HomeMy WebLinkAboutPublic Agencyo o
PUBLIC AGENCY
ITEM DATE SUBMITTED BY
{ W"na
Qo'', *T;r-.,-\.c l- .)-l ' 1-or)
:I J V-.-43* a-t
t
o o
Memorandum
To: Jarom Wagoner, Senior Planner
From:T.J. Frans - Project Manager - Engineering
Greg Korsak - Engineering Tech I
Re:Windsor Creek No. 4 Subdivision
Date: August 7,2017
The Engineering Department has reviewed the proposed final plat for Windsor Creek No. 4
Subdivision and provides the following comments regarding the project and the submitted final plat:
1. The following items must be completed before signing of the final plat. These ltems can not be
bonded for:
a. The water system is not operational. The water system has not been constructed or
pressure tested and clean water samples have not been received. The final plat will not
be signed, and no building permits will be issued untilthis emergency requirement is
complete.
b. All weather surfaces are not in place. Compaction test results have not been submitted
for the roadways and no core samples have been taken. The final plat will not be
signed, and no building permits will be issued untilthis emergency requirement is
complete.
c. Street signs have not been installed. The final plat will not be signed, and no building
permits will be issued until this emergency requirement is complete.
d. Sewer system is not operational. The line has been constructed, but pressure testing
and video has not been submitted and approved. lnterim as-builts have not been
approved. The final plat will not be signed, and no building permits will be issued until
this emergency requirement is complete.
2. Construction security will have to be provided for those items which are not among the big four
and not yet completed prior to signing of the final plat. The City has not agreed on a bond
amount for those improvements not yet constructed.
3. The final plat drawing has been submitted to the City of Caldwell but not yet reviewed. The final
plat drawing will have to be done in accordance with City codes, policies, and ordinances prior
to the City signing the final plat.
4. ln an effort to expedite the addressing process of the final plat, the City is asking that 2
electronic copies on 2 separate CD's in AutoCAD format be returned with a revised full set
bond copy of the final plat.
(w-
Page 1 of 1
b o
April Gabello
From:
Sent:
Subject:
Attachments:
Angie Hopf
Monday, April 09, 2018'11:32 AM
FW: Windsor Creek #4 address revised
Windsor Creek 4-rev.Pdf
please see revised addressing for Windsor Creek 4, there was a mistake in numbering on LT 3 BLK 23
Angie Hopf
GIS Analyst, City of Caldwell
Phone 208.455.4685
Fax 208.455.3012
E m a il ahopf@citvofcaldwell.ors
From: Dave Marston
Sent: Monday, APril 09, 2018 11:24 AM
To: Angie Hopf <ahopf@cityofcaldwell.org>
Subject: Windsor Creek #4
Angie,
See revised Windsor Creek #4 addressing for Lot 3 of Block 23.
Dave Marston
City of Caldwell
(208)455-4676
1
it
E
=WINDSOR
CREEK NO.4
VICINITY MAP
STREET ADDRESS NUMBER
LOT NUMBER
ELOCK NUMBER
20
LEGEND: 3o2o
NOTE:
Lot 53 of Block 14, Lot 24 of Block 21,
tot S ot Atock 2J, ond Lot 1 of Block 25
ore non-residentiol common oreo lots to
u" o-eo uy tne Homeowners Associotion'
frl
z
F]
rqv
1 2906
34
12894
3533
1292012932
31
12929./ .o./3/rcto
1
oN(.o
(O
1 2899
\z
rO
(o(ot5
14
o(o
@
@
4
11 2898
o,(O /t(o
13
o,orr)(o
12
Fr\rJ)(o
11
rr)('o
rr)(o
1 28851
o\(o \rlr)(o\
1 2850
6
12838
7
w
5
COMMON
AREA
LOT12884
4
olr)lr)(.o /s
1 28961 2930
rO
rOrr)
@
10
21
IOlr)lo(o
strr)(o
<\t+lr)(.o
E/'
1 2954
1 2839
2
@
1287112883
31
1 2895
30
12907
29
Or
rn .25rO\
2955
23
Nrr)(o
o)orr)(o
1 293r
27
12e191
2A
12943
26
MARNA STREET
FI
z
tr1
z
(n
=
MOSS STREET
CONNER
STREET
SONDRA STREETtI] frl-f>Y2ErJtrl >EA<trl14 tr1
za
=
PREPARED BY:
D. MARSTON
ADDRESS NUMBERING FOR:
WINDSOR CREEK NO" 4
A Dorl of tho Nlt tl ol Secti@ 12,
iovoshio J Nora, Rohgc 3 lyest'
Eoisc Neidion, Conyon County' ldoho
E
CITY
OF
CALDWELL
DATE:
20 MAR 2018
o
1
I