Loading...
HomeMy WebLinkAboutPublic Agencyr C Memorandum To: Community Development From: Gordon Law, City Engineer Tim King, Engineering Tech II Re: SUP 305-08 Juso Kapic Date: February 18, 2008 The Engineering Department provides the following comments on a request by Juso Kapic for annexation of 1.5 acres into the City of Caldwell with C-2 Community Commercial zoning, a comprehensive plan map designation of Commercial, a development agreement and a Special Use Permit for a single-family residential dwelling in a Community Commercial zone. The site is located at 3521 East Ustick Road. Development Plans 1. Development Plans —Prior to commencing construction, plans must be prepared by the developer's engineer and approved by the City Engineering Department which shall include the following items: a. Street section and alignment (including curb and gutter); b. Sidewalk (5 foot on Ustick Road); c. Potable water (per City and DEQ requirements); d. Stormwater facilities (per City Policy); e. Street lighting (per City & Idaho Power requirements); f. Vertical Datum based on NAVD 88 Datum. Irrination 1. Irrigation water shall be obtained from applicable Irrigation District sources. City municipal water may be used only if the criteria specified in the Landscape Ordinance Section 10-07- 12 are met. 2. The developer shall maintain any existing upstream drainage rights and downstream irrigation water supply rights across the property. During the design phase of this project, the developer or his engineer is to contact the appropriate irrigation district to help ascertain these rights. These rights shall be shown in full, topographically, and submitted for review along with the developments proposed construction drawings. Appropriate facilities to Page 1 of 3 ) 6 - \ r r convey irrigation and drainage water across the property to take care of any offsite needs shall be included. Existing irrigation facilities shall be relocated out side the public right-of- way. There is to be no discharge of gravity irrigation return water into the storm water system. 3. Supplying irrigation district shall approve the location of the delivery point. Storm Drain 1. As noted previously, provision is to be made for the disposal of stormwater drainage in accordance with the City Stormwater Management Manual and any updates adopted subsequent to this application. A copy of this policy is available upon request. The engineer of record is to provide calculations, which indicate that the assumptions in his stormwater drainage plan comply with the requirements of the stormwater manual Rights -of -Way 1. Ustick Road is classified as a Principal Arterial. The applicant shall be required to dedicate as public right-of-way a forty-five (45) foot one-half width right-of-way along the entire Ustick Road frontage (minus existing) to meet City of Caldwell requirements. Street 1. The applicant shall improve Ustick Road to include a 33- foot one- half width street section from centerline to back of curb. The street shall feature standard vertical curb and gutter, 5 foot sidewalks, sub -base and asphalt paving, required storm water drainage facilities and streetlights. These improvements shall extend the entire length of the subject properties Ustick Road frontage. 2. Any approaches on Ustick Road shall be required to comply with ACHD intersection and driveway spacing and alignment standards as adopted by the City of Caldwell. Traffic Mitigation 1. Future development shall require the applicant to participate in a traffic study. Sanitary Sewer The applicant shall not be required to extend City sewer services to the subject property at this time. Extension may be required as a condition of subsequent land use application. Water Page 2of3 r 1. Water is available from a 10" line located adjacent to the subject properties southerly boundary in Ustick Road. 2. All on site water mains will need to be looped into existing mains for fire flow and water quality purposes. Internal main sizing and construction plan approval, will be dependent upon the availability of fire flow. 3. The location of water service and providing of easements are to be decided during review of improvement plans. General 1. Construction of dedicated facilities or construction within any dedicated right-of-way is to be performed by an appropriately licensed public works contractor and shall comply with applicable City, State, and Federal standards. 2. Prior to commencement of construction in any dedicated right-of-way, or construction of any improvement intended for dedication to the City or connected to a City facility, the City Engineering staff is to be notified. 3. All traffic control for the project shall meet the requirements of the Manual on Uniform Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide a traffic control plan to the City Engineer for review prior to any construction within the right-of-way. 4. Prior to commencement of construction in any dedicated right-of-way, or construction of any improvement intended for dedication to the City or connected to a City facility, the City Engineering staff is to be notified. This preferably will take place in a pre -construction conference scheduled by the engineer of record in which all appropriate personnel and utilities are present. Appropriate City personnel are to be notified in advance of all testing (including compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of the testing. The engineer of record or his designated representative is to witness all tests and a log of inspection visits and testing results is to be kept by the engineer of record or his representative. 5. Existing easements for drains, canals or supply ditches not including prescriptive and appropriate easements, existing or new, for transmission lines, and other utilities shall be clearly indicated on the submitted site plan. 6. No structures shall be placed within easements. 7. The applicant shall construct pathways along all waterways in keeping with City Code 10- 07-11. 8. Any note, item or drawing element on the plats, construction drawings, engineering drawings and/or design drawings related to the property inconsistent with City Codes, Policies and/or Ordinances shall not be construed as approved unless it has been specifically addressed and granted by City Council. Page 3of3 r Memorandum To: Community Development From: Gordon Law, City Engineer Tim King, Engineering Tech II Re: SUP 305-08 Juso Kapic Date: March 6, 2008 The Engineering Department provides the following comments on a request by Juso Kapic for annexation of 1.5 acres into the City of Caldwell with C-2 Community Commercial zoning, a comprehensive plan map designation of Commercial, a development agreement and a Special Use Permit for a single-family residential dwelling in a Community Commercial zone. The site is located at 3521 East Ustick Road. Development Plans 1. Development Plans — Prior to commencing construction, plans must be prepared by the developer's engineer and approved by the City Engineering Department which shall include the following items: a. Street section and alignment (including curb and gutter); b. Sidewalk (5 foot on Ustick Road); c. Potable water (per City and DEQ requirements); d. Stormwater facilities (per City Policy); e. Street lighting (per City & Idaho Power requirements); f. Vertical Datum based on NAVD 88 Datum. Irrigation 1. Irrigation water shall be obtained from applicable Irrigation District sources. City municipal water may be used only if the criteria specified in the Landscape Ordinance Section 10-07- 12 are met. 2. The developer shall maintain any existing upstream drainage rights and downstream irrigation water supply 'rights across the property. During the design phase of this project, the developer or his engineer is to contact the appropriate irrigation district to help ascertain these rights. These rights shall be shown in full, topographically, and submitted for review along with the developments proposed construction drawings. Appropriate facilities to Page 1 of 3