TO: Pat Walsh — ZGA Architect
DATE: 5-17-04
FAX: 343-7162
FROM: Mark Zirschky — Pioneer Irrigation District
RE: YMCA - Final Plat Contingencies
PAGES: 3
Notes:
Pat,
Please review the following letter, sent by Pioneers engineer. If this does not outline
what we need prior to final plat, please let me know.
Thanks
YAY.17. 2e04 19: 35AM - - ERr Associpms
z
EARL, MASON, & STANP]ELD, INC.
ftOMSSIONALENGRY MM. LANs Srra'vWORS, & PLv VFAIU
314 SAmoLA 5Tm=
CAL1aWElc4 I] ARO 83605
May I7, 20(X
Pioneer Irrigation Distdct
AWL' Jeff Scott, Supt.
P.O. Box 426
QkIdWall, ID 83606.0426
Re: Caldwell Family YMCA =0 Lateral Tiling Plan) - I" Review
sew
NO.372 P. 1
TZLEMO (ZM 454-W6
PAL' aW 04K0979
�: wmesanC�ert
After review of the inWaveinent plans for the above-refemced project Earl, Mason, & Stanfield,
Inc. believes the following items are of W acecn to the District.
A note referencing the latest Pioneer Imigatiou District Standards shall be added to the plans.
The design engineer sbali revise tie final plat to make the 20-foot access, opft-aEan, and
maintena w easement for the benefit of the Pioneer kr igation District along them'" Lateral pipe.
/ 'the "-V Lateral piping shall be centered withm this easement. UtLhties are not allowed to run
parallel to the -11--0 L.4W01 within this easement. Said easement shall be included within the
• District regtuxed licensing agreemorlt- Although bone are shown, any relocated utility poles shall
Ua be outside the District's 20-foot easement, 'Tile final plat shows a prescriptive easement for the
Caldwell Low I-= Canal. The final plat shall be revised to make said easement pern=ent and
free of obstructions.
Icrizantal dimensions shall be added to the improvement thawing& to enable the District to
datermine the exact distance from the ft re right -of way tothe cuter of the proposed piping.
The design engineer shall provide additional information detaftg the transition from pVC pipe to
RCP pipe at the access points,
IlIdgation Box "A" shall be equipped arith 2"x4" notches and checkboards for controlling irrigation
water delivery to the adJ2=nt PrOPen9 ow=_ In addition, the ird9adon; weir box structure shall be
revised to include concrete wing vc►al]s, The design eAgme- sr shall remove the I -foot sump shown
in the 'Txagation boxes, and shall insure the box tops are 1-foot minimum and 4-feet maximum
above finished grade,
WaUT crossings are proposed, All cmdaxground utility crossings shall be completed below the a6
Iiarierat piping.
Any encroachments into 'c brain shall be submitted to Mr. Iohn Caywood at the Baited
States Burrau of Reel on.
EARL, MASON, & STA-�'F=t I INC.
P-ROPUSroN.L EIVGJNEM, LAND SX'"EYO,RS, & PLANNERS
page 2
rr�eat with the DiStriot, The sidewalk, landscaping,
The develop= shall execube a kcenai� egret ctin the District's facilities will bo
utility and access crossings, as well as at
hes itoms imps g
addressed within the DiStact licensing moment.
v A.ifi�r final approval is received,
Plans shall be revised mzd resubmitted prior to finOl appro al. As c0nsmcdou Proceeds Parr Nissan, Stanfield,
Earl, Mason, Stanfield, • a ershallvati n for Pioneer IrdS on D �-
Inc. will coaduct cam mots
The contractor and owner should be aware that all construction within District faeflities sba.11 be
completed after November 1% and prior to March 15h-
problem system. Said rewisvc► is only for general conformance
Our re view does not guarantee a pro andble far ding a fully
with the pioneer Inigation DtstnCt Standards. The developer is rasp P�
f mcrional system that follows the lute % of the District sraadards-
I look forward. to discussing these items or any other conceals you may have repr ing this �oject,
Please let me know if you havo any questions or need addi tiolll Woaaation.
Sincewly,
William'1. Mason, F.E.
Earl, Mason, & Stanfield, Inc.
cc -
Scott Woods — city of CaldweU Engineering Dept, via fas 455-3012
Chad zones — S & .A EnOu s, In,c. via fax 343-3381
fie
r"
Memorandum
To: Steven Hasson, Community Development Director
From: Ben Weymouth, Assistant City Engineer
Re: SUB-99F-04, YMCA �
Date: May 2004
The Engineering Department has reviewed the proposed final plat for YMCA and provides the
following comments on the submitted final plat:
1. The City of Caldwell is providing $100,000.00 for the Indiana Ave. frontage improvements. If
estimated costs of the frontage improvements exceed $100,000.00 dollars a construction
security will have to be provided for those items not yet completed prior to signing of the Final
Plat.
2. The final plat drawing shall be corrected in accordance with the marked -up copy done May 11,
2004 and mailed to Anderson -David & Associates, Inc. on May 11, 2004.
3. All public service health and safety requirements have been met.
GNFO
Page 1 of 1
04/10/2004 16:34 FkX 9054594491 PIONEER IRRIGATION
10001
Pioneer Irrigation District
A 0. BOX 429 - CALOWELL. IDAHO 33806
JEFF SCOTT X13j 4%3517
Superinmadent
XkRK M SCHKle NAMA KELLEHER
Ain Supatamndent Secretary-Ttenum
April 1 9, 2004
City of Caldwell Community Development Department
Fax: 455-3050
Attn: Jacqueline Hernandez
Re: Case No. SUB-991~ -04 - Final Plat (YMCA)
To Whom It May Concern:
°�! r APR 1 ,I
i
: r
Please be advised that Pioneer Irrigation District has not yet reviewed plans dealing with the
relocation of 25.1 Lateral along the frontage of the YMCA property. It is our concern, that Pioneer
Irrigation District approve said plans prior to final plat being, given. For this reason, Pioneer
Irrigation District would request that final plat be denied at this time, to assure that the appropriate
layout of the 25,1 Lateral is platted.
At this tinie, all conversations dealing'Aith the 25.1 Lateral have all been preliminary, and have not
yet been approved.
it also shall be noted that the Lowline canal at the westerri end of the project has a 16-foot from top
of bank prescriptive use easement It shall also be noted that the Dixie drain is a federal drain,
having a 110-foot federal right-of-way. Said easements shall also be noted on final plat.
NOTE: This fetter does not authorize any coastrnetion to commence until all the necessary
agreements with Pioneer Irrigation District have boen executed and recorded.
If you have any questions, please feel free to call.
Sincer y
V/
mar • F Zirschky
Assistant Superintendent
Cc: Scott Campbell - Moffatt, Thomas, Barrett, Rock & Fields via fax 395-5384
Bill Mason - Earl, Mason and Stanfield via fax 454-0979
Ben Weymouth •- City of Caldwell Engineering via fax 455-3003