Loading...
HomeMy WebLinkAboutPublic AgencyI a PUBLIC AGENCY ITEM DATE SUBMITTED BY W leil*V.q,tq ?bX t'e!'r ?7-t1 WrtrtW Pn->W"a/'t- r)-14 P|r. rt VA/J"/5-to't"L I I t Lori Golligan From: Sent: To: Cc: Subject: Attachments: Mark Zirschky <mark@pioneerirrigation.com > Thursday, April 04, 2019 4:38 PM LoriColligan; P&Z Rodriguez, Maria RE: SUB-19P-02 Marblefront Sub - Public Agency Memo SUB-19P-02 Marblefront Sub - Public Agency Memo.pdf Greetings, Pioneer lrrigation District's 300 Lateral exists at the SE corner of the proposed development. Pionee/s easement surrounding the irrigation box and pipeline at KCID Road must be noted on all plats. The 300 Lateral pipeline has a 20 foot easement, centered along the pipeline. The irrigation box has a 10 foot radius surrounding the box. The Solomon Drain runs along the western boundary of the project. The Solomon Drain is a Bureau of Reclamation facility, with a 110 foot right of way, 55 feet from the centerline of the drain, along both sides. This right of way must also be noted on all plats. Per ldaho Statutes, 42-L2O9, written permission must be obtained by Pioneer lrrigation District, prior to any encroachment or modification of any Pioneer facility. Regards, Mark Zirschky Superintendent Pioneer lrrigation District 208-459-36L7 208-250-8481 From: Lori Coll iga n <lcol liga n @cityofca ldwel l.org> Sent: Thursday, April 04,20t91:40 PM To: Robb MacDonald <rmacdonald@cityofcaldwell.org>; Andy Cater <acater@cityofcaldwell.org>; Chris Bryant <cbryant@cityofcaldwell.org>; Dave Wright <dwright@cityofcaldwell.org>; pcharlton@vallivue.org; Mark Zirschky <mark@pioneerirrigation.com>; Amber O'Nealcamber@pioneerirrigation.com>; trichard@canyonhd4.org; chopper@ca nyon hd4.org Subject: SUB-19P-02 Marblefront Sub - Public Agency Memo Hello, Please see the attached public agency memo. Please direct all responses or questions to P&Z@citvofcaldwell.org Thank you, 1 pe,( DISTRICT 7A o o CANYON HIGHWAY DISTRICT No. 4 15435 HIGHWAY 44 CALDWELL, IDAHO 83607 TELEPHONE 208/454-8 I 35 FAX 208/454-2008 May 2,2019 City of Caldrvell Planning & Zoning 411 Blaine Street Caldwell,ID 83605 Attention: .Ierom Wagoner, Senior Planner Bailey Engineering, Inc. 424?Brookside Lane Boise, Idaho 83714 Attention: Katie Miller, Project Manager Re:Marblefront Subdivision SUB.19P.O2 Dear Commissioners Canyon Highway District No. 4 (CHD4) has reviewed the preliminary plat and revised Traffic Impact Study dated May 4th 2019 for Marblefront Subdivision, approximately 187 single-family residential lots located at the southlvest corner of Marblefi'ont Road and S KCID Road. CHD4 offers the following comrnents for your consideration: Jurisdiction CHD4 and the City entered into an Exchange Maintenance Agreement for the logical distribution of maintenance activities on roadway segments where both parties have jurisdiction. Under this agreement, CHD4 maintains the tbllowing roads that may potentially be affected by the proposed development: o Lincoln Rd between Caldwell City limits and Middleton Rd o Marblefront Rd between KCID Rd and Middleton Rd r Mason Rd between Marblefront and Lincoln Roads o Wells Rd between Marblel?ont and Lincoln Roads The remaining roadways in the vicinity of the development. inch.rding Marblefront west of KCID Rd, and KCID Rd are under the jurisdiction and maintenance of the City. Traffic Impacts l. The revised Traffic Impact Study (TIS) assumes the trip distribution from the development will be 25o/o west on Marblefront Rd, 5%o east on Marblefront Rd, 650/o *vill go south on KCID Rd, and lYo to the north. 2. This distribution assumes that Smeed Parklvay and Aviation Way have been developed and constructed betweenUs 20126 and Marblefront Rd. An interim trip distribution and subsequent impacts on adjoining intersections should be included that considers trip distribution prior to development of these north south corridors west of the proposed subdivision. Cunently, Marblefront Rd west of the development does not provide ready access to the primary highway system (interstate and principal arterial roadways) that will constitute many of the trips from the proposed development, PW7 o o 3. In practice, significantly more trips are likely to proceed east on Marblefront Rd to the Middleton Rd corridor, to avoid the long delays that exist today at the KCIDIUS2A-26 intersection. 4. Marblefront Rd east of Wells (1i4 mile east of the site) is a naffow, gravel roadway constructed r,vithin a limited right-of-r,vay. 'fhis road segment (Marblefront from Wells to Middleton Rd) is not suitable lor through traffic from the development in the present condition (limited tw.o-way travel), and is not planned for future expansion due to the Marblefront/Middleton Rd intersection location. The development shall identify and implement traffic controls or alternative routes that prohibit the use of Marblefront Rd east of Wells Rd for through traffic. 5. The TIS shorvs the KCID/US 20-26 intersection as operating at LOS F for both am and pm peak hours. The development proposes to add significant additional tralfic to this intersection. To avoid potential additional crashes or intersection delays, consideration should be made for delaying approval of the clevelopment until the current unacceptable intersection conditions have been rnitigated. Traffrc Mitigation Imp rovements CHD4 recommends the City utilize exactions and/or available impact fees to mitigate traftlc impacts from the development. Although specific mitigation is not identified in the2025 buildout year, the subdivision trips are shown to negatively affect the intersections of KCID/Marble Front and KCIDIUS 20/26. Given the proposed widening of KCID and Marblefront, CI-ID4 recommends striping a center tum lane to rnaintain traftic flows. Please feel free to contact me at any time prior to the hearing if you have any questions. Sincerely, Chris Hopper, P.E. Assistant District Engineer Canyon Highway District No. 4 CC: Robb MacDonald, Caldwell City Engineer File: Caldwell- Marblefront Rd Marblefront Subdivision 2 pwv o o To: From: Re: Date: Jarom Wagoner, Senior Planner TJ Frans, Project Manager SUB-1 9P-02 Marblefront Subdivision May 14,2019 The Engineering Department provides the following comments on a request by Endurance Holdings, LLC and Katie Miller for Preliminary Plat approval of Marblefront Subdivision consisting of 62.6 acres, more or less, to be subdivided into 187 residential lots and 17 common lots. The subject property is located at the southwest corner of KCID Road and Marble Front Road in Caldwell, ldaho. Development Plans '1. Development Plans - Prior to commencing construction, plans must be prepared by the developer's engineer and approved by the City Engineering Department which shall include the following items: a. Street section and alignment (including curb and gutter); b. Sidewalk (sidewalk width based on street classification); c. Sanitary sewer (per City and DEQ requirements); d. Potable water (per City and DEQ requirements); e. Stormwater facilities (per City requirements/storm water manual); f. Street lighting (per City standards); g. Street signage (per City and MUTCD requirements); h. VerticalDatum based on NAVD 88 Datum. suB-19P-02 Marble Front Subdivision QA3 Page 118 Memorandum o o General 1. Easements for Public Utilities shall be 10 feet wide minimum along allfront & rear lot lines. A minimuml0 feet wide easement may be required along select interior lot lines to facilitate pressure irrigation or other utilities. 2. Appropriate easements for emergency access, transmission lines and/or other utilities shall be clearly indicated, with recorded instrument numbers provided for said easements, on the face of the final plat (visually and in writing). 3. All utilities on and within the boundaries of the subdivision shall be located and/or relocated underground. 4. All street, sewer, water, pressure irrigation, fire protection, and street light facilities must be dedicated to the City. Some conveyance facilities for stormwater drainage may be eligible for dedication to the City. 5. Construction of facilities to be dedicated and/or within public right-of-way shall be performed by an appropriately licensed public works contractor and shall be inspected by and constructed to City of Caldwell specifications. 6. Prior to commencement of construction in any dedicated right-of-way, or construction of any improvement intended for dedication to the City or connected to a City facility, the City Engineering staff is to be notified. This preferably will take place in a pre-construction conference scheduled by the engineer of record in which all appropriate personnel and utilities are present. Appropriate City personnel are to be notified in advance of all testing (including compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of the testing. The engineer of record or his designated representative is to witness all tests (not covered by City inspectors) and a log of inspection visits and testing results is to be kept by the engineer of record or his representative. 7. The developer is to employ a responsible design professional, preferably the engineer of record, to oversee and inspect construction, to perform and/or observe all requisite testing of completed facilities, and to certify that improvements have been constructed according to approved plans and in compliance with applicable City, State, and Federal standards. 8. The engineer of record shall be held responsible to ensure that subdivision improvements are in substantial compliance with said engineer's design. Following the construction of the subdivision improvements, the developers engineer shall provide the City of Caldwell Engineering Department with electronic (.dwg) format record drawings spatially referenced to the ldaho State Plane Coordinate System-West Zone, North America Datum (NAD) 83. Vertical control shall be referenced to the North America Datum (NAVD) 88 for future reference and to establish that the engineer of record has caused construction to occur in substantial compliance with the design of said engineer of record. 9. Any note, item or drawing element on the plats, construction drawings, engineering drawings and/or design drawings related to the property inconsistent with City Codes, Policies and/or Ordinances shall not be construed as approved unless specifically addressed and granted by City Council. SUB-I9P-02 Marble Front Subdivision Page 218 w3 oo 10. Comments from other jurisdictions/entities/agency having approval authority shall be met. Riqhts-of-Wav 1. Marble Front Road is classified as a Collector. The applicant shall dedicate as public right-of- way a minimum thirty-five (35) foot half width right-of-way (from centerline) along the entire Marble Front Road alignment (per City Standard R-810 C). 2. KCID Road is classified as a Collector. The applicant shall dedicate as public right-of-way a minimum thirty-five (35) foot half width righlof-way (from centerline) along the entire KCID Road alignment (per City Standard R-810 C). 3. All interior local streets classified as residential shall be dedicated to the City. The applicant shall dedicate as public right-of-way a minimum fiftythree (53)foot fullwidth right-of-way (per City Standard R-810 E). 4. Right-of-way at intersections of classified streets shall meet the requirements of the City of Caldwell standard drawings R-81 0 F-H. 5. All cul-de-sacs, knuckles, bulb-outs, radiuses, etc. shall maintain a 3' wide strip of right-of-way behind the back of the sidewalk. 6. A note shall be placed on the Final Plat indicating that all rights-of-way are to be dedicated to the public. Street 1. Full frontage half street improvements shall be completed to all classified roads adjacent to the proposed preliminary plat (including Marble Front Road & KCID Road) in accordance with all City of Caldwell standards and specifications. lmprovements shall include (but are not limited to) curb, gutter, sidewalk, asphalt, streetlights, joint trench, communication conduit, storm drainage facilities, etc. Paved asphalt sections (not including curb and gutter plat) for Marble Front & KCID shall be a minimum ol24'wide to accommodate 2 lanes of traffic. 2. The Applicant shall, in good faith, coordinate with the property owner of the out parcel near the southeast corner of the project (Parcel R3523701100) to obtain right-of-way across the frontage of said parcel and complete full frontage improvements across said parcel. The proposed Marble Front Subdivision shall bare the cost of frontage said improvements. 3. The Applicant shall construct Marble Front Road improvements across the frontages of the two out parcels located at the northwest corner of the project (Parcels R3523701000 [current address: 4500 Marble Front Rd.l & R35237010A0 [current address: 4520 Marble Front Rd.]); including the curb radius, ped-ramps and sidewalk at the southeast comer of Marble Front Road and Smeed Parkway. The proposed Marble Front Subdivision shall bare the cost of frontage said improvements. 4. Access to Marble Front Road shall be approved by CHD4 in additional to the City of Caldwell. Page 318 SUB-19P-02 Marble Front Subdivision pA7 o 5. Applicant shall construct a right-hand turn lane on Marble Front Road, at the intersection of KCID, per City of Caldwell standard drawing RB10-H 6. No lot shall be permitted to have direct access to/from Marble Front Road and KCID Road. A note shall be place of the face of the final plat indicating this. 7. Applicant shall stripe in a center turn lane along the KCID and Marble Front Road frontages. Traffic Mitiqation The following are the required traffic related mitigation measures for the Marble Front Subdivision resulting from the traffic impact study pursuant to City Code Chapter 10, Article 10. A traffic impact study will be required for this development because of the volume of traffic produced. 1. Community Planning Association of Southwest ldaho has computed the average trip length in Canyon County to be 7.3 mi. Traffic impact mitigation should presumably occur at both trip ends solz of the trip length should be attributed to each end. lt is estimated that trips will encounter a major intersection every half mile along any given path. The capacity of an average fully improved intersection (assumed to be the intersection of a collector and an arterial road) is estimated to be 5,080 vehicles/hour. The estimated traffic resulting from the proposed density in this subdivision based on the Trip Generation 7m Edition Manual estimates the pm peak hour traffic flow at 185 vehicles for 187 single family detached housing at full buildout. Once a Traffic lmpact Study is received, the peak hour trips may be adjusted accordingly. Following the City of Caldwell's mitigation equation ((185 veh/hr*7.3 mile/trip*0.5 trip ends*2inter/mi) / (5080veh/hr)) the total contribution of this development to traffic mitigation shall be 26.6Yo of a fully improved intersection. This percentage represents the total capacity utilized from each intersection (once fully improved and possibly signalized) encountered by trips generated over the development's half of the generated trip length. a) The owner/developer/applicant shall design and construct roughly 26.6% of the signalization improvements needed for an average intersection, as defined, at one or more nearby (within 3.5 miles of the site) deficient locations to be determined by Engineering staff. The Engineering staff shall have reasonable discretion to determine the sites of construction and what design and construction equals roughly 26.6% of the signalization improvements needed for an average intersection. Engineering staff can provide information about applications with whose mitigation efforts the owner/developer/applicant can combine to achieve even units of 100%. i) The owner/developer/applicant may be allowed, at his option, to contribute monies in lieu of construction to the City of Caldwell Roadway Trust Fund, but the basis for the obligation is for construction. Monetary contributions must be made at a level commensurate with costs to construct the same by the City and as estimated by the Ptrge 418 SUB-19P.02 Marble Front Subdivision o ?p) o City. This alternate provision for payment of money is not a requirement, is for the benefit and convenience of the owner/developer/applicant only and does not constitute an lmpact Fee. ii) lmprovements needed at and near the intersection of lvlarble Front Road and KCID Road may be considered in lieu of some part or all traffic mitigation requirements. Measures that may qualify for this purpose include: (1) Added right-of-way and widening to accommodate the turn lanes above and beyond the City rightof-way requirement (a) Right-of-way provided for this purpose should be credited toward signal mitigation at raw land value. (b) Added Asphalt above the minimum required shall be credited based on actual cost or contract bid. iii) The average cost of an intersection is estimated at $425,000 for procurement of design services, construction, and associated costs by the City, of which 26.60/o of that cost is what needs to be covered by this subdivision. 3. The owner/developeriapplicant shall keep the City informed of and comply with any additional requirements CHD4 has. CHD4 has the final authority to impose requirements on Marble Front Road. Requirements of CHD4 shall be met independent of requirements of the City. CHD4 standards shall be followed for roadway section depth on Marble Front Road. The stricter of City or CHD4 requirements shall be followed for roadway width and traffic mitigation measures on Marble Front Road. 4. Per comments from CHD4 (via a letter submitted to the City of Caldwell dated May 2,2019) a revised (or interim) TIS shall be conducted and submitted for review. There is potentialfor the approval of the Marble Front Subdivision Phase 1 construction drawings to be delayed untilthe surrounding road system and impacted intersections have an acceptable levelof service. Water 1. All on site water mains will need to be looped into existing mains for fire flow and water quality purposes. lntemal main sizing and construction plan approval, will be dependent upon the availability of fire flow. 2. Each phase shall have a dualsourced/redundant water supply. 3. Each buildable lot shall be supplied with potable water. lf buildings are constructed to include individual units that could feasibly or will be sold separately, each unit shall be serviced separately. 4. The location of water service, including sizing of mains, providing of easements, frontage construction, and offsite construction are to be decided during review of improvement plans. This development will be required to comply with the Water Master Study. lt is expected that all classified streets will have main lines constructed in them by the developer. The waterline size will be determined in each street by road classification. SUB-19P-02 Marble Front Subdivision o Page 518 P+l oo 5. There is an existing 12-inch water main currently located in Marble Front Road and KCID Road. Sanitarv Sewer 1. lt shall be the responsibility of the applicant's engineer to verify that connection to existing sewer mainlines will not exceed the functional capacity of said mainlines. Provision for connectivity by future developments shall be met in accordance with cunent City standards. 2. Sewer service is not currently available to the proposed site. The Developer has the option to extend gravity sewer to the site OR construct a sewer lift station to City Standards to serve the proposed development. 3. The location of sewer service, including sizing of mains, providing of easements, frontage construction, and offsite construction are to be decided during review of improvement plans. This development will be required to install the trunk lines specified within the most current version of the Franklin Sewer Study that reside within the limits of this preliminary plat. 4. The Developer will be required (where applicable) to extend all sewer and water mainlines to the center of adjacent roadways for connectivity by future developments. Locations of said extensions will be decided during the review of the improvement plans. 5. Each buildable lot shall be provided with individual sewer service. lf buildings are constructed to include individual units that could feasibly or will be sold separately, each unit shall be serviced separately. 6. Any easements for sewer lines not in the right-of-way should be at a width sufficient to construct same and not less than 20 feet in width. Easements for adjacent sewer and water lines not in the right-of-way shall be at a width sufflcient to construct the same and shall be no less than 30 feet in width. 7. All weather surfaces may be required adjacent to mainlines that fall outside the public right-of- way. All weather surfaces shall be constructed sufficiently to support heavy equipment necessary to construct and maintain sewer under all seasonal weather conditions. lrriqation 1. Existing easements and/or right-of-ways for any irrigation facility shall be determined and clearly indicated on the construction plans and on the final plat (excluding prescriptive easements). Construction across or re-routing of these facilities is subject to approval by Pioneer lnigation District and at their discretion, their assigns. 2. The Developer shall maintain any existing upstream drainage rights and downstream irrigation rights across the propefi. During the design phase of this project, the developer or his engineer is to contact the appropriate irrigation district to help ascertain these rights. Appropriate facilities shall be provided by the developer to convey irrigation and drainage water SUB-I9P-02 Marble Front Subdivision Page 618 ?k3 o across the property to take care of these offsite needs. There is to be no discharge of gravity irrigation return water into the subdivision storm water system. 2. The development is to include a non-potable water pressure irrigation system. The design of this pressure inigation system is to be reviewed and approved by the Caldwell Municipal lrrigation District prior to construction plan approval. lt shall be required that the system will be operated and maintained by the Caldwell Municipal lnigation District. 3. Pump stations shall be located in a platted common lot with a recorded perpetual easement sufficient for convenient access and maintenance of said pump station. The lot shall be owned and maintained by the home owners association. 4. Each lot shall be provided with a pressure inigation service. 5. All pressure inigation mainlines shall be located in the public right-of-way. Any portion of the system located outside a public right-of-way shall be within a public utility easement of a minimum of 10 feet in width centered over said mainlines as per current City standards. 6. The applicant shall ensure that an adequate continuous irrigation supply flow is available to meet the pressure irrigation system requirements. 7. Supplying irrigation district shall approve the location of the delivery point. Applicant shall provide a copy of said approval, in writing, to the City prior to plan approval. 8. The applicant shall transfer a proportionate share of any existing water right(s), except those held in trust by an irrigation district, to the City of Caldwell for both irrigation and domestic water supply for the subject development. lf this should occur, The City shall assist in registering the transfer. Storm Drain 1. As noted previously, provision is to be made for the disposal of stormwater drainage in accordance with the City Stormwater Management Manualand any updates adopted subsequent to this application. lt is to be noted that retention designs will be denied in most instances. A copy of this policy is available upon request. The engineer of record is to provide calculations, which indicate that the assumptions in his stormwater drainage plan comply with the requirements of the stormwater manual. ln this case, if a storm water system is existing, the burden of proof is on the developer to verify the capacity is sufficient for the proposed development. 2. The applicant shall identify and retain all historicaldrainage discharge points from the property for the purpose of draining on site storm water detention facilities. 3. The final plat drawing should indicate that storm water detention basins are to be placed in common lots in accordance with the referenced Stormwater policy. A note should be placed on the final plat indicating that all areas designated as common areas are to be operated and maintained by the business owners association. SUB-19P-02 Marble Front Subdivision o Page 718 TP5 O o Other Utilities 1. The Developer is responsible to relocate all frontage utilities in accordance with City standards and specifications in conjunction with this development. 2. ln keeping with City Code, the Developer shall locate all new utilities underground. Plat 1. Prior to approval of the final plat, subdivision facilities must be completed or an appropriate construction security provided. There may be temporary restrictions to the obtaining of building permits, even with acceptable construction security, depending on fire protection, emergency service requirements, and City approval of the sanitary sewer system. A 50% temporary restriction to obtaining of building permits will be enforced until all facility construction has been completed, inspected and certified by the Applicants engineer including all punch list items. 2. Upon recordation of the plat, the Engineering Department is to be provided with 3 full papers sets and PDF copy of the recorded final plats. Building permits will not be issued until this requirement is met. 3. An electronic (dwg.) copy of the Final Plat suitable for mapping and addressing purposes is required when the Final Plat is submitted to the Engineering Department for review. SUB-I9P-02 Marble Front Subdivision Page 818 QPt o o Lori Colligan From: Sent: To: Gc: Subject: Attachments: Mark Zirschky <mark@pioneerirrigation.com > Friday, May 10, 2019 7:54 AM P&Z Kirk Meyers; Rodriguez, Maria SUB-19P-02 Marblefront Sub Preliminary Plat SUB-19P-02 Marblefront Sub_CC - Public Agency Memo.pdf Greetings, My comment regarding this application, is similar to my last response Pioneer lrrigation District has yet to be involved in any discussions regarding where the gravity irrigation will be provided for the pressure irrigation system. Adequate and timely discussions with PID shall occur, prior to development of this property, to insure adequate irrigation supply. It is unclear from the attached documents that the Solomon Drain right of way is called out. The Solomon Drain is a Bureau of Reclamation facility, which has a 110 foot federal right of way. The 110 foot right of way must be labeled on all plats. Any encroachments or modifications to the Solomon Drain must be approved in writing by the Bureau of Reclamation. Regards, Mark Zirschky Superintendent Pioneer lrrigation District 208-459-3677 208-250-8481 Total Control Panel To: p&z@cityofcaldwell. ore From: mark@pioneerirrigation.com Message Score: 20 My Spam Blocking Level: High Login High (60): I'ass Medium (75): Pass Low (90): Pass Block this sender Block pioneerirrigation. com This message was delivered because the contentfilter score did not exceed yourfilter level. .DD\1