developers engineer shall provide the City of Caldwell Engineering
Department with electronic (.dwg) format record drawings spatially referenced to the Idaho
State Plane Coordinate System-West Zone, North America Datum (NAD) 83. Vertical control
shall be referenced to the North America Datum (NAVD) 88 for future reference and to
establish that the engineer of record has caused construction to occur in substantial
compliance with the design of said engineer of record.
10. Any note, item or drawing element on the plats, construction drawings, engineering drawings
and/or design drawings related to the property inconsistent with City Codes, Policies and/or
Ordinances shall not be construed as approved unless specifically addressed and granted by
City Council.
Rights-of-Way
1. All interior private internal circulation drive isles shall have a minimum width of 26’ (face of curb
to face of curb) and meet Caldwell Fire Department (CFD) requirements. If wider drive isles are
required by CFD Applicant shall meet those requirements.
Street
1. All private driveways/drive isles shall fully comply with City of Caldwell standards and be
approved by the Caldwell Fire Marshall.
2. No lot/building/dwelling unit shall have direct access to/from State Hwy 20/26.
3. Applicant shall coordinate with the United States Postal System to determine a cluster mailbox
unit location. Said location shall be interior to the site and shall be located in a manner that will
not impact, or cause queueing onto, S. Indiana Ave. or Ustick Road.
Water
1. All on site water mains will need to be looped into existing mains for fire flow and water quality
purposes. Internal main sizing and construction plan approval, will be dependent upon the
availability of fire flow.
2. Each buildable lot/building shall be supplied with potable water. If buildings are constructed to
include individual units that could feasibly or will be sold separately, each unit shall be serviced
separately
3. The location of water service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans.
This development will be required to comply with the Water Master Study.
Westview Lofts Phase II
SUP22-000030
Page 4 of 6
Sanitary Sewer
1. It shall be the responsibility of the applicant’s engineer to verify that connection to existing sewer
mainlines will not exceed the functional capacity of said mainlines. Provision for connectivity by
future developments shall be met in accordance with current City standards.
2. The Developer will be required (where applicable) to extend all sewer and water mainlines to the
center of adjacent roadways for connectivity by future developments. Locations of said
extensions will be decided during the review of the improvement plans.
3. Each buildable lot/building shall be provided with individual sewer service. If buildings are
constructed to include individual units that could feasibly or will be sold separately, each unit shall
be serviced separately.
4. Any easements for sewer lines not in the right-of-way should be at a width sufficient to construct
same and not less than 20 feet in width. Easements for adjacent sewer and water lines not in the
right-of-way shall be at a width sufficient to construct the same and shall be no less than 30 feet
in width.
5. A 20’ wide all-weather surfaces may be required to be constructed over mainlines that fall outside
the public right-of-way. All weather surfaces shall be constructed sufficiently to support heavy
equipment necessary to construct and maintain sewer under all seasonal weather conditions.
Irrigation
1. Existing easements and/or right-of-ways for any irrigation facility shall be determined and
clearly indicated on the construction plans. Construction across or re-routing of these facilities
is subject to approval by the Pioneer Irrigation District and at their discretion or their assigns.
2. The Developer shall maintain any existing upstream drainage rights and downstream irrigation
rights across the property. During the design phase of this project, the developer or his
engineer is to contact the appropriate irrigation district to help ascertain these rights.
Appropriate facilities shall be provided by the developer to convey irrigation and drainage water
across the property to take care of these offsite needs. There is to be no discharge of
gravity/pressure irrigation return water into the projects storm water system.
2. The development is to include a non-potable water pressure irrigation system. The design of
this pressure irrigation system is to be reviewed and approved by the Caldwell Municipal
Irrigation District prior to construction plan approval. It shall be required that the system will be
operated and maintained by the Caldwell Municipal Irrigation District.
3. Each lot, or building area, shall be provided with a pressure irrigation service in compliance with
Caldwell Municipal Irrigation District standards.
Westview Lofts Phase II
SUP22-000030
Page 5 of 6
4. All pressure irrigation mainlines shall be located in the public right-of-way or within a public
utility easement, with a minimum width of 10 feet, centered over said mainlines as per current
City standards.
5. Applicant shall place the pump station in an area that is easily accessible with a recorded
perpetual easement sufficient for convenient access and maintenance of said pump station.
The lot shall be owned and maintained by the home owners association.
6. The applicant shall ensure that an adequate continuous irrigation supply flow is available to
meet the pressure irrigation system requirements of CMID.
7. The applicant shall transfer a proportionate share of any existing water right(s), except those
held in trust by an irrigation district, to the City of Caldwell for both irrigation and domestic water
supply for the subject development. If this should occur, The City shall assist in registering the
transfer.
8. The proposed development may utilize an existing pressure irrigation pump station with
approvals from Caldwell Municipal Irrigation District. Any upgrades to the pump station
necessary to supply the proposed development with pressurized irrigation water is the
responsibility of the Applicant. Should Applicant connect to an approved pump station they
shall supply the City of Caldwell with a water model of the whole pressurized irrigation system
showing that the system design meets all Caldwell Municipal Irrigation District standards.
9. All plans and construction drawings submitted to the City of Caldwell for review and approval
for any out-of-season irrigation work to be performed within or across facilities located within (or
owned by) irrigation districts other than CMID shall be submitted to the Caldwell Engineering
Department no later than August 15th. Submittal of plans after this date may result in Applicant
not receiving plan approval in time to complete out-of-season work.
Storm Drain
1. As noted previously, provision is to be made for the disposal of stormwater drainage in
accordance with the City Stormwater Management Manual and any updates adopted
subsequent to this application. A copy of this policy is available upon request. The engineer of
record is to provide calculations, which indicate that the assumptions in his stormwater
drainage plan comply with the requirements of the stormwater manual. In this case, if a storm
water system is existing, the burden of proof is on the developer to verify the capacity is
sufficient for the proposed development.
2. The applicant shall identify and retain all historical drainage discharge points from the property
for the purpose of draining on-site storm water detention facilities.
3. Storm water detention basins are required to remain on-site and are to be operated and
maintained by the Home Owners Association/etc.
4. There is to be no discharge of storm water overflow into any irrigation water return/discharge
facility/ditch/pipe/etc.
Westview Lofts Phase II
SUP22-000030
Page 6 of 6
Building Permits
1. Prior to submission of building permits, public utilities and infrastructure must be completed or
an appropriate construction security provided. A 20% temporary restriction in the issuance of
building permits will be enforced until all utility construction has been completed, inspected,
tested, approved by the City and certified by the Applicants engineer; including completion all
punch list items.
2. Applicant shall submit an electronic (dwg.) copy of the project site plan suitable for mapping
and addressing purposes no later than 30 days prior to submission of the first building permit.
CITY OF CALDWELL CASE NO: SUP22-000030 Westview Lofts 2
FINDINGS OF FACT, CONCLUSIONS OF LAW AND ORDER
Exhibit 1 - Attachment C
Fire Conditions of Approval
403 Blaine Street Caldwell, ID 83605 Phone 208-649-1266 Fax 208-455-3014
Date 2/08/2023
Caldwell City – Planning and Zoning
Re: Case Number SUB22-000033 Westview Lofts 2
Dear Alex Jones, Associate Planner,
The Caldwell City Fire Department District has reviewed and can approve the
application subject to compliance with all the following code requirements and
conditions of approval. Any deviation from this plan is subject to Fire
Department approval. Please note that unless stated otherwise, this memo
represents the requirements of the 2018 International Fire Code (IFC) as adopted
by the Idaho State Fire Marshal’s Office.
Comments:
1. Fire hydrants, capable of producing the required fire flow, shall be
located along approved fire lanes. Fire hydrant spacing shall meet the
requirements of IFC table C105.1.1 (IFC 507.3, IFC B105.2, IFC C105).
2. Roadway serving a fire hydrant shall be a minimum of 26-feet in width.
(IFC D103.1)
3. Dead-end fire apparatus access roads exceeding 150 feet (45 720 mm) in
length shall be provided with an approved area for turning around fire
apparatus. (IFC 503.2.5)
4. Fire apparatus access roads shall extend to within 150 feet of all portions
of the exterior walls of the first story of a building measured by an
approved route around the exterior of the building or facility. (IFC 503.1.1)
5. Monument signage for addressing will be required at the entrance and at
all intersections within the project. (IFC 505.1)
6. Fire apparatus access roads shall have an unobstructed width of not less
than 20 feet and an unobstructed vertical clearance of not less than 13
feet 6 inches. (IFC 503.2.1)
7. The minimum outside turning radius of a fire apparatus access road shall
be 48 feet. The minimum inside turning radius shall be 28 feet. (IFC 503.2.4)
8. Fire apparatus access roads shall have an approved driving surface of
asphalt, concrete or other approved driving surface and can support the
imposed load of fire apparatus weighing at least 75,000 pounds. Please
provide documentation the road surface meets this standard. (IFC
D102.1)
9. Fire apparatus access roads shall not exceed 10 percent in grade. (IFC
D103.2)
403 Blaine Street Caldwell, ID 83605 Phone 208-649-1266 Fax 208-455-3014
10. For streets having a width less than 33 feet back of curb to back of curb
parking shall be restricted on one side; for streets having a width less than
27 feet back of curb to back of curb parking shall be restricted on both
sides. A note on the face of the final plat is required noting the parking
restriction prior to signing of the final plat. In addition, No Parking signs shall
be installed in accordance with the requirements of the IFC. (IFC 503.8)
11. Access gates shall comply with requirements of the IFC. If gates are
electronically operated, they shall be equipped with an automatic
opening mechanism activated by the Opticom system. Manual gates
shall be secured with a Knox brand padlock (IFC 503.6, D103.5).
12. Approved secondary access roads shall be provided per section D106 of
the 2018 IFC.
13. D105.1 Where required. Where the vertical distance between the grade
plane and the highest roof surface exceeds 30 feet (9144 mm), approved
aerial fire apparatus access roads shall be provided. For purposes of this
section, the highest roof surface shall be determined by measurement to
the eave of a pitched roof, the intersection of the roof to the exterior wall,
or the top of parapet walls, whichever is greater.
14. D105.2 Width. Aerial fire apparatus access roads shall have a minimum
unobstructed width of 26 ft. (7925 mm), exclusive of shoulders, in the
immediate vicinity of the building or portion thereof.
15. D105.3 Proximity to building. One or more of the required access routes
meeting this condition shall be located not less than 15 feet (4572 mm)
and not greater than 30 feet (9144 mm) from the building, and shall be
positioned parallel to one entire side of the building. The side of the
building on which the aerial fire apparatus access road is positioned shall
be approved by the fire code official.
16. D105.4 Obstructions. Overhead utility and power lines shall not be located
over the aerial fire apparatus access road or between the aerial fire
apparatus road and the building. Other obstructions shall be permitted to
be placed with the approval of the fire code official.
17. Fire Sprinkler/Alarm Plans shall be a separate submittal for approval and
submitted to the Caldwell City for Fire Marshal’s Office review and
approval before installation.
18. Per local requirement a fire hydrant shall be within 150 feet. of the FDC
General Requirement:
Fire Department required fire hydrants, access, and street identification shall be
installed prior to construction or storage of combustible materials on site.
Provisions may be made for temporary access and identification measures.
403 Blaine Street Caldwell, ID 83605 Phone 208-649-1266 Fax 208-455-3014
Specific building construction requirements of the International Building Code,
International Fire Code and City of Caldwell Code will apply. However, these
provisions are best addressed by a licensed Architect at time of building permit
application.
Regards,
Alan Perry
Division Chief
Fire Marshal
Caldwell Rural Fire Protection District
Aperry@cityofcaldwell.org