Loading...
HomeMy WebLinkAboutPublic Agencya) PUBLIC AGENCY ITEM DATE SUBMITTED BY Px - [ snrp,\A.,I - 2,c\ -r\z-\.rt .o B,n r=or:n PA- z rrf\e-u.r>\- zq-bz ----o ArstIL\.\ [,-rr) o e MEMORANDUM Re: To:STEVE HASSON From: GORDON LAW, CITY ENGINEER Case No. ANN-62-01 Annexation Request for 100.29 acres Donald Mai Date:January 25,2002 The Engineering Department has reviewed the proposed annexation and corresponding zoning designations for the referenced application. This department does not oppose the annexation, and provides the following comments: The City water system is capable of providing service to the area. Water mains are in place on the southern border ofthe properfy, and are currently under construction on the eastern border ofthe properfy. The City sewer system currently extends south on Indiana Ave., approximately 400 feet west of the north portion of the properry, and approximately 1000' west of the south portion of the property. Access to the system will require negotiation of easements across private property, and a crossing of the Dixie Drain. In accordance with the Dixie Interceptor Study, the existing system has adequate capacity for the proposed zoning designation (R-l). As this property develops and preliminary plats or building permits are processed, the City of Caldwell will require dedication of right of way for the following roadways: . Florida Avenue, along the eastern boundary o Homedale Road, along the southern boundary o Laster Lane, along the northern boundary This area is experiencing rapid and expansive growth. Accordingly, the City of Caldwell may need another municipal well for domestic water supply. The developer(s) will be approached regarding dedication of a municipal well site during the preliminary plat process. 2. J 4 JAN 29 2002 tr@ tr[Vtr P|./t- I I I It I Iti oo 'l'o rF:r t_=trilVE JAN 29 TJAZ D,AT'FI:Janrrary 28,2002 Steve Hasson, Contmunity Development Director FROM Douglas Brown, Assistant Chief / Fire Marshal SUBJECT':Comments for Caldwell Hearing Examiner February 7, 2002 Meeting The Caldwell Fire Departmelt (CFD) offers the followiug comments regarding tht: [b[]urving ca5es to conle before the Caldwell Hearing Examiner on Februar y 7 ,2002: 1'[e CFD has previously commented and placed numerous conditions on the prol)(]sc(t proj.'ct l'lre CFD does not object to a one-year extension being granted to the Applicant. l)le,t-te tu)ie that my records inclicate that the original Monarch Subdivision was split irilo nrct \aJ.i111'117s' sttbclivisions - the Monarch Subclivision and the Blackhawk Subdivision. (lase No: Applicant: Project: Location: Case No: Applicant: I'roject: Location: Case No: z\pplicant: Pro.iect: l-ocation: suB-58E-00 Parkland Developrnent Monarch Subdivision East of Middleton Road and Ustick Road ANN-63-01 Carl Mai N/A SW comer of Homedale Road and S. Florida Road ANN-62-01 Donald Mai N/A NW corner of Homedale Road and S. Florida Road The CFD has no objection to this annexatiott of 78.34 acres -the CFD has no objection to this annexation of 100.29 acres I PN-\ o SUB.65P.O2 Crestline and Heartland Development Pennsylvania Park Subdivision South of Hwy.20-26 andwest of KCID Road o Case No: Applicant: Project: Location: The CFD has met with the Applicant's representatives and other city staff to discuss this project. ln reviewing the preliminary plat map, several issues surfaced that the CFD and the Applicant's representatives have reviewed. The issues that have been discussed involve the following: the provision ofsecondary access through all phases ofthe project, fire hydrant locations and street names. To meet the secondary access requirements may require that the Applicant provide temporary roadways, which the Applicant has agreed to provide. Fire hydrant locations will be decided phase-by-phase by the Fire Marshal, therefore, those shown on the preliminary plat map are non-applicable. During the meeting with the Applicant's representatives it was noted that the street names shown on the preliminary plat map had not been accepted or approved by the CFD. It was also noted that there were two separate instances where the same street name had been submitted within this project. The CFD will review all other submitted street names and approve them as applicable. The Applicant's may then submit altemate names for those street names rejected or duplicated. Case No: Applicant: Project: Location: ANN-64-02 Clayne Hanson Mini-storage facility and caretaker unit NE comer of Montana Ave. and Ustick Road The CFD has met and conferred with the Applicant regarding this project. Since the project was originally proposed several months ago, specific conditions relating to fire hydrant locations, gates, roadways, turning radii, fire separation, etc. will be set forth in detail during the plan review process. The CFD is on record as supporting this annexation and has encouraged the Applicant to annex to the City of Caldwell from the concept of the project. This was necessary in order for the Applicant to receive "city''water for fire protection. Therefore, the CFD supports this annexation. Z