HomeMy WebLinkAboutPublic AgencyI a
PUBLIC AGENCY
ITEM DATE SUBMITTED BY
W leil*V.q,tq
?bX t'e!'r ?7-t1 WrtrtW
Pn->W"a/'t- r)-14
P|r. rt VA/J"/5-to't"L
I
I t
Lori Golligan
From:
Sent:
To:
Cc:
Subject:
Attachments:
Mark Zirschky <mark@pioneerirrigation.com >
Thursday, April 04, 2019 4:38 PM
LoriColligan; P&Z
Rodriguez, Maria
RE: SUB-19P-02 Marblefront Sub - Public Agency Memo
SUB-19P-02 Marblefront Sub - Public Agency Memo.pdf
Greetings,
Pioneer lrrigation District's 300 Lateral exists at the SE corner of the proposed development. Pionee/s easement
surrounding the irrigation box and pipeline at KCID Road must be noted on all plats. The 300 Lateral pipeline has a 20
foot easement, centered along the pipeline. The irrigation box has a 10 foot radius surrounding the box.
The Solomon Drain runs along the western boundary of the project. The Solomon Drain is a Bureau of Reclamation
facility, with a 110 foot right of way, 55 feet from the centerline of the drain, along both sides. This right of way must
also be noted on all plats.
Per ldaho Statutes, 42-L2O9, written permission must be obtained by Pioneer lrrigation District, prior to any
encroachment or modification of any Pioneer facility.
Regards,
Mark Zirschky
Superintendent
Pioneer lrrigation District
208-459-36L7
208-250-8481
From: Lori Coll iga n <lcol liga n @cityofca ldwel l.org>
Sent: Thursday, April 04,20t91:40 PM
To: Robb MacDonald <rmacdonald@cityofcaldwell.org>; Andy Cater <acater@cityofcaldwell.org>; Chris Bryant
<cbryant@cityofcaldwell.org>; Dave Wright <dwright@cityofcaldwell.org>; pcharlton@vallivue.org; Mark Zirschky
<mark@pioneerirrigation.com>; Amber O'Nealcamber@pioneerirrigation.com>; trichard@canyonhd4.org;
chopper@ca nyon hd4.org
Subject: SUB-19P-02 Marblefront Sub - Public Agency Memo
Hello,
Please see the attached public agency memo.
Please direct all responses or questions to P&Z@citvofcaldwell.org
Thank you,
1 pe,(
DISTRICT
7A
o o
CANYON HIGHWAY DISTRICT No. 4
15435 HIGHWAY 44
CALDWELL, IDAHO 83607
TELEPHONE 208/454-8 I 35
FAX 208/454-2008
May 2,2019
City of Caldrvell Planning & Zoning
411 Blaine Street
Caldwell,ID 83605
Attention: .Ierom Wagoner, Senior Planner
Bailey Engineering, Inc.
424?Brookside Lane
Boise, Idaho 83714
Attention: Katie Miller, Project Manager
Re:Marblefront Subdivision
SUB.19P.O2
Dear Commissioners
Canyon Highway District No. 4 (CHD4) has reviewed the preliminary plat and revised Traffic
Impact Study dated May 4th 2019 for Marblefront Subdivision, approximately 187 single-family
residential lots located at the southlvest corner of Marblefi'ont Road and S KCID Road. CHD4
offers the following comrnents for your consideration:
Jurisdiction
CHD4 and the City entered into an Exchange Maintenance Agreement for the logical distribution
of maintenance activities on roadway segments where both parties have jurisdiction. Under this
agreement, CHD4 maintains the tbllowing roads that may potentially be affected by the proposed
development:
o Lincoln Rd between Caldwell City limits and Middleton Rd
o Marblefront Rd between KCID Rd and Middleton Rd
r Mason Rd between Marblefront and Lincoln Roads
o Wells Rd between Marblel?ont and Lincoln Roads
The remaining roadways in the vicinity of the development. inch.rding Marblefront west of KCID
Rd, and KCID Rd are under the jurisdiction and maintenance of the City.
Traffic Impacts
l. The revised Traffic Impact Study (TIS) assumes the trip distribution from the
development will be 25o/o west on Marblefront Rd, 5%o east on Marblefront Rd, 650/o *vill
go south on KCID Rd, and lYo to the north.
2. This distribution assumes that Smeed Parklvay and Aviation Way have been developed
and constructed betweenUs 20126 and Marblefront Rd. An interim trip distribution and
subsequent impacts on adjoining intersections should be included that considers trip
distribution prior to development of these north south corridors west of the proposed
subdivision. Cunently, Marblefront Rd west of the development does not provide ready
access to the primary highway system (interstate and principal arterial roadways) that will
constitute many of the trips from the proposed development,
PW7
o o
3. In practice, significantly more trips are likely to proceed east on Marblefront Rd to the
Middleton Rd corridor, to avoid the long delays that exist today at the KCIDIUS2A-26
intersection.
4. Marblefront Rd east of Wells (1i4 mile east of the site) is a naffow, gravel roadway
constructed r,vithin a limited right-of-r,vay. 'fhis road segment (Marblefront from Wells to
Middleton Rd) is not suitable lor through traffic from the development in the present
condition (limited tw.o-way travel), and is not planned for future expansion due to the
Marblefront/Middleton Rd intersection location. The development shall identify and
implement traffic controls or alternative routes that prohibit the use of Marblefront Rd
east of Wells Rd for through traffic.
5. The TIS shorvs the KCID/US 20-26 intersection as operating at LOS F for both am and
pm peak hours. The development proposes to add significant additional tralfic to this
intersection. To avoid potential additional crashes or intersection delays, consideration
should be made for delaying approval of the clevelopment until the current unacceptable
intersection conditions have been rnitigated.
Traffrc Mitigation Imp rovements
CHD4 recommends the City utilize exactions and/or available impact fees to mitigate traftlc
impacts from the development. Although specific mitigation is not identified in the2025
buildout year, the subdivision trips are shown to negatively affect the intersections of
KCID/Marble Front and KCIDIUS 20/26. Given the proposed widening of KCID and
Marblefront, CI-ID4 recommends striping a center tum lane to rnaintain traftic flows.
Please feel free to contact me at any time prior to the hearing if you have any questions.
Sincerely,
Chris Hopper, P.E.
Assistant District Engineer
Canyon Highway District No. 4
CC: Robb MacDonald, Caldwell City Engineer
File: Caldwell- Marblefront Rd Marblefront Subdivision
2
pwv
o o
To:
From:
Re:
Date:
Jarom Wagoner, Senior Planner
TJ Frans, Project Manager
SUB-1 9P-02 Marblefront Subdivision
May 14,2019
The Engineering Department provides the following comments on a request by Endurance
Holdings, LLC and Katie Miller for Preliminary Plat approval of Marblefront Subdivision consisting
of 62.6 acres, more or less, to be subdivided into 187 residential lots and 17 common lots. The
subject property is located at the southwest corner of KCID Road and Marble Front Road in
Caldwell, ldaho.
Development Plans
'1. Development Plans - Prior to commencing construction, plans must be prepared by the
developer's engineer and approved by the City Engineering Department which shall include the
following items:
a. Street section and alignment (including curb and gutter);
b. Sidewalk (sidewalk width based on street classification);
c. Sanitary sewer (per City and DEQ requirements);
d. Potable water (per City and DEQ requirements);
e. Stormwater facilities (per City requirements/storm water manual);
f. Street lighting (per City standards);
g. Street signage (per City and MUTCD requirements);
h. VerticalDatum based on NAVD 88 Datum.
suB-19P-02
Marble Front Subdivision
QA3
Page 118
Memorandum
o o
General
1. Easements for Public Utilities shall be 10 feet wide minimum along allfront & rear lot lines. A
minimuml0 feet wide easement may be required along select interior lot lines to facilitate
pressure irrigation or other utilities.
2. Appropriate easements for emergency access, transmission lines and/or other utilities shall be
clearly indicated, with recorded instrument numbers provided for said easements, on the face
of the final plat (visually and in writing).
3. All utilities on and within the boundaries of the subdivision shall be located and/or relocated
underground.
4. All street, sewer, water, pressure irrigation, fire protection, and street light facilities must be
dedicated to the City. Some conveyance facilities for stormwater drainage may be eligible for
dedication to the City.
5. Construction of facilities to be dedicated and/or within public right-of-way shall be performed by
an appropriately licensed public works contractor and shall be inspected by and constructed to
City of Caldwell specifications.
6. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre-construction
conference scheduled by the engineer of record in which all appropriate personnel and utilities
are present. Appropriate City personnel are to be notified in advance of all testing (including
compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of
the testing. The engineer of record or his designated representative is to witness all tests (not
covered by City inspectors) and a log of inspection visits and testing results is to be kept by the
engineer of record or his representative.
7. The developer is to employ a responsible design professional, preferably the engineer of
record, to oversee and inspect construction, to perform and/or observe all requisite testing of
completed facilities, and to certify that improvements have been constructed according to
approved plans and in compliance with applicable City, State, and Federal standards.
8. The engineer of record shall be held responsible to ensure that subdivision improvements are
in substantial compliance with said engineer's design. Following the construction of the
subdivision improvements, the developers engineer shall provide the City of Caldwell
Engineering Department with electronic (.dwg) format record drawings spatially referenced to
the ldaho State Plane Coordinate System-West Zone, North America Datum (NAD) 83. Vertical
control shall be referenced to the North America Datum (NAVD) 88 for future reference and to
establish that the engineer of record has caused construction to occur in substantial
compliance with the design of said engineer of record.
9. Any note, item or drawing element on the plats, construction drawings, engineering drawings
and/or design drawings related to the property inconsistent with City Codes, Policies and/or
Ordinances shall not be construed as approved unless specifically addressed and granted by
City Council.
SUB-I9P-02
Marble Front Subdivision
Page 218
w3
oo
10. Comments from other jurisdictions/entities/agency having approval authority shall be met.
Riqhts-of-Wav
1. Marble Front Road is classified as a Collector. The applicant shall dedicate as public right-of-
way a minimum thirty-five (35) foot half width right-of-way (from centerline) along the entire
Marble Front Road alignment (per City Standard R-810 C).
2. KCID Road is classified as a Collector. The applicant shall dedicate as public right-of-way a
minimum thirty-five (35) foot half width righlof-way (from centerline) along the entire KCID
Road alignment (per City Standard R-810 C).
3. All interior local streets classified as residential shall be dedicated to the City. The applicant
shall dedicate as public right-of-way a minimum fiftythree (53)foot fullwidth right-of-way (per
City Standard R-810 E).
4. Right-of-way at intersections of classified streets shall meet the requirements of the City of
Caldwell standard drawings R-81 0 F-H.
5. All cul-de-sacs, knuckles, bulb-outs, radiuses, etc. shall maintain a 3' wide strip of right-of-way
behind the back of the sidewalk.
6. A note shall be placed on the Final Plat indicating that all rights-of-way are to be dedicated to
the public.
Street
1. Full frontage half street improvements shall be completed to all classified roads adjacent to the
proposed preliminary plat (including Marble Front Road & KCID Road) in accordance with all
City of Caldwell standards and specifications. lmprovements shall include (but are not limited
to) curb, gutter, sidewalk, asphalt, streetlights, joint trench, communication conduit, storm
drainage facilities, etc. Paved asphalt sections (not including curb and gutter plat) for Marble
Front & KCID shall be a minimum ol24'wide to accommodate 2 lanes of traffic.
2. The Applicant shall, in good faith, coordinate with the property owner of the out parcel near the
southeast corner of the project (Parcel R3523701100) to obtain right-of-way across the
frontage of said parcel and complete full frontage improvements across said parcel. The
proposed Marble Front Subdivision shall bare the cost of frontage said improvements.
3. The Applicant shall construct Marble Front Road improvements across the frontages of the two
out parcels located at the northwest corner of the project (Parcels R3523701000 [current
address: 4500 Marble Front Rd.l & R35237010A0 [current address: 4520 Marble Front Rd.]);
including the curb radius, ped-ramps and sidewalk at the southeast comer of Marble Front
Road and Smeed Parkway. The proposed Marble Front Subdivision shall bare the cost of
frontage said improvements.
4. Access to Marble Front Road shall be approved by CHD4 in additional to the City of Caldwell.
Page 318
SUB-19P-02
Marble Front Subdivision
pA7
o
5. Applicant shall construct a right-hand turn lane on Marble Front Road, at the intersection of
KCID, per City of Caldwell standard drawing RB10-H
6. No lot shall be permitted to have direct access to/from Marble Front Road and KCID Road. A
note shall be place of the face of the final plat indicating this.
7. Applicant shall stripe in a center turn lane along the KCID and Marble Front Road frontages.
Traffic Mitiqation
The following are the required traffic related mitigation measures for the Marble
Front Subdivision resulting from the traffic impact study pursuant to City Code Chapter 10,
Article 10. A traffic impact study will be required for this development because of the volume
of traffic produced.
1. Community Planning Association of Southwest ldaho has computed the average trip length
in Canyon County to be 7.3 mi. Traffic impact mitigation should presumably occur at both
trip ends solz of the trip length should be attributed to each end. lt is estimated that trips will
encounter a major intersection every half mile along any given path. The capacity of an
average fully improved intersection (assumed to be the intersection of a collector and an
arterial road) is estimated to be 5,080 vehicles/hour.
The estimated traffic resulting from the proposed density in this subdivision based on the
Trip Generation 7m Edition Manual estimates the pm peak hour traffic flow at 185 vehicles
for 187 single family detached housing at full buildout. Once a Traffic lmpact Study is
received, the peak hour trips may be adjusted accordingly.
Following the City of Caldwell's mitigation equation ((185 veh/hr*7.3 mile/trip*0.5 trip
ends*2inter/mi) / (5080veh/hr)) the total contribution of this development to traffic mitigation
shall be 26.6Yo of a fully improved intersection. This percentage represents the total capacity
utilized from each intersection (once fully improved and possibly signalized) encountered by
trips generated over the development's half of the generated trip length.
a) The owner/developer/applicant shall design and construct roughly 26.6% of the
signalization improvements needed for an average intersection, as defined, at one or
more nearby (within 3.5 miles of the site) deficient locations to be determined by
Engineering staff. The Engineering staff shall have reasonable discretion to determine
the sites of construction and what design and construction equals roughly 26.6% of the
signalization improvements needed for an average intersection. Engineering staff can
provide information about applications with whose mitigation efforts the
owner/developer/applicant can combine to achieve even units of 100%.
i) The owner/developer/applicant may be allowed, at his option, to contribute monies in
lieu of construction to the City of Caldwell Roadway Trust Fund, but the basis for the
obligation is for construction. Monetary contributions must be made at a level
commensurate with costs to construct the same by the City and as estimated by the
Ptrge 418
SUB-19P.02
Marble Front Subdivision
o
?p)
o
City. This alternate provision for payment of money is not a requirement, is for the
benefit and convenience of the owner/developer/applicant only and does not
constitute an lmpact Fee.
ii) lmprovements needed at and near the intersection of lvlarble Front Road and KCID
Road may be considered in lieu of some part or all traffic mitigation requirements.
Measures that may qualify for this purpose include:
(1) Added right-of-way and widening to accommodate the turn lanes above and
beyond the City rightof-way requirement
(a) Right-of-way provided for this purpose should be credited toward signal
mitigation at raw land value.
(b) Added Asphalt above the minimum required shall be credited based on actual
cost or contract bid.
iii) The average cost of an intersection is estimated at $425,000 for procurement of
design services, construction, and associated costs by the City, of which 26.60/o of
that cost is what needs to be covered by this subdivision.
3. The owner/developeriapplicant shall keep the City informed of and comply with any
additional requirements CHD4 has. CHD4 has the final authority to impose requirements on
Marble Front Road. Requirements of CHD4 shall be met independent of requirements of the
City. CHD4 standards shall be followed for roadway section depth on Marble Front Road.
The stricter of City or CHD4 requirements shall be followed for roadway width and traffic
mitigation measures on Marble Front Road.
4. Per comments from CHD4 (via a letter submitted to the City of Caldwell dated May 2,2019)
a revised (or interim) TIS shall be conducted and submitted for review. There is potentialfor
the approval of the Marble Front Subdivision Phase 1 construction drawings to be delayed
untilthe surrounding road system and impacted intersections have an acceptable levelof
service.
Water
1. All on site water mains will need to be looped into existing mains for fire flow and water quality
purposes. lntemal main sizing and construction plan approval, will be dependent upon the
availability of fire flow.
2. Each phase shall have a dualsourced/redundant water supply.
3. Each buildable lot shall be supplied with potable water. lf buildings are constructed to include
individual units that could feasibly or will be sold separately, each unit shall be serviced
separately.
4. The location of water service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans.
This development will be required to comply with the Water Master Study. lt is expected that all
classified streets will have main lines constructed in them by the developer. The waterline size
will be determined in each street by road classification.
SUB-19P-02
Marble Front Subdivision
o
Page 518
P+l
oo
5. There is an existing 12-inch water main currently located in Marble Front Road and KCID
Road.
Sanitarv Sewer
1. lt shall be the responsibility of the applicant's engineer to verify that connection to existing
sewer mainlines will not exceed the functional capacity of said mainlines. Provision for
connectivity by future developments shall be met in accordance with cunent City standards.
2. Sewer service is not currently available to the proposed site. The Developer has the option to
extend gravity sewer to the site OR construct a sewer lift station to City Standards to serve the
proposed development.
3. The location of sewer service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans.
This development will be required to install the trunk lines specified within the most current
version of the Franklin Sewer Study that reside within the limits of this preliminary plat.
4. The Developer will be required (where applicable) to extend all sewer and water mainlines to
the center of adjacent roadways for connectivity by future developments. Locations of said
extensions will be decided during the review of the improvement plans.
5. Each buildable lot shall be provided with individual sewer service. lf buildings are constructed to
include individual units that could feasibly or will be sold separately, each unit shall be serviced
separately.
6. Any easements for sewer lines not in the right-of-way should be at a width sufficient to
construct same and not less than 20 feet in width. Easements for adjacent sewer and water
lines not in the right-of-way shall be at a width sufflcient to construct the same and shall be no
less than 30 feet in width.
7. All weather surfaces may be required adjacent to mainlines that fall outside the public right-of-
way. All weather surfaces shall be constructed sufficiently to support heavy equipment
necessary to construct and maintain sewer under all seasonal weather conditions.
lrriqation
1. Existing easements and/or right-of-ways for any irrigation facility shall be determined and
clearly indicated on the construction plans and on the final plat (excluding prescriptive
easements). Construction across or re-routing of these facilities is subject to approval by
Pioneer lnigation District and at their discretion, their assigns.
2. The Developer shall maintain any existing upstream drainage rights and downstream irrigation
rights across the propefi. During the design phase of this project, the developer or his
engineer is to contact the appropriate irrigation district to help ascertain these rights.
Appropriate facilities shall be provided by the developer to convey irrigation and drainage water
SUB-I9P-02
Marble Front Subdivision
Page 618
?k3
o
across the property to take care of these offsite needs. There is to be no discharge of gravity
irrigation return water into the subdivision storm water system.
2. The development is to include a non-potable water pressure irrigation system. The design of
this pressure inigation system is to be reviewed and approved by the Caldwell Municipal
lrrigation District prior to construction plan approval. lt shall be required that the system will be
operated and maintained by the Caldwell Municipal lnigation District.
3. Pump stations shall be located in a platted common lot with a recorded perpetual easement
sufficient for convenient access and maintenance of said pump station. The lot shall be owned
and maintained by the home owners association.
4. Each lot shall be provided with a pressure inigation service.
5. All pressure inigation mainlines shall be located in the public right-of-way. Any portion of the
system located outside a public right-of-way shall be within a public utility easement of a
minimum of 10 feet in width centered over said mainlines as per current City standards.
6. The applicant shall ensure that an adequate continuous irrigation supply flow is available to
meet the pressure irrigation system requirements.
7. Supplying irrigation district shall approve the location of the delivery point. Applicant shall
provide a copy of said approval, in writing, to the City prior to plan approval.
8. The applicant shall transfer a proportionate share of any existing water right(s), except those
held in trust by an irrigation district, to the City of Caldwell for both irrigation and domestic water
supply for the subject development. lf this should occur, The City shall assist in registering the
transfer.
Storm Drain
1. As noted previously, provision is to be made for the disposal of stormwater drainage in
accordance with the City Stormwater Management Manualand any updates adopted
subsequent to this application. lt is to be noted that retention designs will be denied in most
instances. A copy of this policy is available upon request. The engineer of record is to provide
calculations, which indicate that the assumptions in his stormwater drainage plan comply with
the requirements of the stormwater manual. ln this case, if a storm water system is existing, the
burden of proof is on the developer to verify the capacity is sufficient for the proposed
development.
2. The applicant shall identify and retain all historicaldrainage discharge points from the property
for the purpose of draining on site storm water detention facilities.
3. The final plat drawing should indicate that storm water detention basins are to be placed in
common lots in accordance with the referenced Stormwater policy. A note should be placed on
the final plat indicating that all areas designated as common areas are to be operated and
maintained by the business owners association.
SUB-19P-02
Marble Front Subdivision
o
Page 718
TP5
O o
Other Utilities
1. The Developer is responsible to relocate all frontage utilities in accordance with City
standards and specifications in conjunction with this development.
2. ln keeping with City Code, the Developer shall locate all new utilities underground.
Plat
1. Prior to approval of the final plat, subdivision facilities must be completed or an appropriate
construction security provided. There may be temporary restrictions to the obtaining of building
permits, even with acceptable construction security, depending on fire protection, emergency
service requirements, and City approval of the sanitary sewer system. A 50% temporary
restriction to obtaining of building permits will be enforced until all facility construction has been
completed, inspected and certified by the Applicants engineer including all punch list items.
2. Upon recordation of the plat, the Engineering Department is to be provided with 3 full papers
sets and PDF copy of the recorded final plats. Building permits will not be issued until this
requirement is met.
3. An electronic (dwg.) copy of the Final Plat suitable for mapping and addressing purposes is
required when the Final Plat is submitted to the Engineering Department for review.
SUB-I9P-02
Marble Front Subdivision
Page 818
QPt
o o
Lori Colligan
From:
Sent:
To:
Gc:
Subject:
Attachments:
Mark Zirschky <mark@pioneerirrigation.com >
Friday, May 10, 2019 7:54 AM
P&Z
Kirk Meyers; Rodriguez, Maria
SUB-19P-02 Marblefront Sub Preliminary Plat
SUB-19P-02 Marblefront Sub_CC - Public Agency Memo.pdf
Greetings,
My comment regarding this application, is similar to my last response
Pioneer lrrigation District has yet to be involved in any discussions regarding where the gravity irrigation will be provided
for the pressure irrigation system. Adequate and timely discussions with PID shall occur, prior to development of this
property, to insure adequate irrigation supply.
It is unclear from the attached documents that the Solomon Drain right of way is called out. The Solomon Drain is a
Bureau of Reclamation facility, which has a 110 foot federal right of way. The 110 foot right of way must be labeled on
all plats. Any encroachments or modifications to the Solomon Drain must be approved in writing by the Bureau of
Reclamation.
Regards,
Mark Zirschky
Superintendent
Pioneer lrrigation District
208-459-3677
208-250-8481
Total Control Panel
To: p&z@cityofcaldwell. ore
From: mark@pioneerirrigation.com
Message Score: 20
My Spam Blocking Level: High
Login
High (60): I'ass
Medium (75): Pass
Low (90): Pass
Block this sender
Block pioneerirrigation. com
This message was delivered because the contentfilter score did not exceed yourfilter level.
.DD\1