Comments for CaldwellP&Z Commission (June 8th Hearing)
The Caldwell Fire Department (CFD) offers the following comments regarding cases to come
before the caldwell Planning andzontngcommission on June g,2000:
Case No. ANN-34-00 / Westpark & Briggs Engineering
36.82 Acre arinexation / vicinity of ustick and Middleton Rds.
The CFD wants the developers of this proposed annexation to be aware of the need to extend
municipal water service and access to these parcels for fire protection purposes. This must occur
before development (combustible construction on-site) may occur.
Case No. SUP-86-00 / Tamarack Properties, Inc., Applicant
Six four-plex dwelling units / N. Michigan Avenue
The CFD has reviewed the plot plan for this project and will require the following:
A. Access is inadequate as shown. The interior roadway must be increased to 20'in width and the
turnaround at the end must be a 50' radius bulb or other approved tumaround configuration (i.e.
a hammerhead). The roadway and bulb will be considered fire lanes and appropriate signage
and red curbing indicating No parking will be required.
B. At least one on-site fire hydrant will be required at approximately the location of the driveway
to the on-site parking. An additional fire hydrant may be required on N. Michigan, depending
on the location of any existing hydrants nearby. The minimum required fire flow is 1,000 GPM.
C. A common address will be assigned to the complex with sub-addresses (unit numbers) assigned
to each living unit.
D. One 2A:10BC fire extinguisher, stored in an approved. cabinet, shall be provided for each
duplex.
qN 1/
o a
Case No. ANN-33-00 / Crestline and Heartland Development Cos.
10 Acre Annexation / vicinity of Highway 20126 and KCID Road.
The CFD wants the developers of this proposed annexation to be aware of the need to extend
mwricipal water service to these parcels for fire protection purposes. This must occur before
development (combustible construction) may occur.
Case No. ANN-32-00 and SUB-50P-00 / Crestline and Heartland Development Cos.
Colonial Heights Subdivision / Vicinity of Highway 20126 and KCID Road.
The CFD wants the developers of this proposed subdivision to be aware of the need to extend
muricipal water service and associated fire hydrants for fire protection purposes. This must occur
before development (combustible construction) may occur. The minimum required fire flow for
SFR dwellings is 1,000 GPM. Fire hydrant locations will be determined by the CFD in cooperation
with the project's civil engineer. ''*"'ri'# *.-F-.
Access within this development will be limited since it will be built in three phases. Therefore, each
phase will be considered solely on its own ingress and egress capabilities. Prior to combustible
materials being brought onto site the all-weather access roadways must be installed and functional.
For dead-end rbadways over 150 feet long, an approved turnaround is required.
At the development of Phase 2, a secondary access roadway will be required connecting to
Highway 20126. As a condition of development of Phase 3, the CFD would insist on the permanent
extension of the roadway (shown on the plans as "Amherst Ave.") to corrnect with Highway 20/26
through Lot 29. The common area detention would need to be modifled to accommodate this
requirement. This access is necessary based on the uncertainties of development and possible future
phases to the east.
The street names which were submitted (Amherst Ave., Auburn Dr., Chesapeake Ave., Colonial
Drive, Dorchester Ave., Montpelier Dr. and Roanoke Dr.) are being reviewed for acieptance by the
CFD. If any of these names are already assigned to streets in Canyon County, or if any sound
similar to existing streets in Canyon County, the developer will be asked to submit different nilmes
for consideration.
Street name signs are required to be installed prior to the start of combustible'construction. Street
addresses will be assigned once a final plat map is recorded. Temporary addresses must be posted
on buildings under construction and permanent addresses installed prior to occupancy.
t
Io
To
Re:
Memorandum
Linda James
Gordon Law, City Engineer
Case No. A){N-33-00
10 Acre Parcel at SE Corner of Highway 20126 and KCID Road
May 30, 2000
/4r#-From
Date
The Engineering Department has reviewed the request to annex
Development and Heartland Development into the City as aC2
Department provides the following coflrments on the request:
l. The present City sewer and water systems are approximately I mile from the area to be
annexed. The City will shortly op.n bidr for construction projects, which will extend sewer
and water to within t/z mile of the site.
2. The State of Idaho is requesting a 75-foot half right-of-way width on Highway 20126 andthe
City Code specifies a minimuri half right-of-way width for KCID Road of 30 feet. The
obtaining oiright-of-way is normally done in connection with either platting or building
permit applications.
3. The City Engineering Department does not oppose the annexation request or the requested
zoning designation.