HomeMy WebLinkAboutSite Plan1
I AGRICULTURAL LAt D
15 89' 50' 21" E
� I
IRJTURE ELEMENTARY SCHOOL
BASEBALL A 68000 SF
I
OPEN GRASS 4AY FIELD
iu I
m
0
A
J Z
J
HARD SURFACE PLAY AREA
SOCCER FIELD
TENNIS
COURTS
VOLLEYBALL 4 BASKETBALL
FUTURI= MIDDLE SCHOOL
APPf?OX. 1500M SF
USTICK ROAD
N89'S0'21"W
PHASE TWO
PHASE ONE
ACCESS ROAD
NORTH
WIN
SOME pL&H FORD, W&LLOMMIE SCHOOL oos=rmccr ipRommiry A 3
0 0"GHT DESIGN HEST ARCHITECTS P.A.
DESIGN CONCEPTS AND WWNGS
WRITTTTERPERIM T T°�iARRM MTECT SCALE: NTS
le
I AGRICULTURAL LAND
� I
IFUTURE ELEMENTARY SCHOOL
BASEBALL APPRox. 6som SF
OPEN GRASS FAY FIELD �II
w I!
(,
ap
e
ID 9
z
J
SOCCER FIELD
USTICK ROAD
N 89' 50' 21" W
w� .. SOME IPLAH FOR WALLMUE SCHOOL 0087ROCT VROPIER7V
�0 CWYMW� � SCALE: N,s
PHA4 TWO _
PHASE ONE
ACCESS ROAD
NORTH
��3
Y
l
I AGRICULTLRAL LAND
RJTURE ELEMENTARY SCHOOL
BASEBALL AF'PROX. 68000 SF
OPEN GRASS 4AY FIELD j I
SOCCER FIELD
N 89' 50' 21" W
USTICK ROAD
D
BOVE M&H FOR WALLOWUE SCHOOL M37MC7 [PROPERVU
0 COPYRIGHT DESIGN HEST ARCHITECTS PA
DESIGN CONCEPTS AND DRAVANGS
WRITTENPTOEPo�1159R ARCHITECT SCALE: NTS
PHASE T W
PHASE ONE
ACCESS ROAD
NORTH
A�S
January 6, 2004
lo•oz-Z)
'Lpytic'� Z�o��
�i t
`D
NAIDAH
Pl LMA[Q VtfASHINGTON
RICHLAND,W HUSti(l
DESIGN WEST it 6)6
ARCHITECTS, PAW% }
rLFTHAVENUE 50UTH
, IDAHO 83651.3922
TEL. 209-466-4651
FAX: 208-465-9822
Debbie Geyer
Caldwell Community Developm
621 Cleveland Boulevard
Caldwell, ID 83605
Re-- Vallivue Intermediate School, SUP-192-03
Dear Debbie,
JAN --7 2004 !;
Early in the design process for the Vallivue Intermediate School, a Caldwell
Land Use Development Report was submitted. Now that the design process
has moved forward through the Design Development Phase, I would like to
update some of the information presented in the initial Land Use
Development Report. Please see the following revised project narrative
information:
SUPPLEMENTAL PROJECT NARRATIVE
The property fronts on the future Dry Lane Road for a distance of 1327.88'.
he project will be phased with the initial construction consisting of an
termediate school. Future phases are based on Vallivue School District
needs and school bond elections, however planned phases include enlarging
the intermediate school into a middle school and constructing an elementary
school.
The maximum b ildmg height shall be 40 and the maximum number of
stories shall be 2 f�the proposed development.
No turnarounds or traffic circles will be constructed for public roadways.
The number of daily transportation trips has been identified in the traffic
study previously presented to the City.
The development's required fire flow is approximately 1,500 gpm at 20 psi.
The applicant -has not yet sought relief or exception from any City ordinance
or resolution. The lint.de aea f ure s ou �t be an item that
is in est merest of the Vallivue School District and can be reasonably
accommodated by the City of Caldwell.
I would be most appreciative if you would add this information to the
a propnate project file. Thank you again for your help with this matter.
�ave any questions, please do not hesitate to contact me.
rice'reTy, �I tak 'lj
AV WaU VAC)� WIK V-- W
�3�PPwfwh aer
Bill Hamlin
Architect