Loading...
HomeMy WebLinkAboutPublic Agencyoo PUBLIC AGENCY ITEM DATE SUBMITTED BY ?X-t vWYtP $'3b-ae-Cu,,&r,\-lau-) 0A.z ru/,utD b'l-@ .',:\' b%Bt"n-:n ar oo CALDWELL FIRE DEPARTMENT CITY OF CATDWEIL 3 l0 Soulh 7th Avenue CALDWELL,IDAHO 83605 (208) 45$3032 Protecting Yow Propertg Sauing Lircs TO DATE: FROM: SUBJECT: June 1,2000 Linda James, Community Development Director Douglas Brown, Fire Marshut ?N. Comments for CaldwellP&Z Commission (June 8th Hearing) The Caldwell Fire Department (CFD) offers the following comments regarding cases to come before the caldwell Planning andzontngcommission on June g,2000: Case No. ANN-34-00 / Westpark & Briggs Engineering 36.82 Acre arinexation / vicinity of ustick and Middleton Rds. The CFD wants the developers of this proposed annexation to be aware of the need to extend municipal water service and access to these parcels for fire protection purposes. This must occur before development (combustible construction on-site) may occur. Case No. SUP-86-00 / Tamarack Properties, Inc., Applicant Six four-plex dwelling units / N. Michigan Avenue The CFD has reviewed the plot plan for this project and will require the following: A. Access is inadequate as shown. The interior roadway must be increased to 20'in width and the turnaround at the end must be a 50' radius bulb or other approved tumaround configuration (i.e. a hammerhead). The roadway and bulb will be considered fire lanes and appropriate signage and red curbing indicating No parking will be required. B. At least one on-site fire hydrant will be required at approximately the location of the driveway to the on-site parking. An additional fire hydrant may be required on N. Michigan, depending on the location of any existing hydrants nearby. The minimum required fire flow is 1,000 GPM. C. A common address will be assigned to the complex with sub-addresses (unit numbers) assigned to each living unit. D. One 2A:10BC fire extinguisher, stored in an approved. cabinet, shall be provided for each duplex. qN 1/ o a Case No. ANN-33-00 / Crestline and Heartland Development Cos. 10 Acre Annexation / vicinity of Highway 20126 and KCID Road. The CFD wants the developers of this proposed annexation to be aware of the need to extend mwricipal water service to these parcels for fire protection purposes. This must occur before development (combustible construction) may occur. Case No. ANN-32-00 and SUB-50P-00 / Crestline and Heartland Development Cos. Colonial Heights Subdivision / Vicinity of Highway 20126 and KCID Road. The CFD wants the developers of this proposed subdivision to be aware of the need to extend muricipal water service and associated fire hydrants for fire protection purposes. This must occur before development (combustible construction) may occur. The minimum required fire flow for SFR dwellings is 1,000 GPM. Fire hydrant locations will be determined by the CFD in cooperation with the project's civil engineer. ''*"'ri'# *.-F-. Access within this development will be limited since it will be built in three phases. Therefore, each phase will be considered solely on its own ingress and egress capabilities. Prior to combustible materials being brought onto site the all-weather access roadways must be installed and functional. For dead-end rbadways over 150 feet long, an approved turnaround is required. At the development of Phase 2, a secondary access roadway will be required connecting to Highway 20126. As a condition of development of Phase 3, the CFD would insist on the permanent extension of the roadway (shown on the plans as "Amherst Ave.") to corrnect with Highway 20/26 through Lot 29. The common area detention would need to be modifled to accommodate this requirement. This access is necessary based on the uncertainties of development and possible future phases to the east. The street names which were submitted (Amherst Ave., Auburn Dr., Chesapeake Ave., Colonial Drive, Dorchester Ave., Montpelier Dr. and Roanoke Dr.) are being reviewed for acieptance by the CFD. If any of these names are already assigned to streets in Canyon County, or if any sound similar to existing streets in Canyon County, the developer will be asked to submit different nilmes for consideration. Street name signs are required to be installed prior to the start of combustible'construction. Street addresses will be assigned once a final plat map is recorded. Temporary addresses must be posted on buildings under construction and permanent addresses installed prior to occupancy. t Io To Re: Memorandum Linda James Gordon Law, City Engineer Case No. A){N-33-00 10 Acre Parcel at SE Corner of Highway 20126 and KCID Road May 30, 2000 /4r#-From Date The Engineering Department has reviewed the request to annex Development and Heartland Development into the City as aC2 Department provides the following coflrments on the request: l. The present City sewer and water systems are approximately I mile from the area to be annexed. The City will shortly op.n bidr for construction projects, which will extend sewer and water to within t/z mile of the site. 2. The State of Idaho is requesting a 75-foot half right-of-way width on Highway 20126 andthe City Code specifies a minimuri half right-of-way width for KCID Road of 30 feet. The obtaining oiright-of-way is normally done in connection with either platting or building permit applications. 3. The City Engineering Department does not oppose the annexation request or the requested zoning designation. l0 acres by Crestline Zone. The Engineering (fr't