Loading...
HomeMy WebLinkAboutPublic AgencyPUBLIC AGENCY ITEM DATE SUBMITTED BY �..�,��►� cog-�`'�/ � J ..,.,,�-Q ✓�'"'��-�, Vi"Ul- �" � � • L ` 1rc7( Memorandum To: Community Development From: Robb MacDonald, City Engineer Tim King, Engineering Tech III Re: Case No. ANN-15-05 Jacksons Food Stores Inc. Date: Nov 6, 2015 The Engineering Department does not oppose a request by Jacksons Food Stores Inc. to annex approximately 6.70 more or less, with an H-C (Highway Corridor) zoning designation and development agreement. The subject property is located at 20078 Middleton Rd. Rights -of -Way 1. Hwy 20/26. is classified as a Principal Arterial. Existing right -of- way along the subject properties Hwy 20126 frontage equals fifty (50) feet. The applicant shall dedicate an additional twenty (20) feet along the subject properties entire Hwy 20126 frontage to meet current city requirements. Additionally, the applicant is required to meet any additional right-of-way requirements of the Idaho Transportation Department. 2. Middleton Road is classified as a Principal Arterial. Existing right-of-way along the subject properties Middleton Road frontage equals thirty-three (33) feet. The applicant shall dedicate and additional fifteen (15) feet of right-of-way along the subject properties entire Middleton Road frontage to meet current City requirements. Additionally, the applicant is required to meet any additional right-of-way requirements of the Canyon Highway District #4. Street 1. No street widening improvements will be required along Highway 20126 except for potential improvements on the immediate corner to tie into Middleton Road. 2. Future development shall require the applicant to improve Middleton road along the proposed site's west frontage. This will include (but is not limited to) street lights, signage, curb, gutter, sidewalk, and asphalt to meet a section width of thirty-five (35) feet from top back of curb to centerline. Traffic Mitigation The following are the required traffic related mitigation measures for the Jacksons Food Store resulting from the traffic impact study dated Dec 19'h, 2014 by 6 Mile Engineering pursuant to City Code Chapter 10, Article 10 and analysis provided by the City. 1. Jacksons is expected to generate 1,953 trips per day and 72 new trips in the critical (P.M.) peak hour. Community Planning Association of Southwest Idaho has computed the average trip length in Canyon County to be 7.3 mi. Traffic impact mitigation should presumably occur Page 1 of 4 �i► r r at both trip ends so'/z of the trip length should be attributed to each end. It is estimated that trips will encounter a major intersection every half mile along any given path. The capacity of an average fully improved intersection (assumed to be the intersection of a collector and an arterial road) is estimated to be 5,080 vehicles/hour. The total traffic mitigation required by Jackson's is determined to be 10.3% (72 new PM Peak * 7.3 miles/trip * 0.5 trip ends * 2 trips 15080 vehicleslhr) of a typical intersection (or the value of a typical intersection). a) The owner/developer/applicant shall design and construct roughly 10.3% of the signalization improvements needed for an average intersection, as defined, at one or more nearby (within 3.5 miles of the site) deficient locations to be determined by Engineering staff. The Engineering staff shall have reasonable discretion to determine the sites of construction and what design and construction equals roughly 10.3% of the signalization improvements needed for an average intersection. Engineering staff can provide information about applications with whose mitigation efforts the owner/developer/applicant can combine to achieve even units of 100%. i) The owner/developer/applicant may be allowed, at his option, to contribute monies in lieu of construction to the City of Caldwell Roadway Trust Fund, but the basis for the obligation is for construction. Monetary contributions must be made at a level commensurate with costs to construct the same by the City and as estimated by the City. This alternate provision for payment of money is not a requirement, is for the benefit and convenience of the own erldeveloperlapplicant only and does not constitute an Impact Fee. ii) Improvements needed at and near the intersection of US 20126 and Middleton Rd may be considered in lieu of some part or all traffic mitigation requirements. Measures that may qualify for this purpose include: (1) Added right-of-way and widening to accommodate turn lanes above and beyond what is required for access directly to this development (per City review). (a) Right-of-way provided for this purpose should be credited toward signal mitigation at raw land value. (b) Added Asphalt above the minimum required shall be credited based on actual cost or contract bid. iii) The average cost of a typical intersection is estimated at $425,000 for procurement of design services, construction, and associated costs by the City, of which 10.3% of that cost is what Jackson's contribution shall be. 3. The owner/developer/applicant shall keep the City informed of and comply with any additional requirements Idaho Transportation Department has the final authority to impose. Requirements of ITD shall be met independent of requirements of the City. ITD standards shall be followed for roadway section depth on Highway 20126. The more strict of City or State requirements shall be followed for roadway width and traffic mitigation measures on Highway 20126. 4. Install the following improvements as per the Traffic Impact Study: a) A dedicated westbound right turn lane on Hwy 20126 at the access point on Hwy 20126. b) A dedicated eastbound left turn lane on Hwy 20126 at the access point on Hwy 20126. c) A dedicated northbound right turn lane on Middleton Rd at the access point on Middleton Rd. Page 2of4 r d) Restriping of existing left hand turn lanes on Hwy 20126 and Middleton Rd to extend the storage length (as specified in the Traffic Impact Study). i) The foregoing improvements shall be designed to accommodate heavy vehicles as well as passenger car traffic to minimize delay to development patrons and other passenger car traffic. ii) Dedicated turn lanes shall meet all current standards for length and taper. Water 1. Water is available from an existing 12" line at Colville Court and Hwy 20126. Future development shall require the applicant to extend these services east along Hwy 20126 in a twelve (12) inch mainline to the subject property and meet any requirements established by the City's water master plan. This mainline shall be extended to and through the site, meaning, it shall be extended along the entire frontages of the property on both Middleton and Hwy 20126. Sewer 1. The subject property is intended to be served from a twenty-four (24) inch mainline per the Franklin Sewer Study 2005 updates. Currently that trunk line extends to the intersection of Hwy 20126 and KCID Road. The City has agreed to allow an interim commercial septic system to facilitate immediate development of the subject parcel. The applicant shall agree to connect to said trunk line and abandon the interim septic system at the time said trunk line has been extended to the subject property. The applicant shall agree to pay any re-imbursement fees associated with said trunk line extension. Additionally, the applicant shall agree to construct the designated portion of said trunk line extending along the entire subject property's Hwy 20126 frontage as part of this project. All sewer connection fees shall be paid once City Sewer is connected to the proposed site and the site is served by the City. Storm Drain 1. Future development shall require the disposal of stormwater drainage in accordance with the City Stormwater Management Manual including any subsequent updates. All flood way and flood plain issues must be in compliance with City and FEMA standards and requirements. Irriaation 1. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation District sources. City municipal water may be used only if the criteria specified in the Landscape Ordinance Section 10-07-12 are met. General 1. Prior to commencement of construction in any dedicated right-of-way, the City Engineer staff is to be notified. Appropriate City personnel are to be notified in advance for all required inspections. Page 3 of 4 r 2. The applicant shall maintain the site in keeping with the City's nuisance abatement program. The maintenance will include the semi-annual mowing of all weeds within the parcel boundaries and the removal of noxious weeds when they are identified. 3. The applicant shall develop the site in keeping with provisions of all applicable City Ordinances and Policies. Page 4 of 4 A Communities in Motion 2040 Development Checklist The Community Planning Association of Southwest Idaho (COMPASS) is the metropolitan planning organization (MPO) for Ada and Canyon Counties. COMPASS has developed this checklist as a tool for local governments to evaluate whether land developments are consistent with the goals of Communities in Motion 2040 (CIM 2040), the regional long-range transportation plan for Ada and Canyon Counties. CIM 2040 was developed through a collaborative approach with COMPASS member agencies and adopted by the COMPASS Board on July 21, 2014. This checklist is not intended to be prescriptive, but rather a guidance document based on CIM 2040 goals, objectives, and performance measures. A checklist user guide is available here; and more information about the CIM 2040 goals can be found ere; and information on the CIM 2040 Vision can be found here. Name of Development: Jackson's Food Stores Annexation 1x. Rowe - M.W RoMbl] A• Click here for detailed map. Summary: Located to the northeast of Middleton Rd and Hwy 20/26, there are no other current developments in near proximity. The proposal supports 10 CIM 2040 checklist items and does not support 10 CIM 2040 checklist items. A traffic impact study was not recieved for this location so a complete streets level of service evaluation was not completed. Land Use In which of the CIM 2040 Vision Areas is the proposed development? (Goal 2_1)? O Downtown O Employment Center O Existing Neighborhood O Foothills O Future Neighborhood ® Mixed Use O Prime Farmland O Rural O Small Town O Transit Oriented Development O Yes O No O N/A The proposal is within a CIM 2040 Major Activity Center. (Goal 22=3) Neighborhood (Transportation Analysis Zone) Demographics TAZ:2210 Existing Existi Households Jobs Households lobs Households Jobs 10 57 10 68 1152 860 `Employment was estimated using 2014 Jackson s employment data ® Yes O No O N/A The number of jobs and/or households in this development is consistent with jobs/households in the CIM 2040 Vision in this neighborhood. (Goal 2_1) Area (Adjacent Transportation Analysis Zone) Demographics TAZs: 2105, 2200, 2202, 2227, 2237, 2239, 2240, 2255. 2256 Existing Existi Households Jobs Households Jobs 1 Households Jobs 378 1 352 378 363 3,749 2.326 ® Yes O No O N/A The number of jobs and/or households in this development is consistent with jobs/households in the CIM 2040 Vision in this area. (Goal 2_1) More information on COMPASS and Communities in Motion 2040 can be found at: www.compassidaho.org Email: info@compassidaho.org i Telephone: (208) 475-2239 (Page I of 2) COMPASS COMMUNity PLANNING ASSOCIATION bi SV yihw#i} 1`�'#fiC 1 5 Ad Communities in Motion 2040 Development Checklist Transportation O Attached 4 N/A An Area of Influence Travel Demand Model Run is attached. O Yes O No O N/A There are relevant projects in the current Regional Transportation Imorovement Projects (TIP) within one mile of the development. Comments: See next page _ O Yes O No O N/A The proposal uses appropriate access management techniques as described in the COMPASS Access Management Toolkit. Comments: See next page OYes ONo ON/A This proposal supports Valley Regional Transit's va/leyconnect plan. See Valley Regional Transit Amenities Development Guidelines for additional detail. Comments: Future public transportation services are proposed on US 20/26. See valle connect for details. The Complete Streets Level of Service (LOS) scoring based on the proposed development will be provided on an separate worksheet (Goals 1.1. 1.2, 1.3. 1.4. 2.4): O Attached O N/A Complete Streets LOS scorecard is attached. O Yes O No O N/A The proposal maintains or improves current automobile LOS. O Yes O No O N/A The proposal maintains or improves current bicycle LOS. O Yes O No O N/A The proposal maintains or improves current pedestrian LOS. O Yes O No O N/A The proposal maintains or improves current transit LOS. O Yes O No O N/A The proposal is in an area with a Walkscore over 50. Housing O Yes O No O N/A The proposal adds compact housing over seven residential units per acre. (Goal 2.3) 4 Yes O No O N/A The proposal is a mixed -use development or in a mixed -use area. (Goal 3_1) O Yes O No O N/A The proposal is in an area with lower transportation costs than the regional average of 26% of the median household income. (Goal 3_1) O Yes O No O N/A The proposal improves the jobs -housing balance by providing housing in employment -rich areas. (Goal 3_1) Community Infrastructure O Yes ® No O N/A The proposal is infill development. (Goals 4.1. 4.2) O Yes O No O N/A The proposal is within or adjacent to city limits. (Goals 4.1. 4.2) O Yes O No O N/A The proposal is within a city area of impact. (Goals 4.1-4.2) Health O Yes ® No O N/A The proposal is within 1/4 mile of a transit stop. (Goal 5_1) O Yes O No O N/A The proposal is within 1/4 mile of a public school. (Goal 5_1) O Yes ® No O N/A The proposal is within 1/4 mile of a grocery store. (Goal 5.1) O Yes O No O N/A The proposal is within 1 mile of a park and ride location. (Goal 5_1) Economic Development 4 Yes O No O N/A The proposal improves the jobs -housing balance by providing employment in housing -rich areas. (Goal 3_1) O Yes O No O N/A The proposal provides grocery stores or other retail options for neighborhoods within 1/2 mile. (Goal 6_1) Open Space O Yes O No O N/A The proposal is within a 1/4 mile of a public park. (Goal ) O Yes O No O N/A The proposal provides at least 1 acre of parks for every 35 housing units. (Goal 7_1) Farmland O Yes O No O N/A The proposal is outside "Prime Farmland" in the CIM 2040 Vision. (Goals 4.1, 8.2) Q Yes O No O N/A The proposal is outside prime farmland. (Goal 8_2) eft } (Page 2 of 2) � r Transportation Improvement Projects (TIP) Comments: ITD is designing reconstruction, realignment, and widening of US 20/26 from Smeed Parkway to Middleton Road in Caldwell, construction is considered "unfunded" at this time. ITD plans to add right turn lanes and paved shoulder to three intersections along the US 20/26 corridor (Midland, Northside, and Can -Ada) in FY2020. Access Management Comments: U.S. 20/26 is one of the few east -west roadways in the Treasure Valley that runs from Caldwell to Boise and is identified as an Expressway in the 2040 Functional Classification map. The applicant is requesting a temporary full access on US 20/26 and a full access on Middleton Road. The Idaho Transportation Department (ITD) is in the final stages of the environmental assessment for U.S. 20/26 from Eagle Road west to I-84 to include recommended roadway improvements and to identify right-of-way needs between now and 2040. The planning process is expected to be completed by the end of 2016. Additional information is available on the ITD website at: http://apes.itd.idahc.ciov/apps/u520 6CorridQrStudy/default.htmi COMPASS would encourage the applicant to coordinate access with Jim Morrison at ITD, District3 at Jim. Morrison6 itd.idaho.aov or (208) 334-8300. f 0 1 �DAHO r w S � �4o TATfON 4�QPQ~ r IDAHO TRANSPORTATION DEPARTMENT P O. Box 8028 Boise, ID 83707-2028 October 23, 2015 Jarom Wagoner City of Caldwell Planning and Zoning Department 621 Cleveland Blvd. Caldwell, ID 83605 VIA EMAIL RE: ANN-15-05 JACKSON'S FOOD STORE li (208) 334-8300 itd.idaho.gov The Idaho Transportation Department (ITD) has reviewed the referenced annexation application for the Jackson's Food Store located at 20078 Middleton Road north of US-20126. ITD has the following comments: 1. ITD has no objection to this application and does not require any mitigation. 2. Applicant must apply for and receive an approved Right -of -Way use permit prior to doing any work or activity within the highway Right -of -Way. Please have the applicant contact Shona Tonkin at 334-8341 for this permit. 3. The applicant is requesting a temporary access to US-20/26 at approximately 828 feet center to center upstream from a signalized intersection. IDAPA 39.03.42 rules for an Urban State Route over 35 mph upstream from a public road intersection is 790 feet. It appears this access would meet current IDAPA 39.03.42 rules. 4. ITD's corridor plan requires a minimum of 70-ft of right-of-way as measured from the section line in US-20.26. The supplied plat drawing appears to show the existing 50-ft of right-of-way plus an additional 20-ft for a future right-of-way acquisition. This plat appears to meet ITD minimum right-of-way requirements. 5. Future plans for the US-20i26;'Middleton Road intersection are for a half Continuous Flow Intersection (CFI) to be constructed. 6. No trees are allowed within the clear zone of the ITD Right -of -Way. Only planting of forage, plants, grasses, flowers, and shrubs with a mature height not to exceed 3 feet will be allowed. 7. No rocks over 4 inches maximum size will be allowed in the ITD Right -of -Way. 8. Section 49-221 of the Idaho Code restricts the placement of any hedge, shrubbery, fence, wall, or other sight obstructions of any nature where they constitute a traffic hazard at the intersection of roads with other roads, private alleys, bike or pedestrian paths when they are within the "vision triangle" of vehicle operators. The boundaries of the "vision triangle" are defined as follows: a. By extending perpendicular lines along the face of curb from their point of intersection 40 feet in either direction; and W r b. By a height between 3 feet and 10 feet above the existing centerline highway elevation. VISION TRIANGLE 1 la I Face of Curb of Edge of Pavement V11;1on Triangle to be clear of obstructions taller than 36 9. Irrigation systems shall be no closer than 5 feet from the pavement edge and shall be adjusted so as not to cause water to cover any portion of the highway pavement. 10. Provisions shall be established for the responsibility of future maintenance of any landscaping within ITD Right -of -Way. 11. Idaho Code 40-1910 does not allow advertising with the right-of-way of any State highway system. 12. IDAPA 39.03.60 rules govern advertising along the State highway system. If you have any questions, you may contact Shona Tonkin at 334-8341 or me at 332-7191. Sincerely, James K. Morrison Development Services Manager j im. mon•ison6i,itd. idaho.gov Pioneer Irrigation District P.O. BOX 426 • CALDWELL, IDAHO 83606 (208) 459-3617 www,pioneerirri gation. com October 21, 2015 City of Caldwell Planning and Zoning Department Jarom Wagoner, Senior Planner Email: jwagoner@cityofcaldwell.org Re: Case No. ANN-15-05 (Jacksons Food Stores) Annexation TO WHOM IT MAY CONCERN: Please be advised that an irrigation water delivery point exists for the property being proposed for development. Pioneer Irrigation District's main concern is that all water rights within the District are honored, and that access to irrigation water be provided to every parcel of land. The delivery point for the subject property is headgate 12 — 100 Lateral. All irrigation water distribution and drainage facilities, together with their corresponding easements and rights -of -way, must be protected and retained. It is imperative that no one disrupt the delivery and or drainage of irrigation water to from Pioneer patrons. Pioneer Irrigation District's water rights are specific in the method in which the water is used; the water rights are for irrigation use only. The water may not be used for any other application including but not limited to industrial uses and watering livestock. The easements and rights -of -way of all laterals, canals, drains and other facilities used to deliver or drain irrigation water, must be kept clear of all encroachments and obstructions at all times. No fences, structures, or other encroachments are allowed on any of the District's easements or rights -of -way. Further, all irrigation easements and rights -of -way must be recorded on the final plat. There are to be no encroachments within Pioneer Irrigation District easements unless specifically authorized by the District in writinp, as determined on a case -by -case basis. A Land Use.. Encroachment Application (copy attached) must be completed and submitted to Pioneer Irrigation District prior to engineering review or the drafting of any agreements �)� Z r permitting the reconfiguration, relocation, or modification of, encroachment upon Pioneer Irrigation District facilities or their corresponding easements and rights -of -way. Please be advised that NO change to.�or crossing of a District facility can take place unless a License or Crossing Agreement between the District and the ownerideveloper of the property has been signed and recorded. Pioneer Irrigation District will recommend disapproval of the final plat approval, until the pertinent agreement has been executed and recorded. If construction begins without the required agreement, Pioneer Irrigation District will seek judicial relief to stop the construction. Pioneer Irrigation District requests that plans be received by November 15"', 2015. All construction which may impact District facilities must be completed prior to the March 1", 2016 deadline. The construction time -frame which Pioneer Irrigation District allows is November 1"' of the current year to March 1" of the following year. Any proposed development upstream of water users dependent upon gravity flow -based irrigation methods must be designed in a manner that protects and maintains the existing downstream irrigation facilities and methods. All Proposed pressurized irrigation systems must be separate from the existing gravity flow based irrigation system to the extent possible (with the exceptions of diversion intake structures and return flow/bypass structures). Please be advised the developer shall submit detailed engineering drawings of any proposed relocations or modifications of Pioneer Irrigation District facilities, prior to preliminary plat approval. All facility relocations or modifications are subject to the prior approval of the Superintendent and/or the Board of Directors of Pioneer Irrigation District. If construction is not completed by March 1" in a manner which allows for adequate delivery of water, Pioneer shall perform or cause whatever work is necessary to allow adequate delivery of water to patrons. This work will be performed at the convenience and discretion of Pioneer Irrigation District. The developerilandowner shall pay the costs of this remedial work. Any encroachment upon, or discharge of water into, a federal drain must meet the prior written approval of Lupe Rodriguez of the Bureau of Reclamation. Pioneer Irrigation District does not assume any responsibility for such an approval. Her telephone number is 383-2221. As with Pioneer Irrigation District facilities, there shall be no encroachments or obstructions constructed or placed within the federal facility rights -of -way absent the prior written permission of the Bureau of Reclamation. The Mason Creek Drain has a 110 foot federal right of way, 55 feet from centerline of drain. Any construction impacting Waters of the United States may require a Clean Water Act Section 404 permit from the United States Army Corps of Engineers. Greg Martinez of the Army Corps of Engineers can be contacted at 345-2154. Prior to finalization of any agreements with Pioneer Irrigation District, Pioneer must receive a copy of a Section 404 permit that has been properly executed. If the Army Corps of Engineers r determine that a Section 404 permit is not necessary for the proposed project, Pioneer Irrigation District must be notified in writing by the Army Corps of Engineers that the Section 404 permit is not required. NOTE: This letter does not authorize any construction to commence until all the necessary agreements with Pioneer Irrigation District have been executed and recorded. If you have any questions or comments, please do not hesitate to call. Sincerely, Mark Zirschky Superintendent cc: Lupe Rodriguez — Bureau of Reclamation via email MEMO Date: To: From: RE: r October 15, 2015 Robb MacD nald En D rt t rA ac-L 4 �LA t,l ck` o gmeenng epa men Andy Cater, Fire Marshal Chris Bryant, Building Department Brett Clark, Building Department Dave Wright, Police Department Pat Charlton, Vallivue School District Mark Zirchsky, Pioneer Irrigation District Carl Miller, Compass Jim Morrison, Idaho Transportation Department Rhonda Jalbert, Valley Regional Transit Bob Parsons I David Loper, Southwest District Health Don Walz, Idaho Power Mishelle Singleton, Intermountain Gas Deputy Area Manager — MSFO, DOI Bureau of Reclamation Greg Martinez, Corps of Engineers Rick Ward, Idaho Fish and Game Ked K. Smith-Sigman, CFM, Department of Water Resources Jarom Wagoner, Senior Planner Caldwell P & Z Department Case Number ANN-15-05 Jacksons Arinexatiun Cec�L_ CuL prop. � 's T� Attached please find a land use application that you are invited to review. This case is scheduled to be presented before the Hearing Examiner on Tuesday, November 10, 2015 at 7:00 pm. Case No, ANN-15-05: A request by Jacksons Food Stores Inc. to annex 6.70 acres, more or less, with an H-C: (Highway Corridor) zoning designation, and development agreement. The subject property is located at 20078 Middleton Road, Caldwell, Idaho. Please review the attached application and information and provide me with your written input. I request that you e-mail any comments to me as soon as possible but no later than Friday, October 30, 2015. E-mail. jwagonor@cityofealdwoll.org I will assume that you have no objections, concerns or comments if you do not reply to this request within the requested timeframe. If you have any questions, you may contact me at 455-4662. V��' lad �- T r iU April Cabello From: Chris Bryant Sent: Monday, October 19, 2015 7:56 AM To: April Cabello Cc: Jarom Wagoner Subject: RE: Public Agency Memo ANN-15-05 Jacksons Annexation It would appear after a scan of the information that my only concerns would be engineering/constructing the site taking into account the base flood elevations and the flood plait,. From: April Cabello Sent: Thursday, October 15, 2015 4:52 PM To: April Cabello; Robb MacDonald; Andy Cater; Brett Clark; Dave Wright; Chris Bryant; Jim Morrison (Development Services); rnarsons phd3.state.id.us; david,loper@phd3.idaho.gov; dwalz(&idahopower.com; MISHELLE.SINGLETON(alintgas.com; greg.j.martinez@usace.army.mil; rick.ward@idfg.idaho.gov; keri.sigman@idwr.idaho.gov; pcharlton@vallivue_.org; Amber Jaquier-Page; mark oioneerirriaation.com; Carl Miller; daIbert@vaIleyregionaItransit.or Subject: RE: Public Agency Memo ANN-15-05 Jacksons Annexation Part two - file too big to send in one email April Cabello Planning Technician City of Caldwell (208)455-4667 phone (208)455-3050 fax acabello@citvofcaldwell.org From: April Cabello Sent: Thursday, October 15, 2015 4:49 PM To: Robb MacDonald; Andy Cater; Brett Clark; Dave Wright; Chris Bryant; 'Jim Morrison (Development Services)'; 'rparsons@phd3.state.id.us'; 'david.loper@phd3Jdaho.gov; 'dwalz@idahopower.com'; 'MISHELLE. SIN GLETON@intgas.com';'greg.j.martinez@usace.army.mil'; 'rick.ward@idfg.idaho.gov'; 'keri.sigman@idwr.idaho.gov'; 'pcharlton@vallivue.org'; 'Amber Jaquier-Page'; 'mark@pioneerirrigation.com; 'Carl Miller'; 'rjalbert@valleyregionaltransit.org' Subject: Public Agency Memo ANN-15-05 Jacksons Annexation Hello, Please see the attached public agency memo. Please direct all responses or questions directly to Jarom Wagoner via email: iwagoner@citvofcaldwell.org Thank you, April Cabello Planning Technician City of Caldwell (208)455-4667 phone (208)455-3050 fax acabelloC'cityofcaldwell.org