Loading...
HomeMy WebLinkAboutPublic AgencyPUBLIC AGENCY IF Emmomm— ITEM DATE SUBMITTED BY ane-er 1✓rya-h S,-1-7-D4 PPS T4--v r IIA i J JSFF scoTr Superintendcnt ,rl ARx zuisci ICY Atst Superinrendeat Pioneer Ir-rigati'h District R 0, BOX 426 . CALDWELL. IDAHO 83606 (206) 459-3617 NAMA KELLEHER Scc==y-Trcasuref FACSIMILE TO: Pat Walsh — ZGA Architect DATE: 5-17-04 FAX: 343-7162 FROM: Mark Zirschky — Pioneer Irrigation District RE: YMCA - Final Plat Contingencies PAGES: 3 Notes: Pat, Please review the following letter, sent by Pioneers engineer. If this does not outline what we need prior to final plat, please let me know. Thanks YAY.17. 2e04 19: 35AM - - ERr Associpms z EARL, MASON, & STANP]ELD, INC. ftOMSSIONALENGRY MM. LANs Srra'vWORS, & PLv VFAIU 314 SAmoLA 5Tm= CAL1aWElc4 I] ARO 83605 May I7, 20(X Pioneer Irrigation Distdct AWL' Jeff Scott, Supt. P.O. Box 426 QkIdWall, ID 83606.0426 Re: Caldwell Family YMCA =0 Lateral Tiling Plan) - I" Review sew NO.372 P. 1 TZLEMO (ZM 454-W6 PAL' aW 04K0979 �: wmesanC�ert After review of the inWaveinent plans for the above-refemced project Earl, Mason, & Stanfield, Inc. believes the following items are of W acecn to the District. A note referencing the latest Pioneer Imigatiou District Standards shall be added to the plans. The design engineer sbali revise tie final plat to make the 20-foot access, opft-aEan, and maintena w easement for the benefit of the Pioneer kr igation District along them'" Lateral pipe. / 'the "-V Lateral piping shall be centered withm this easement. UtLhties are not allowed to run parallel to the -11--0 L.4W01 within this easement. Said easement shall be included within the • District regtuxed licensing agreemorlt- Although bone are shown, any relocated utility poles shall Ua be outside the District's 20-foot easement, 'Tile final plat shows a prescriptive easement for the Caldwell Low I-= Canal. The final plat shall be revised to make said easement pern=ent and free of obstructions. Icrizantal dimensions shall be added to the improvement thawing& to enable the District to datermine the exact distance from the ft re right -of way tothe cuter of the proposed piping. The design engineer shall provide additional information detaftg the transition from pVC pipe to RCP pipe at the access points, IlIdgation Box "A" shall be equipped arith 2"x4" notches and checkboards for controlling irrigation water delivery to the adJ2=nt PrOPen9 ow=_ In addition, the ird9adon; weir box structure shall be revised to include concrete wing vc►al]s, The design eAgme- sr shall remove the I -foot sump shown in the 'Txagation boxes, and shall insure the box tops are 1-foot minimum and 4-feet maximum above finished grade, WaUT crossings are proposed, All cmdaxground utility crossings shall be completed below the a6 Iiarierat piping. Any encroachments into 'c brain shall be submitted to Mr. Iohn Caywood at the Baited States Burrau of Reel on. EARL, MASON, & STA-�'F=t I INC. P-ROPUSroN.L EIVGJNEM, LAND SX'"EYO,RS, & PLANNERS page 2 rr�eat with the DiStriot, The sidewalk, landscaping, The develop= shall execube a kcenai� egret ctin the District's facilities will bo utility and access crossings, as well as at hes itoms imps g addressed within the DiStact licensing moment. v A.ifi�r final approval is received, Plans shall be revised mzd resubmitted prior to finOl appro al. As c0nsmcdou Proceeds Parr Nissan, Stanfield, Earl, Mason, Stanfield, • a ershallvati n for Pioneer IrdS on D �- Inc. will coaduct cam mots The contractor and owner should be aware that all construction within District faeflities sba.11 be completed after November 1% and prior to March 15h- problem system. Said rewisvc► is only for general conformance Our re view does not guarantee a pro andble far ding a fully with the pioneer Inigation DtstnCt Standards. The developer is rasp P� f mcrional system that follows the lute % of the District sraadards- I look forward. to discussing these items or any other conceals you may have repr ing this �oject, Please let me know if you havo any questions or need addi tiolll Woaaation. Sincewly, William'1. Mason, F.E. Earl, Mason, & Stanfield, Inc. cc - Scott Woods — city of CaldweU Engineering Dept, via fas 455-3012 Chad zones — S & .A EnOu s, In,c. via fax 343-3381 fie r" Memorandum To: Steven Hasson, Community Development Director From: Ben Weymouth, Assistant City Engineer Re: SUB-99F-04, YMCA � Date: May 2004 The Engineering Department has reviewed the proposed final plat for YMCA and provides the following comments on the submitted final plat: 1. The City of Caldwell is providing $100,000.00 for the Indiana Ave. frontage improvements. If estimated costs of the frontage improvements exceed $100,000.00 dollars a construction security will have to be provided for those items not yet completed prior to signing of the Final Plat. 2. The final plat drawing shall be corrected in accordance with the marked -up copy done May 11, 2004 and mailed to Anderson -David & Associates, Inc. on May 11, 2004. 3. All public service health and safety requirements have been met. GNFO Page 1 of 1 04/10/2004 16:34 FkX 9054594491 PIONEER IRRIGATION 10001 Pioneer Irrigation District A 0. BOX 429 - CALOWELL. IDAHO 33806 JEFF SCOTT X13j 4%3517 Superinmadent XkRK M SCHKle NAMA KELLEHER Ain Supatamndent Secretary-Ttenum April 1 9, 2004 City of Caldwell Community Development Department Fax: 455-3050 Attn: Jacqueline Hernandez Re: Case No. SUB-991~ -04 - Final Plat (YMCA) To Whom It May Concern: °�! r APR 1 ,I i : r Please be advised that Pioneer Irrigation District has not yet reviewed plans dealing with the relocation of 25.1 Lateral along the frontage of the YMCA property. It is our concern, that Pioneer Irrigation District approve said plans prior to final plat being, given. For this reason, Pioneer Irrigation District would request that final plat be denied at this time, to assure that the appropriate layout of the 25,1 Lateral is platted. At this tinie, all conversations dealing'Aith the 25.1 Lateral have all been preliminary, and have not yet been approved. it also shall be noted that the Lowline canal at the westerri end of the project has a 16-foot from top of bank prescriptive use easement It shall also be noted that the Dixie drain is a federal drain, having a 110-foot federal right-of-way. Said easements shall also be noted on final plat. NOTE: This fetter does not authorize any coastrnetion to commence until all the necessary agreements with Pioneer Irrigation District have boen executed and recorded. If you have any questions, please feel free to call. Sincer y V/ mar • F Zirschky Assistant Superintendent Cc: Scott Campbell - Moffatt, Thomas, Barrett, Rock & Fields via fax 395-5384 Bill Mason - Earl, Mason and Stanfield via fax 454-0979 Ben Weymouth •- City of Caldwell Engineering via fax 455-3003 r1 illy �D PA